You are on page 1of 1

D08

SHOP IN TRACK
22
Stabling Track 1 : 352m
Stabling Track 2 : 336m
Stabling Track 3 : 339m
30.0106
D13 D14 D17 25 D17
Stabling Track 4 : 341m
29 D17 Stabling Track 5 : 341m
28 Stabling Track 6 : 350m D17
D06 40.0301 40.0201
26 30.0101 Manual Cleaning Track 1 : 182m
40.0202 Manual Cleaning Track 2 : 182m D16
D15
30 Wheel Turning Track : 363m(from Wheel turnin
g Shop to Stopper : 195m)

D21 23 & 24
Emergency Repair Track : 365m(from Emer
gency Repair Shop to Stopper : 195m)

BACK GATE
31 D05
32
40.0101

D12

50.0401
40.0103 27
50.0201
D01
D20 50.0202
50.0501 40.0302

D09 27
D11 D18 D04 50.0501

D02

27

LEGEND 50.0501

NO. NAME ABB. Code No. Items Unit Q'ty


30.0101 Gantry Crane(2.8t) lot 1
D01 SITE ADMINISTRATION OFFICE SA
30.0104 Motor Car set 2
D02 WORKSHOP OFFICE WO
30.0106 Overhead Crane(5t) set 1
D03 INFRASTRUCTURE MAINTENANCE OFFICE IM 40.0101 Shunting Locomotive set 1
D04 WORKSHOP WS 40.0102 Fuel Feeder set 2
D05 INSPECTION SHED IS 40.0103 Vehicles lot 1
D06 INFRASTRUCTURE WORKSHOP IW 40.0201 Automatic Car Washing System set 1
40.0202 Silica Treating System set 1
D07 MAIN GATE HOUSE MH
40.0203 Water Treatment System lot 1
D08 GATE HOUSE GH
40.0301 Incinerator lot 1
D09 RESCUE CAR GARAGE & STORE RCG D21 INCINERATOR Crew Alarm System
40.0302 lot 1
D10 CAR GARAGE 1 CGA 22 FUEL TANK 50.0201 Derailment Rescue Equipment lot 1
D11 CAR GARAGE 2 CGB 23 WATER SUPPLY STORAGE AND TANK PUMP ROOM 50.0202 Monorail Crane(2t) lot 1
D12 SHUNTING LOCO SHED SL 24 FIREFIGHTING STORAGE AND TANK PUMP ROOM 50.0401 Office Furniture General lot 1

D13 HAZARDOUS STORE HS 25 AUTOMATIC CAR WASHING SYSTEM 50.0501 Canteen Equipment lot 1

D14 INDUSTRIAL WASTEWATER TREATMENT PLANT IP 26 GANTRY CRANE


D15 DOMESTIC WASTEWATER TREATMENT PLANT DP 27 CAR PARKING
D16 MANUAL CLEANING DECK MCD 28 STOCK YARD
D17 DRIVER'S DECK DD 29 FOOT BRIDGE
D18 GARBAGE COLLECTION SITE GCS 30 RAIL/ROAD TRANSFER POINT
D19 MOTORBIKE PARKING SHED 1 MPA 31 MULTIPURPOSE LAWN
D20 MOTORBIKE PARKING SHED 2 MPB 32 FLAG POLE

NOTES:
CP101 - ELEVATED STRUCTURE AND STATIONS JAKARTA MASS
ENDORSED BY DAISUKE NANJO RAPID TRANSIT PROJECT PHASE 1
PT MRT Jakarta (LEBAK BULUS - TB. SIMATUPANG)

APPROVED BY YASUYOSHI NOMURA NOTICED BY NAME SIGNATURE

Depot General Layout


PRESIDENT DIRECTOR DONO BOESTAMI
VERIFIED BY
1 17/06/2016 PEI Modification according to change Architecture PEI SJI TWJO
DIRECTOR
1 17/06/2015 PEI Revised according to modify the depot arrangement layout PEI SJI TWJO M. NASYIR
OF
0

Rev.
22/05/2015

Date
PEI

Drawn
By
1st Issue for Approval

Description
PEI

Designed
by
SJI

Chk'd
TWJO

App'd
DESIGNED BY JAEHOON YOO SJI/PEI
PT.Sojitz Indonesia / PT.PEN Indonesia
CONSTRUCTION
PROJECT MANAGER HERU NUGROHO
NONE 1-DPT-DWE-8801 2