Worker Hospital Health Center Pressure Calculations

This document is an engineering verification calculation for the external static pressure of two generator smoke exhaust fans (EAF-G-01) located on the roof of the critical utility plant for a worker hospital and integrated health center project in Ras Laffan, Qatar. It includes calculations of the specified and calculated external static pressures, supporting documents, and results showing that the calculated pressure is higher than specified, so an external static pressure of 300 Pascals will be provided.

Uploaded by

ibnrafeeq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
119 views12 pages

Worker Hospital Health Center Pressure Calculations

This document is an engineering verification calculation for the external static pressure of two generator smoke exhaust fans (EAF-G-01) located on the roof of the critical utility plant for a worker hospital and integrated health center project in Ras Laffan, Qatar. It includes calculations of the specified and calculated external static pressures, supporting documents, and results showing that the calculated pressure is higher than specified, so an external static pressure of 300 Pascals will be provided.

Uploaded by

ibnrafeeq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &

INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA


Issue date: 16/Feb/2016

PRIVATE ENGINEERING OFFICE PROJECTS

Project’s(representative)PICTURE
ENGINEERING VERIFICATION CALCULATION FOR
Gen-set smoke exhaust fans External Static Pressure
EAF-G-01 (Typical 2 NOS)
Construction, Completion & Maintenance of Worker Hospital &
Integrated Health Center at Ras Laffan Industrial Area

PEO PROJECT No.: 11009


Document
QACC-WH-DCA-02-H-066 Revision No.: 0
No.:

Issue Status: For Approval Project Phase: Construction

Prepared by: Reviewed by: Reviewed by: Approved by:

Rajmohon Ahmed El
Name Md.Musthafa Simon Gardener
Rajkumar Singh Ghazouly

Mechanical
Design Manager - MEP Manager - Project Manager -
Job Title Engineer -
ETA QACC QACC
ETA

Signature

Date 16/Feb/2016 16/Feb/2016 16/Feb/2016 16/Feb/2016

Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 1 of 12


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 16/Feb/2016

Controlled DAR AL-


1 Issued to:
Copy No: HANDASAH

Table of Contents
Section Description Page No.

1 Verification calculation Summary of External static pressure


2 Gen set smoke exhaust fans – EAF-G-01 ( 2 NOS) External static pressure calculation
sheet
3 Supporting Documents
1. Reference List
2. HVAC IFC Schedule
3. HVAC IFC layout

4 Result

Appendix A List and Samples of Standard Forms – Not Applicable -NA-

Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 2 of 12


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 16/Feb/2016

1. VERIFICATION CALCULATION
SUMMARY OF EAF-G-01
(Typical 2 NOS)EXTERNAL STATIC
PRESSURE CALCULATION

Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 3 of 12


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 16/Feb/2016

2. ATRIUM FANS EAF-G-01 (Typical 2


NOS)
EXTERNAL STATIC PRESSURE
CALCULATION SHEET

Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 4 of 12


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 16/Feb/2016

3. SUPPORTING
DOCUMENTS

The list of Supporting Documents for This Engineering Verification calculation attached
herein with this submittal as follows:

Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 5 of 12


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 16/Feb/2016

1. Reference list
2. HVAC IFC Schedule – WHIHC (RLC)
3. HVAC layout – WHIHC (RLC)
4. Datas Used For Calculation – WHIHC (RLC)

Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 6 of 12


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 16/Feb/2016

3.1 REFERENCE LIST

3.1 Reference List

.
Reference Description Reference No.
No
1. M-SCH-EQ-SHT-02
1 AHU Schedule

Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 7 of 12


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 16/Feb/2016

1. MH100R-CUP-SHT-02 Rev 4A
2 HVAC IFC layout
2. MH100G-CUP-SHT-01 Rev4A

3.2 HVAC IFC SCHEDULE –


WHIHC (RLC)
Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 8 of 12
CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 16/Feb/2016

3.3 HVAC IFC LAYOUT -


WHIHC (RLC)

Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 9 of 12


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 16/Feb/2016

3.4 HVAC LAYOUT -


WHIHC (RLC)

Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 10 of 12


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 16/Feb/2016

3.5 DATAS USED FOR


CALCULATION

Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 11 of 12


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 16/Feb/2016

4.RESULT
From the verification calculation, below is the summary of Specified and Calculated (Verified) External
static pressure for GEN-SET SMOKE EXHAUST FANS EAF-G-01 ( Typical for 2 nos) located in
CUP- ROOF

External static pressure (in External


Sl Pascal) static
No. FAN Tag No Location Of FAN pressure to
Design Calculated
be offered,
specified Value
(in pascal)

EAF-G-01
CUP - ROOF
1 ( Typical for 2 200 238 300
nos)

Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 12 of 12