Summary of Structural Calculation of 1-Barrel Box Culvert
Summary of Structural Calculation of 1-Barrel Box Culvert
Cover of reinforcement bar (between concrete surface and center of reinforcement bar)
Side wall Outside cm 6.0
Inside cm 6.0
Top slab Upper cm 6.0
Lower cm 6.0
Bottom slab Lower cm 6.0
Upper cm 6.0
2 Design Parameters
1/1 SingleBoxCulvert/01Summary
STRUCTURAL CALCULATION OF BOX CULVERT Type: B2.00m x H1.50m Class III Road
Soil Cover Depth: 6.0 m
1 Dimensions and Parameters
Basic Parameters asumsi
Ka: Coefficient of static earth pressure 0.5
w: Unit weight of water (t/m3) 1.00 t/m3
d: Unit weight of soil (dry) (t/m3) 1.80 t/m3
Gwd
s: Unit weight of soil (saturated) (t/m3) 2.00 t/m3
D
c: Unit weight of reinforced concrete (t/m3) 2.40 t/m3
ck: Concrete Design Strength 300 kgf/m2
ca Allowable Stress of Concrete 100 kgf/m2
t2
sa: Allowable Stress of Reinforcement Bar 2400 kgf/m2 400
a: Allowable Stress of Shearing (Concrete) 10 kgf/m2
sy: Yielding Point of Reinforcement Bar 5000 kgf/m2
n: Young's Modulus Ratio 8
H
Hf Fa: Safety factor against uplift 1.2
HT
Basic Dimensions
Hf
H: Internal Height of Box Culvert 3 1.50 m
t3 B: Internal Width of Box Culvert 4 2.00 m
t1 t1 Hf: Fillet Height 0.15 m
B t1: Thickness of Side Wall 5 0.25 m (> 0.25m)
t2: Thickness of Top Slab 6 0.25 m (> 0.25m)
BT t3: Thickness of Invert (Bottom Slab) 7 0.25 m (> 0.25m)
BT: Gross Width of Box Culvert 2.50 m
HT: Gross Height of Box Culvert 2.00 m
D: Covering Depth 8 6.00 m
Gwd: Underground Water Depth for Case 1, 2 6.00 m (= D)
hiw: Internal Water Depth for Case 1, 2 0.00 m
for Case 3, 4 1.50 m
Dimension of frame
t1 B t1
H0: Height of frame t2/2 + H + t3/2 1.750 m
D1 B0: Width of frame B + t1 2.250 m
t2 D1: Covering depth at middle of top slab D + t2/2 6.125 m
H H0
t3
B0
1/ 6 (1)SingleBoxCulvert, 02Load
Load distribution of truck tire
Case.L1: Pvt1 = 0.0590 tf/m2, B= 2.250 m Combination for Case.L2 (2) (2) (3) (3)
Pvt2 = 0.0590 tf/m2, B= 2.250 m a) + b) a) + c) a) + b) a) + c)
Case.L2: Pvt1 = 0.1181 tf/m2, B= 2.250 m Distributed load total 0.1181 0.0738 0.1181 0.0590
Pvt2 = 0.0000 tf/m2, B= 0.000 m Select the combination case of 0.1181 tf/m2,
for Case.L2, which is the largest load to the top slab.
In case of covering depth (D) is over 3.0m, uniform load of 1.0 tf/m2 is applied on the top slab of culvert instead of live load calculated above.
2/ 6 (1)SingleBoxCulvert, 02Load
3 Load calculation
Case 1: Box Culvert Inside is Empty, Underground Water up to Top slab, Track load Case. L1
1) vertical load against top slab
Acting Load (tf/m2)
Wtop= (t2*BT+Hf^2)*c/B0 Wtop= 0.6907
Pvd=Gwd*gd+(D-Gwd)*gs Pvd= 10.8000
Pvt1 Pvt1= 1.0000
Pvt2 Pvt2= 0.0000
Pv1= 12.4907
5) ground reaction
Acting Load (tf/m2)
Wbot=(t3*BT+Hf^2)*c/B0 Wbot= 0.6907
Wtop Wtop= 0.6907
Ws=Wsw*2/B0 Ws= 0.8000
Pvd Pvd= 10.8000
Pvt1 Pvt1= 1.0000
Pvt2 Pvt2= 0.0000
Wiw=(hiw*B-2Hf^2)*w/B0 Wiw= 0.0000 hiw: internal water depth 0.00 m
Up=-U/B0 U= -2.2222
Q= 11.7591
3/ 6 (1)SingleBoxCulvert, 02Load
Case 2: Box Culvert Inside is Empty, Underground Water up to Top slab, Track load Case. L2
1) vertical load against top slab
Acting Load (tf/m2)
Wtop= (t2*BT+Hf^2)*c/B0 Wtop= 0.6907
Pvd=Gwd*gd+(D-Gwd)*gs Pvd= 10.8000
Pvt1 Pvt1= 1.0000
Pvt2 Pvt2= 0.0000
Pv1= 12.4907
5) ground reaction
Acting Load (tf/m2)
Wbot=(t3*BT+Hf^2)*c/B0 Wbot= 0.6907
Wtop Wtop= 0.6907
Ws=Wsw*2/B0 Ws= 0.8000
Pvd Pvd= 10.8000
Pvt1 Pvt1= 1.0000
Pvt2 Pvt2= 0.0000
Wiw=(hiw*B-2Hf^2)*w/B0 Wiw= 0.0000 hiw: internal water depth 0.00 m
Up=-U/B0 U= -2.2222
Q= 11.7591
4/ 6 (1)SingleBoxCulvert, 02Load
Case 3: Box Culvert Inside is Full, Underground Water up to invert, Track load Case. L1
1) vertical load against top slab
Acting Load (tf/m2)
Wtop= (t2*BT+Hf^2)*c/B0 Wtop= 0.6907
Pvd=D*d Pvd= 10.8000
Pvt1 Pvt1= 1.0000
Pvt2 Pvt2= 0.0000
Pv1= 12.4907
5) ground reaction
Acting Load (tf/m2)
Wbot=(t3*BT+Hf^2)*c/B0 Wbot= 0.6907
Wtop Wtop= 0.6907
Ws=Wsw*2/B0 Ws= 0.8000
Pvd Pvd= 10.8000
Pvt1 Pvt1= 1.0000
Pvt2 Pvt2= 0.0000
Wiw=(hiw*B-2Hf^2)*w/B0 Wiw= 1.3133 hiw: internal water depth 1.500 m
Up=0 U= 0.0000
Q= 15.2947
5/ 6 (1)SingleBoxCulvert, 02Load
Case 4: Box Culvert Inside is Full, Underground Water up to invert, Track load Case. L2
1) vertical load against top slab
Acting Load (tf/m2)
Wtop= (t2*BT+Hf^2)*c/B0 Wtop= 0.6907
Pvd=D*d Pvd= 10.8000
Pvt1 Pvt1= 1.0000
Pvt2 Pvt2= 0.0000
Pv1= 12.4907
5) ground reaction
Acting Load (tf/m2)
Wbot=(t3*BT+Hf^2)*c/B0 Wbot= 0.6907
Wtop Wtop= 0.6907
Ws=Wsw*2/B0 Ws= 0.8000
Pvd Pvd= 10.8000
Pvt1 Pvt1= 1.0000
Pvt2 Pvt2= 0.0000
Wiw=(hiw*B-2Hf^2)*w/B0 Wiw= 1.3133 hiw: internal water depth 1.500 m
Up=0 U= 0.0000
Q= 15.2947
6/ 6 (1)SingleBoxCulvert, 02Load
4 Analysis of Plane Frame
Case 1: Box Culvert Inside is Empty, Underground Water up to Top slab, Track load Case. L1
k1 = 1.0
k2 = H0t23/(B0t13) = 0.7778
k3 = H0t33/(B0t13) = 0.7778
A = -D B = -C R =0
A = -1.94596 C = -1.90391
B = 1.90391 D = 1.94596
1/16 (2)SingleBoxCulvert03MSN
MAB = k1(2A +B) - CAB = -4.0935 tf・m
MBA = k1(2B+A)+CBA = 3.7887 tf・m
MBC = k2(2B+C) - CBC = -3.7887 tf・m
MCB = k2(2C+B)+CCB = 3.7887 tf・m
MCD = k1(2C+D) - CCD = -3.7887 tf・m
MDC =k1 (2D+ C)+CDC = 4.0935 tf・m
MDA = k3(2D+A) - CDA = -4.0935 tf・m
MAD = k3(2A+D)+CAD = 4.0935 tf・m
c) Bending Moment
MA = MAB = -4.093 tf・m
MB = -MBA = -3.789 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SAB - w1x - (w2 - w1)x2/(2L)
= 7.5971 -9.6500 x + 1.0000 x2 , x = 8.785
0.865
Bending moment at x = 0.8648 m is;
Mmax = SABx - w1x2/2 - (w2-w1)x3/(6L) + MAB = -0.916 tf・m
2/16 (2)SingleBoxCulvert03MSN
2-2) Top Slab
a) Shearing Force at joint
c) Bending Moment
MB = MBC = -3.789 tf・m
MC = -MCB = -3.789 tf・m
The maximum bending moment occurs at the center of member due to symmetry loading distribution.
Bending moment at x = 1.125 m is;
Mmax = SBCx - w1x2/2 - w2(x-a)2/2 + MBC = 4.116 tf・m
3/16 (2)SingleBoxCulvert03MSN
b) Shearing Force at 2d point from joint
Shearing force at the point with a distance of 2d from joint is calculated by following equation.
Sx = SCD - w1x - (w2 - w1)x2/(2L)
c) Bending Moment
MC = MCD = -3.789 tf・m
MD = -MDC = -4.093 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SCD - w1x - (w2 - w1)x2/(2L)
= 6.2279 -6.1500 x -1.0000 x2 , x = -7.035
0.885
Bending moment at x = 0.8852 m is;
Mmax = SCDx - w1x2/2 - (w2-w1)x3/(6L) + MCD = ###### tf・m
c) Bending Moment
MD = MDA = -4.093 tf・m
MA = -MAD = -4.093 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SDA - w1x - (w2 - w1)x2/(2L)
= 14.9520 -13.2907 x , x = 1.125
4/16 (2)SingleBoxCulvert03MSN
Case 2: Box Culvert Inside is Empty, Underground Water up to Top slab, Track load Case. L2
k1 = 1.0
k2 = H0t23/(B0t13) = 0.77778
k3 = H0t33/(B0t13) = 0.77778
A = -D B = -C R =0
A = -1.94596 C = -1.90391
B = 1.90391 D = 1.94596
5/16 (2)SingleBoxCulvert03MSN
MAB = k1(2A +B) - CAB = -4.0935 tf・m
MBA = k1(2B+A)+CBA = 3.7887 tf・m
MBC = k2(2B+C) - CBC = -3.7887 tf・m
MCB = k2(2C+B)+CCB = 3.7887 tf・m
MCD = k1(2C+D) - CCD = -3.7887 tf・m
MDC =k1 (2D+ C)+CDC = 4.0935 tf・m
MDA = k3(2D+A) - CDA = -4.0935 tf・m
MAD = k3(2A+D)+CAD = 4.0935 tf・m
c) Bending Moment
MA = MAB = -4.093 tf・m
MB = -MBA = -3.789 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SAB - w1x - (w2 - w1)x2/(2L)
= 7.5971 -9.6500 x + 1.0000 x2 , x = 8.785
0.865
Bending moment at x = 0.8648 m is;
Mmax = SABx - w1x2/2 - (w2-w1)x3/(6L) + MAB = -0.916 tf・m
6/16 (2)SingleBoxCulvert03MSN
2-2) Top Slab
a) Shearing Force at joint
c) Bending Moment
MB = MBC = -3.789 tf・m
MC = -MCB = -3.789 tf・m
The maximum bending moment occurs at the center of member due to symmetry loading distribution.
Bending moment at x = 1.125 m is;
Mmax = SBCx - w1x2/2 - w2(x-a)2/2 + MBC = 4.116 tf・m
7/16 (2)SingleBoxCulvert03MSN
b) Shearing Force at 2d point from joint
Shearing force at the point with a distance of 2d from joint is calculated by following equation.
Sx = SCD - w1x - (w2 - w1)x2/(2L)
(i) In case of x1 = 0.380 m
Sx1 = 3.747 tf
(ii) In case of x2 = 1.370 m
Sx2 = -4.074 tf
c) Bending Moment
MC = MCD = -3.789 tf・m
MD = -MDC = -4.093 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SCD - w1x - (w2 - w1)x2/(2L)
= 6.2279 -6.1500 x -1.0000 x2 , x = -7.0352
0.8852
Bending moment at x = 0.8852 m is;
Mmax = SCDx - w1x2/2 - (w2-w1)x3/(6L) + MCD = -0.9164 tf・m
c) Bending Moment
MD = MDA = -4.093 tf・m
MA = -MAD = -4.093 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SDA - w1x - (w2 - w1)x2/(2L)
= 14.9520 -13.2907 x , x = 1.1250
8/16 (2)SingleBoxCulvert03MSN
Case 3: Box Culvert Inside is Full, Underground Water up to invert, Track load Case. L1
k1 = 1.0
k2 = H0t23/(B0t13) = 0.77778
k3 = H0t33/(B0t13) = 0.77778
A = -D B = -C R =0
A = -2.23467 C = -2.14635
B = 2.14635 D = 2.23467
9/16 (2)SingleBoxCulvert03MSN
MAB = k1(2A +B) - CAB = -3.86892 tf・m
MBA = k1(2B+A)+CBA = 3.60012 tf・m
MBC = k2(2B+C) - CBC = -3.60012 tf・m
MCB = k2(2C+B)+CCB = 3.60012 tf・m
MCD = k1(2C+D) - CCD = -3.60012 tf・m
MDC =k1 (2D+ C)+CDC = 3.86892 tf・m
MDA = k3(2D+A) - CDA = -3.86892 tf・m
MAD = k3(2A+D)+CAD = 3.86892 tf・m
c) Bending Moment
MA = MAB = -3.869 tf・m
MB = -MBA = -3.600 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SAB - w1x - (w2 - w1)x2/(2L)
= 5.4583 -6.0875 x + 0.0214 x2 , x = 283.184
0.899
Bending moment at x = 0.8995 m is;
Mmax = SABx - w1x2/2 - (w2-w1)x3/(6L) + MAB = -1.417 tf・m
10/16 (2)SingleBoxCulvert03MSN
2-2) Top Slab
a) Shearing Force at joint
c) Bending Moment
MB = MBC = -3.600 tf・m
MC = -MCB = -3.600 tf・m
The maximum bending moment occurs at the center of member due to symmetry loading distribution.
Bending moment at x = 1.125 m is;
Mmax = SBCx - w1x2/2 - w2(x-a)2/2 + MBC = 4.304 tf・m
11/16 (2)SingleBoxCulvert03MSN
b) Shearing Force at 2d point from joint
Shearing force at the point with a distance of 2d from joint is calculated by following equation.
Sx = SCD - w1x - (w2 - w1)x2/(2L)
(i) In case of x1 = 0.380 m
Sx1 = 2.841 tf
(ii) In case of x2 = 1.370 m
Sx2 = -3.148 tf
c) Bending Moment
MC = MCD = -3.600 tf・m
MD = -MDC = -3.869 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SCD - w1x - (w2 - w1)x2/(2L)
= 5.1292 -6.0125 x -0.0214 x2 , x = -281.43
0.851
Bending moment at x = 0.8505 m is;
Mmax = SCDx - w1x2/2 - (w2-w1)x3/(6L) + MCD = -1.417 tf・m
c) Bending Moment
MD = MDA = -3.869 tf・m
MA = -MAD = -3.869 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SDA - w1x - (w2 - w1)x2/(2L)
= 14.9520 -13.2907 x , x = 1.125
12/16 (2)SingleBoxCulvert03MSN
Case 4: Box Culvert Inside is Full, Underground Water up to invert, Track load Case. L2
k1 = 1.0
k2 = H0t23/(B0t13) = 0.77778
k3 = H0t33/(B0t13) = 0.77778
A = -D B = -C R =0
A = -2.23467 C = -2.14635
B = 2.14635 D = 2.23467
13/16 (2)SingleBoxCulvert03MSN
MAB = k1(2A +B) - CAB = -3.86892 tf・m
MBA = k1(2B+A)+CBA = 3.60012 tf・m
MBC = k2(2B+C) - CBC = -3.60012 tf・m
MCB = k2(2C+B)+CCB = 3.60012 tf・m
MCD = k1(2C+D) - CCD = -3.60012 tf・m
MDC =k1 (2D+ C)+CDC = 3.86892 tf・m
MDA = k3(2D+A) - CDA = -3.86892 tf・m
MAD = k3(2A+D)+CAD = 3.86892 tf・m
c) Bending Moment
MA = MAB = -3.869 tf・m
MB = -MBA = -3.600 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SAB - w1x - (w2 - w1)x2/(2L)
= 5.4583 -6.0875 x + 0.0214 x2 , x = 283.184
0.899
Bending moment at x = 0.8995 m is;
2 3
Mmax = SABx - w1x /2 - (w2-w1)x /(6L) + MAB = -1.417 tf・m
14/16 (2)SingleBoxCulvert03MSN
2-2) Top Slab
a) Shearing Force at joint
c) Bending Moment
MB = MBC = -3.600 tf・m
MC = -MCB = -3.600 tf・m
The maximum bending moment occurs at the center of member due to symmetry loading distribution.
Bending moment at x = 1.125 m is;
Mmax = SBCx - w1x2/2 - w2(x-a)2/2 + MBC = 4.304 tf・m
15/16 (2)SingleBoxCulvert03MSN
b) Shearing Force at 2d point from joint
Shearing force at the point with a distance of 2d from joint is calculated by following equation.
Sx = SCD - w1x - (w2 - w1)x2/(2L)
(i) In case of x1 = 0.380 m
Sx1 = 2.8414 tf
(ii) In case of x2 = 1.370 m
Sx2 = -3.1481 tf
c) Bending Moment
MC = MCD = -3.600 tf・m
MD = -MDC = -3.869 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SCD - w1x - (w2 - w1)x2/(2L)
= 5.1292 -6.0125 x -0.0214 x2 , x = -281.4
0.851
Bending moment at x = 0.8505 m is;
Mmax = SCDx - w1x2/2 - (w2-w1)x3/(6L) + MCD = -1.417 tf・m
c) Bending Moment
MD = MDA = -3.869 tf・m
MA = -MAD = -3.869 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SDA - w1x - (w2 - w1)x2/(2L)
= 14.9520 -13.2907 x , x = 1.125
16/16 (2)SingleBoxCulvert03MSN
Summary of Internal forces
Check M N S (tf)
Member Case
Point (tf・m) (tf) at joint at 2d
Side wall A -4.093 14.952 7.597 4.074
(left) Case.1 Middle -0.916 14.507 0.000 -
B -3.789 14.052 -6.228 -3.747
A -4.093 14.952 7.597 4.074
Case.2 Middle -0.916 14.507 0.000 -
B -3.789 14.052 -6.228 -3.747
A -3.869 14.952 5.458 3.148
Case.3 Middle -1.417 14.489 0.000 -
B -3.600 14.052 -5.129 -2.841
A -3.869 14.952 5.458 3.148
Case.4 Middle -1.417 14.489 0.000 -
B -3.600 14.052 -5.129 -2.841
Top slab B -3.789 6.228 14.052 9.306
Case.1 Middle 4.116 6.228 0.000 -
C -3.789 6.228 -14.052 -9.306
B -3.789 6.228 14.052 9.306
Case.2 Middle 4.116 6.228 0.000 -
C -3.789 6.228 -14.052 -9.306
B -3.600 5.129 14.052 9.306
Case.3 Middle 4.304 5.129 0.000 -
C -3.600 5.129 -14.052 -9.306
B -3.600 5.129 14.052 9.306
Case.4 Middle 4.304 5.129 0.000 -
C -3.600 5.129 -14.052 -9.306
Side wall C -3.789 14.052 6.228 3.747
(right) Case.1 Middle -0.916 14.507 0.000 -
D -4.093 14.952 -7.597 -4.074
C -3.789 14.052 6.228 3.747
Case.2 Middle -0.916 14.507 0.000 -
D -4.093 14.952 -7.597 -4.074
C -3.600 14.052 5.129 2.841
Case.3 Middle -1.417 14.489 0.000 -
D -3.869 14.952 -5.458 -3.148
C -3.600 14.052 5.129 2.841
Case.4 Middle -1.417 14.489 0.000 -
D -3.869 14.952 -5.458 -3.148
Invert D -4.093 7.597 14.952 9.902
Case.1 Middle 4.317 7.597 0.000 -
A -4.093 7.597 -14.952 -9.902
D -4.093 7.597 14.952 9.902
Case.2 Middle 4.317 7.597 0.000 -
A -4.093 7.597 -14.952 -9.902
D -3.869 5.458 14.952 9.902
Case.3 Middle 4.542 5.458 0.000 -
A -3.869 5.458 -14.952 -9.902
D -3.869 5.458 14.952 9.902
Case.4 Middle 4.542 5.458 0.000 -
A -3.869 5.458 -14.952 -9.902
Case.2
M= 4.0935 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 14.9520 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 7.5971 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 4.0745 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 27.38 cm
Solving the formula shown below, c = 112.914 kgf/cm2 ( -2E-05 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +407.91 c^2 -25257 c -3788494.00
s = nc/(nc+sa) = 0.2735
Asreq = (c*s/2 - N/(bd))bd/sa = 5.9922 cm2
Case.3
M= 3.8689 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 14.9520 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 5.4583 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 3.1481 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 25.88 cm
Solving the formula shown below, c = 109.867 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +409.77 c^2 -24137 c -3620544.14
s = nc/(nc+sa) = 0.2681
Asreq = (c*s/2 - N/(bd))bd/sa = 5.4274 cm2
Case.4
M= 3.8689 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 14.9520 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 5.4583 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 3.1481 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 25.88 cm
Solving the formula shown below, c = 109.867 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +409.77 c^2 -24137 c -3620544.14
s = nc/(nc+sa) = 0.2681
Asreq = (c*s/2 - N/(bd))bd/sa = 5.4274 cm2
The maximum requirement of reinforcement bar is 5.9922 cm2 in Case. 1 from above calculation.
Case. 1 2 3 4
Requirement 5.9922 5.9922 5.4274 5.4274 (cm2)
Case.2
M= 3.7887 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 14.0520 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 6.2279 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 3.7465 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 26.96 cm
Solving the formula shown below, c = 107.962 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +410.92 c^2 -23445 c -3516777.72
s = nc/(nc+sa) = 0.2646
Asreq = (c*s/2 - N/(bd))bd/sa = 5.4542 cm2
Case.4
M= 3.6001 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 14.0520 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 5.1292 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 2.8414 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 25.62 cm
Solving the formula shown below, c = 105.343 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +412.49 c^2 -22505 c -3375746.99
s = nc/(nc+sa) = 0.2599
Asreq = (c*s/2 - N/(bd))bd/sa = 4.9818 cm2
The maximum requirement of reinforcement bar is 5.4542 cm2 in Case. 1 from above calculation.
Case. 1 2 3 4
Requirement 5.4542 5.4542 4.9818 4.9818 (cm2)
Case.4
M= 3.6001 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 5.1292 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 14.0520 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 9.3055 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 70.19 cm
Solving the formula shown below, c = 97.059 kgf/cm2 ( -0.0003 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +417.31 c^2 -19613 c -2941965.97
s = nc/(nc+sa) = 0.2444
Asreq = (c*s/2 - N/(bd))bd/sa = 7.2542 cm2
The maximum requirement of reinforcement bar is 7.4429 cm2 in Case. 1 from above calculation.
Case. 1 2 3 4
Requirement 7.4429 7.4429 7.2542 7.2542 (cm2)
Case.2
M= 4.0935 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 7.5971 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 14.9520 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 9.9015 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 53.88 cm
Solving the formula shown below, c = 106.371 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +411.88 c^2 -22873 c -3430935.12
s = nc/(nc+sa) = 0.2618
Asreq = (c*s/2 - N/(bd))bd/sa = 7.8560 cm2
Case.3
M= 3.8689 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 5.4583 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 14.9520 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 9.9015 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 70.88 cm
Solving the formula shown below, c = 101.250 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +414.9 c^2 -21060 c -3159007.78
s = nc/(nc+sa) = 0.2523
Asreq = (c*s/2 - N/(bd))bd/sa = 7.8389 cm2
Case.4
M= 3.8689 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 5.4583 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 14.9520 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 9.9015 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 70.88 cm
Solving the formula shown below, c = 101.250 kgf/cm2 ( -1E-08 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +414.9 c^2 -21060 c -3159007.78
s = nc/(nc+sa) = 0.2523
Asreq = (c*s/2 - N/(bd))bd/sa = 7.8389 cm2
The maximum requirement of reinforcement bar is 7.8560 cm2 in Case. 1 from above calculation.
Case. 1 2 3 4
Requirement 7.8560 7.8560 7.8389 7.8389 (cm2)
Case.2
M= 0.9164 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 14.5073 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
n= 8 d' = 6 cm (protective covering depth)
c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 6.32 cm
Solving the formula shown below, c = 63.000 kgf/cm2 ( 0.0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +434.55 c^2 -9271.3 c -1390700.33
s = nc/(nc+sa) = 0.1736
Asreq = (c*s/2 - N/(bd))bd/sa = 0.0000 cm2 Tensile is on outside of member
The maximum requirement of reinforcement bar is 0.0000 cm2 in Case. 4 from above calculation.
Case. 1 2 3 4
Requirement - - - - (cm2)
Side outside outside outside outside
Case.2
M= 4.3170 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 7.5971 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
n= 8 d' = 6 cm (protective covering depth)
c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 56.82 cm
Solving the formula shown below, c = 109.457 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +410.02 c^2 -23988 c -3598130.50
s = nc/(nc+sa) = 0.2673
Asreq = (c*s/2 - N/(bd))bd/sa = 8.4167 cm2 Tensile is on inside of member
Case.3
M= 4.5416 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 5.4583 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
n= 8 d' = 6 cm (protective covering depth)
c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 83.21 cm
Solving the formula shown below, c = 110.625 kgf/cm2 ( -3E-05 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +409.31 c^2 -24414 c -3662102.88
s = nc/(nc+sa) = 0.2694
Asreq = (c*s/2 - N/(bd))bd/sa = 9.5228 cm2 Tensile is on inside of member
Case.4
M= 4.5416 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 5.4583 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
n= 8 d' = 6 cm (protective covering depth)
c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 83.21 cm
Solving the formula shown below, c = 110.625 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +409.31 c^2 -24414 c -3662102.88
s = nc/(nc+sa) = 0.2694
Asreq = (c*s/2 - N/(bd))bd/sa = 9.5228 cm2 Tensile is on inside of member
The maximum requirement of reinforcement bar is 9.5228 cm2 in Case. 3 from above calculation.
Case. 1 2 3 4
Requirement 8.4167 8.4167 9.5228 9.5228 (cm2)
Side inside inside inside inside
Required reinforcement for design is the maximum required reinforcement calculated above in 1) - 4).
Item Side wall Side wall Top slab Invert Side wall Top slab Invert
Point bottom top end end middle middle middle
Side outside outside outside outside inside inside inside
Calculation 1) 2) 3) 4) 5) 6) 7)
Requirement 5.992 5.454 7.443 7.856 0.000 9.010 9.523 (cm2)
Required R-bar Asreq cm2 5.99 - 5.45 7.44 9.01 7.86 9.52
Compressive stress c kgf/cm2 101.7 28.5 94.0 97.9 111.8 105.4 112.8
Allowable stress ca kgf/cm2 100.0 100.0 100.0 100.0 100.0 100.0 100.0
check ok ok ok check check check
Tensile stress s kgf/cm2 1834.6 176.5 1683.5 2230.8 2674.7 2348.1 2518.9
Allowable stress sa kgf/cm2 2400.0 2400.0 2400.0 2400.0 2400.0 2400.0 2400.0
ok ok ok ok check ok check
Shearing stress at joint kgf/cm2 4.00 0.00 3.28 7.40 0.00 7.87 0.00
Allowable stress a kgf/cm2 20.00 20.00 20.00 20.00 20.00 20.00 20.00
ok ok ok ok ok ok ok
Shearing stress at 2d 2d kgf/cm2 2.14 - 1.97 4.90 - 5.21 -
Allowable stress 2da kgf/cm2 10.00 - 10.00 10.00 - 10.00 -
ok - ok ok - ok -
Resisting Moment Mr kgfcm 402,937 335,262 400,886 386,848 385,467 388,781 403,333
Mr for compression Mrc kgfcm 402,937 335,262 400,886 386,848 385,467 388,781 403,333
x for Mrc cm 5.869 4.950 5.764 4.923 4.815 5.062 5.070
s for Mrc kgf/cm2 1790.0 2270.5 1837.0 2287.2 2356.6 2202.9 2198.0
Mr for tensile Mrs kgfcm 665,581 453,610 649,192 511,692 493,086 535,119 555,788
x for Mrs cm 6.586 5.665 6.499 5.686 5.562 5.836 5.867
c for Mrs kgf/cm2 159.2 127.5 156.0 128.1 124.2 133.0 134.0
Distribution bar (>As/6 and >Asmin) 12@250 12@250 12@250 12@250 12@250 12@250 12@250
Reinforcement As cm2 4.52 4.52 4.52 4.52 4.52 4.52 4.52
ok ok ok ok ok ok ok
Reinforcement bar for fillet 12@250 12@250