TEST AWAL LABORATORIUM

CBR ON PLACE SUB BASE LAYER 1


TRIALL COMPACTION CBR SUB GRADE
CBR ON PLACE BASE COURSE
PEKERJAAAN :
Pembuatan Taxiway Baru (150 m x 23 m), Apron Baru (238 m x 110 m)
Dan Fillet (403,125 m2) Termasuk Marking

DATA TEST :

• SONDIR DAN HAND BORING


• PENGUJIAN PROPERTIES AGREGAT
• KEAUSAN AGREGAT
• TEST AWAL LABORATORIUM
• TRIALL COMPACTION CBR SUB GRADE
• JOB MIX DESIGN CTBC
• PENGUJIAN GEOSINTETIK
MIXING CONTROL SUB BASE
CBR ON PLACE SUB GRADE
SANDCONE TEST TOP SUB BASE
CBR ON PLACE CTBC
MIXING CONTROL CTBC
COMPRESSIVE STRENGTH TEST CTBC
PEKERJAAAN :
Pembuatan Taxiway Baru (150 m x 23 m), Apron Baru (238 m x 110 m)
Dan Fillet (403,125 m2) Termasuk Marking

DATA TEST :

• CBR ON PLACE SUB GRADE


• CBR ON PLACE SUB BASE LAYER 1
• CBR ON PLACE TOP SUB BASE
• MIXING CONTROL SUB BASE
• SANDCONE TEST TOP SUB BASE
• CBR ON PLACE CTBC
• COMPRESSIVE STRENGTH TEST CTBC
PEKERJAAAN :
Pembuatan Taxiway Baru (150 m x 23 m), Apron Baru (238 m x 110 m)
Dan Fillet (403,125 m2) Termasuk Marking

DATA TEST :

• DESIGN MIX FORMULA BETON


• CBR ON PLACE SUB GRADE TAXIWAY
• CBR ON PLACE SUB BASE TAXIWAY
• HOTBIN AMP AGGREGAT TEST
• JOB MIX FORMULA AC
• JOB MIX FORMULA ATB
• DAILY CONTROL HOTMIX ATB
• DAILY CONTROL HOTMIX AC & CORE DRILL
DAILY CONTROL HOTMIX ATB
DAILY CONTROL HOTMIX AC & CORE DRILL
CBR ON PLACE SUB GRADE TAXIWAY
CBR ON PLACE SUB BASE TAXIWAY
HOTBIN AMP AGGREGAT TEST
JOB MIX FORMULA ATB
JOB MIX FORMULA AC
PEKERJAAAN :
Galian dan Pembuangan Di Daerah Sisi Udara Untuk
Pemantapan Lahan Disisi Udara dan Darat, 117.250
M3

DATA TEST :

• DYNAMIC CONE PENETROMETER (DCP)


PEKERJAAAN :
Galian dan Pembuangan Di Daerah Sisi Udara Untuk
Pemantapan Lahan Disisi Udara dan Darat, 117.250 M3

DATA TEST :

• DYNAMIC CONE PENETROMETER (DCP)


DYNAMIC CONE PENETROMETER
PEKERJAAAN :

PEKERJAAN PEMBUATAN GSE TERMINAL BARU

DATA TEST :

• PENGUJIAN PROPETIES AGREGAT


• CBR SUB GRADE
• PENGUJIAN GEOSINTETIK
• CBR SUB BASE
• CBR BASE COURSE
• HOTBIN AMP AGGREGAT TEST
• JOB MIX FORMULA AC
• DAILY CONTROL HOTMIX AC & CORE DRILL
PEKERJAAAN :

PEKERJAAN PEMBUATAN GSE TERMINAL BARU

DATA TEST :

• PENGUJIAN PROPETIES AGREGAT


• CBR SUB GRADE
• PENGUJIAN GEOSINTETIK
PEKERJAAAN :

PEKERJAAN PEMBUATAN GSE TERMINAL BARU

DATA TEST :

• CBR SUB BASE


• CBR BASE COURSE
• HOTBIN AMP AGGREGAT TEST
• JOB MIX FORMULA AC
• DAILY CONTROL HOTMIX AC & CORE DRILL