Work Planning Template Doc No: RF0737

Version: 3
Reference Material

Time Job/Task Location Person in Risk Tool


Charge Required

0800 De rust and painting on deck Deck Bosun TBT, Take 5

0800 Plimsol marking Deck/Over side C/O PTW, TBT, Take 5

0800 BTHRM Anti skid & walkway BTHRM Bosun TBT, Take 5

0800 De rust and paint fire fighting isolation Deck 3/O TBT, Take 5
valve and associated area

0800 Check all vapor manifold and reducers Deck Pump man TBT, Take 5

0800 Snap Back zone modification Deck Bosun TBT, Take 5

0800 A and D deck shelf measurement and Accommodation Bosun TBT, Take 5
planning

0800 ME turbocharger maintenance ER 1AE PTW,TBT, Take 5

0800 BT-T1 change oil FWD 2AE TBT, Take 5

0800 AE #3&4 cooler fittings change ER Fitter TBT, Take 5

0800 IG blower water washing ER 3AE TBT, Take 5

0800 Ballast pump 1&2 bulkhead seal lubrication ER 3AE TBT, Take 5

0800 Boiler #2 pilot burner cleaning ER 3AE TBT, Take 5

0800 Emcy Generator check Em. Gen. RM ETO TBT, Take 5

0800 Steering gear limit switch check/test ER ETO TBT, Take 5

0800 ER emc’y lamps installation ER ETO TBT, Take 5

0800 CPP plant alarm test & elect motor megger ER ETO TBT, Take 5
test

0800 TBT, Take 5