Professional Documents
Culture Documents
bf = ( L0/6+ 6Df) + bw
bf = ( LO/12+ 3Df) + bw 786 733 200 794.75 1625 890.43 733 515.21 786
Ast Required 551.66
Main steel
a) At Mid Span :- Top N - # mm 2-10Φ 2-10Φ 2-10Φ 2-10Φ 2-10Φ 2-10Φ 2-10Φ 2-10Φ 2-10Φ
Bottom Bent N- # mm 2-12Φ 2-12Φ 1-10Φ
Bottom Straight N- # mm 2-12Φ 2-12Φ 2-12Φ 2-12Φ 2-16Φ 2-12Φ 2-12Φ 2-12Φ 2-12Φ
Provided Ast Sq.mm 226.19 226.19 226.19 226.19 559 226.19 226.19 452 302
Effective depth mm 270 270 270 270 420 270 270 350 350
Mur Provided KN.m 169.659 577.24
8 Equivalent UDL For Shear
a) Slab Right
Load Wul KN/m 6.17 13.05 1.99 7.1 6.17 13.05 13.05 6.17
b) Slab Left
Load Wu2 KN/m 10.27 10.27
c) Wall Wuw KN/m 3 3 3 3 3 3 3 3 16.75
d) Self Wus KN/m 1.5 1.5 1.5 1.5 2.6 1.5 1.5 1.5 2.1
e) Total Wue KN/m 10.6 17.55 6.49 11.6 10.7 27.82 17.55 27.82 43.3
9 Design for Shear
a) Vu.max = 1/2 Wue L KN 17.32 23.03 4.6 19.47 20.05 36.51 23.03 36.51 70.32
b) Astl N1- # mm 226.19 157.07 226.19 226.19 559 226.19 157.07 226.19 302
c) Vur.min KN -
d) VuD KN
e) Vus = VuD - Vus KN
f) Des. Stirr. # - s mm
g) Min. Stirr. Φ - s mm 6Φ-150c/c 6Φ-150c/c 6Φ-150c/c 6Φ-150c/c 6Φ-150c/c 6Φ-150c/c 6Φ-150c/c 6Φ-150c/c 6Φ-150c/c
10 Load transferred to C40,C41 C37,C13 C23,B5 C29,C40 C7,C20 C30,C31 C37,C13 C30,C32 C40,C36,
column at each end B20,C1,
C3,C36.
F AND R
B14 [R] B15 [L] B18' [R]
1.419 3.357 2.4
200 200 200
380 300 380
105 105 105
2 9.37
18.39
1.5
22.43
5.64 23.2
200 830.4
2-10Φ 2-10Φ
2-10Φ 2-10Φ
157.07 157
350 350
2
18.93
2.1 2.1
22.43 38.66
15.91
633.25
6Φ-150c/c 6Φ-150c/c
C23,B5 C25,C26