You are on page 1of 1

A.

GENERAL NOTES :

ALL LEVELS INICATED ARE REFERENCED TO THE BLANTYRE ASSEMBLY DATUM

1. ALL STRUCTURAL, ELECTRICAL, CIVIL AND LANDSCAPING QUERIES ARE TO BE REFERENCED TO THE
RELEVANT CONSULTANTS DRAWINGS, SPECIFICATIONS AND DETAILS.
2. ALL PLUMBING QUERIES ARE TO BE REFERRED TO THE RELEVANT SPECIALIST CONSULTANT DRAWINGS,

A B C D E F G 3.
4.
SPECIFICATIONS & DETAILS.
ALL CONCRETE COLUMNS AND STRUCTURE TO STRUCTURAL ENGINEERS DETAILS & SPECIFICATIONS.
ALL SPECIFICATIONS WITH REGARD TO FIRE REGULATIONS, TO BE REFERRED TO CONSULTANTS DETAILS
AND SPECIFICATIONS.
5. ANY DISCREPANCY IN THE DRAWINGS, DIMENSIONS & SPECIFICATIONS TO BE BROUGHT TO THE THE ATTENTION
25.000 OF THE CONSULTANT AND THE ARCHITECT PRIOR TO ANY WORK BEING PUT IN HAND.
6. DIMENSIONS - ONLY FIGURED DIMENSIONS TO BE FOLLOWED, NO SCALING OF DRAWINGS WILL BE PERMITTED.
4.000 4.000 4.000 4.000 4.000 5.000
B. STRUCTURAL NOTES :

1. DRAWINGS ISSUED BY THABO KHULANI DESIGN STUDIO FOR CONSTRUCTION TO SITE ARE WITHOUT STRUCTURAL
0.230 10.778 0.230 1.525 0.230 6.928 0.230 2.195 0.230 2.195 0.230 2.
ENGINEERS NOTES FOR LINTOLS AND BEAMS OVER OPENINGS AND RECESSES.
THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE DRAWING ISSUED BY THE STRUCTURAL ENGINEER
WITH NOTES FOR LINTOLS, BEAMS, MOVEMENT JOINTS ETC.

C. CONTRACTOR NOTES :
01 CONTRACTOR TO RECONFIRM ALL SALIENT LEVELS WITH MUNICIPALITY PRIOR TO COMMENCEMENT OF WORK

A 1.
2.
3.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CO-ORDINATION OF ALL SERVICES.
THE CONTRACTOR SHALL COMPLY WITH ALL CIVIL DEFENCE REGULATIONS
THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR MECHANICAL, ELECTRICAL AND PLUMBING SERVICES
AND SPECIALISED ITEMS AND INCORPORATE THE DUCTS TO CONCEAL NECESSARY PIPES, CABLES AND
D3 W1 CONDUITS ETC. FOR THE CONSULTANTS APPROVAL PRIOR TO COMMENCEMENT OF WORK.

W1 W1 W1 W1 W1 W1 W3 4. THE CONTRACTOR SHALL INSPECT THE SITE PRIOR TO ANY WORK BEING PUT IN HAND AND TAKE INTO
W1 CONSIDERATION ALL ASPECTS OF THE WORKS, TO BE CARRIED OUT INCLUDING ANY DEWATERING, IF REQUIRED.
0.230

0.230
1 1 5.
THE COSTS OF THE DEWATERING TO BE SUBMITTED PRIOR TO WORK BEING COMMENCED ON SITE.
THE CONTRACTOR SHALL REPORT ANY DISCREPANCIES IN THE DRAWINGS, DIMENSIONS AND SPECIFICATIONS
TO THE CONSULTANT AND THE ARCHITECT PRIOR TO ANY WORK BEING PUT IN HAND.
6. ALL EQUIPMENT SHALL BE TO THE APPROVAL OF THE LOCAL CIVIL DEFENCE DEPARTMENT.

X 1376 X 1376
4.000

4.000
3.540
RO1 TUCK SHOP STORE
VINYL TILES
VINYL TILES

2.770
D2

0.230
D1
2 2
50mm THICK ISOBOARD ACOUSTIC
CEILING FIXED BELOW PURLIN
12.000

11.540

12.000
HALL
4.000

4.000

4.000
6.000

STAGE ENTRANCE 0.6MM GALVANIZED STEEL IBR ROOF


03 VINYL TILES D3 04 SHEETIN WITH CHROMADEK FINISH @
VINYL TILES
15 620
DETAIL AND SPEC. ROOF APEX
X 1376
X 1376

2461
0.230
3 3 EXPOSED LIGHT STEEL FABRICATED ROOF
D1 ABLUTION
TRUSS AS PER ENGINEER'S SPECIFICATIONS
VINYL TILES
D1
13 159
TOP OF BEAM

411 500
12 659 220 PLASTER & PAINT 220 220mm X 500mm
X 1376 X 1376 U/S OF BEAM
220mm X 500mm
4.000

4.000
3.540
.\Logos\Free-State-Department-of-Education-logo.jpg
12 248
U/S OF LINTEL reinforced concrete
reinforced concrete beam as per structural
beam as per structural MULTI PURPOSED HALL
D2 D2 D2 D2 engineer's specifications
engineer's specifications
VINYL TILES ON 30MM SCREED

2078
ON CONRETE SLAB TO ENG'S
FACEBRICK
DETAILS SUIT THE SPECIFIC DPC
0.230

0.230
SITE CONDITION X 1376 X 1376 DRAWING REVISIONS
4 4 10 170
TOP OF UFFL
DPC
DPC
NGL
W1 W1 W1 W1 W1 W4 W4 W4 W4
W1 W1

170
D3 D3
A 02
CONCRETE APRON
0.230 4.040 0.230 1.525 0.230 10.015 0.230 1.525 0.230 6.515 0.230 TO ENGINEER'S DETAIL

REINFORCED CONCRETE FOUNDATION


TO ENG'S DETAILS TO SUIT THE

4.000 4.000 4.000 4.000 4.000 5.000


SPECIFIC SITE CONDITION
SECTION A-A
25.000 scale 1:100

A B C D E F G

MULTI-PURPOSE HALL
PLAN
scale 1:100

02 10/08/2016 ISSUED FOR INFORMATION


01 4/08/2016 ISSUED FOR INFORMATION
G F E D C B A DATE DESCRIPTION

1 2 3 4
15 620 15 620 NOTE :
ROOF APEX ROOF APEX
All requirements of municipal and other authorities concerned have to be
corrugated corrugated corrugated adhered to. Contractors and Subcontractors are to check all dimensions and
0.6MM GALVANIZED STEEL IBR ROOF
polycarbonate sheet polycarbonate sheet polycarbonate sheet 0.6MM GALVANIZED STEEL IBR ROOF levels on the building site before commencing with any work.
SHEETIN WITH CHROMADEK FINISH @

2461
2461

SHEETIN WITH CHROMADEK FINISH @


Figured dimensions to be taken in preference to scaled measurements and
DETAIL AND SPEC. large scale details supersede small scale drawings.
0.6MM GALVANIZED STEEL IBR ROOF DETAIL AND SPEC.
SHEETIN WITH CHROMADEK FINISH @ The design and content of this drawing is the property of - TKDS CONSULTING
13 159 13 159 and the copyright thereof is reserved by them.
TOP OF BEAM TOP OF BEAM

411 500
DETAIL AND SPEC.
411 500

12 659 facebrick 12 659


U/S OF BEAM U/S OF BEAM
12 248 12 248
U/S OF LINTEL U/S OF LINTEL facebrick
W3
W1 W1 W1 W1 W1 W1 W1 W1

2078
2078

facebrick
D3

10 170 X 1376 10 170 X 1376


TOP OF UFFL TOP OF UFFL

170
170

ELEVATION 1
scale 1:100
ELEVATION 3
scale 1:100

A B C D E F G
4 3 2 1
15 620
15 620 ROOF APEX
ROOF APEX

corrugated corrugated corrugated


0.6MM GALVANIZED STEEL IBR ROOF 0.6MM GALVANIZED STEEL IBR ROOF
polycarbonate sheet polycarbonate sheet polycarbonate sheet

2461
SHEETIN WITH CHROMADEK FINISH @ SHEETIN WITH CHROMADEK FINISH @
2461

DETAIL AND SPEC. DETAIL AND SPEC.


0.6MM GALVANIZED STEEL IBR ROOF
SHEETIN WITH CHROMADEK FINISH @ 13 159
TOP OF BEAM
13 159

411 500
TOP OF BEAM
facebrick 149 President Reitz Street
411 500

DETAIL AND SPEC. 12 659


12 659 U/S OF BEAM PHYSICAL Westdene
U/S OF BEAM 9338
facebrick 12 248
12 248 U/S OF LINTEL BLOEMFONTEIN
U/S OF LINTEL South Africa

facebrick facebrick P.O. Box 2878


W1
2078

W1 W1 W1 W1 W1 W1 POSTAL
2078

Saxonwold
W4 W4 W4 W4 D3 2132
D3 D3
facebrick 10 170 X 1376 tel: +2751 430 7335
10 170 X 1376 TOP OF UFFL CONTACT tel: +2711 465 2168
TOP OF UFFL fax: +2711 467 7576
170

web: www.tkdsconsulting.com
170

ELEVATION 2 ELEVATION 4
scale 1:100
scale 1:100
BERGMANSHOOGTE PRIMARY
SCHOOL

PLANS; SECTION; ELEVATIONS

DRAWING NO.

MULTI-PURPOSE HALL- E

SCALE : DATE : CHECKED : STAGE:

1:100

You might also like