TARGET
Budgetary
ACTIVITIES Office Qty Unit of TIME FRAME REMARKS
Requirements
Measure
A. FIRE PREVENTION -
1. Radio plugging/Guesting Regional Office 1 Hour guested 2nd week of March Air trough local radio the Forest Fire
Batanes Prevention
PENRO Cagayan
Sanchez Mira
Aparri
Alcala No.
Solana
PENRO Sub-Office Tugeugarao
PENRO Isabela
Cabagan
Naguillan
Cauayan 12 100,000 March - April
No.
Palanan
San Isidro
PENRO Sub-office Roxas
PENRO Quirino
Nagtipunan
Diffun 8 50,000.00 March 10-31
PENRO N. Vizcaya No. of plugs
Aritao
Dupax
PENRO Sub-office Bayombong
4. Preparation and Installation of sign boards/bill Regional Office Sign boards/bill boards on forest fire
boards Batanes prevention installed in strategic locations.
PENRO Cagayan
Sanchez Mira
Aparri
Alcala
Solana
PENRO Sub-Office Tugeugarao
PENRO Isabela
Cabagan
Naguillan
Cauayan 4 No. 90,000 March
Palanan
San Isidro
PENRO Sub-office Roxas
PENRO Quirino
Nagtipunan
Diffun
PENRO N. Vizcaya 3 No. P30,000 January-February
Aritao 3 No. P30,000 January-February
Dupax 3 No. P30,000
PENRO Sub-office Bayombong
B. FIRE PREPAREDNESS
1. Identification and preparation of maps of all Regional Office 1 No March 15 Prepared GIS generated maps serves as
plantations (old & new) identified as fire prone areas. Batanes reference during fire suppression.
PENRO Cagayan
Sanchez Mira
Aparri
Alcala
Solana
PENRO Sub-Office Tugeugarao
PENRO Isabela
Cabagan
Naguillan
Cauayan 3 No. March
Palanan
San Isidro
PENRO Sub-office Roxas
PENRO Quirino
Nagtipunan
Diffun 1 No.. March 10
PENRO N. Vizcaya
Aritao
Dupax
PENRO Sub-office Bayombong
2. Train and mobilize the organized Barangay Forest Regional Office The CENRO concerned are responsible to
Protection Officer as Initial Attack Crews Batanes train the selected BFPO as Initial Attack
PENRO Cagayan Crews and members should be carefully
Sanchez Mira selected.
Aparri
Alcala
Solana
PENRO Sub-Office Tugeugarao
PENRO Isabela
Cabagan
Naguillan
Cauayan 6 No. 150,000 March - April
Palanan
San Isidro
PENRO Sub-office Roxas
PENRO Quirino
Nagtipunan
Diffun
PENRO N. Vizcaya 2 No. P50,000 March
Aritao 2 No. P50,000 March
Dupax 2 No. P50,000 March
PENRO Sub-office Bayombong
4. Procurement of initial 31 sets Regional Office 31 Sets P1,688,818.00 Procurement process on Regional Office based allotment. The initial
going fire fighting crews shall be distributed to all
of Fire Fighting Tools ( Fire CENROs.
Swatter, Fire shovel,
Collapsible Fire Pump,
Safety/fire helmet, working
gloves, Brush mask/safety
mask, fire fighting googles,
rake hoe, pick/shovel cobi
tool, axe/hoe, Scrape shovel)
5. Procurement of additional Fire Regional Office (note: subject 32 Motorized power sprays and grass cutters are
for request of additional Motorized the indispensable equipments in the
Fighting Tools and equipments ( allotment to FMB for the Power Spray units 640,000 firefighting operations and additional fire
Motorized Power Spray, Grass purchase of additional fire 32 grass fighting tools shall be distributed to
equipments) cutter units 480,000 organized Barangay fire brigades
Cutter, Fire Swatter, Fire Shovel 16 *
Collapsible fire pump etc.) collapsible
Fire pump units 584,000
32 Fire
Swatter units P88,000
32 Fire
Shovel units P59,200
32 Rake
Hoe units P94,400
32 Scrape
shovel
32 Axe/Hoe
units P86,368
units P83,040
6. Purchase and distribution of 200 To be filled-up with water and placed in fire
prone areas in strategic location
liters capacity drums Regional Office
Batanes
PENRO Cagayan
Sanchez Mira
Aparri
Alcala
Solana
PENRO Sub-Office Tugeugarao
PENRO Isabela
Cabagan
Naguillan
Cauayan 10 drums No. 10,000 February - April
Palanan
San Isidro
PENRO Sub-office Roxas
PENRO Quirino
Nagtipunan
Diffun
PENRO N. Vizcaya 10 drums No P10,000 February to April
Aritao 10 drums No P10,000
Dupax 10 drums No P10,000
PENRO Sub-office Bayombong
8.Establish/Maintain the fire lines/fire Regional Office Maintain the established fire lines and
Batanes fire breaks on NGP areas where funds for
breaks within NGP areas (2011- PENRO Cagayan M&P are no longer available.
2014) Sanchez Mira
Aparri
Alcala
Solana
PENRO Sub-Office Tugeugarao
PENRO Isabela
Cabagan
Naguillan
Cauayan 30 km 90,000 March-May
Palanan
San Isidro
PENRO Sub-office Roxas
PENRO Quirino
Nagtipunan
Diffun
PENRO N. Vizcaya
Aritao 30 Km. P30,000 March –May
Dupax 30 Km P30,000 March- May
PENRO Sub-office Bayombong 30 Km P30,000 March-May
2. Purchase of Binocular Regional Office 17 Units. 253,980.00 Procurement process CY 2016 continuing appropriations allotment
on-going
3. Hiring, Training and deployment Regional Office March-May The FPOs will be hired only for the duration
Batanes 7 No P178,500 of dry season. March - May
of Forest Protection Officers as PENRO Cagayan
Fire Fighting Sanchez Mira 7 P178,000
Aparri 7 P178,000
Alcala 7 P178,000
Solana 7 P178,000
PENRO Sub-Office Tugeugarao 7 P178,000
PENRO Isabela
Cabagan 7 P178,000
Naguillan 7 P178,000
Cauayan 7 P178,000
Palanan 7 P178,000
San Isidro 7 P178,000
PENRO Sub-office Roxas 7 P178,000
PENRO Quirino
Nagtipunan 7 P178,000
Diffun 7 P178,000
PENRO N. Vizcaya
Aritao 7 P178,000
Dupax 7 P178,000
PENRO Sub-office Bayombong 7 P178,000
1. Conduct training on fire safety. 21 Pax P30,000 Only men who have been properly trained in
fire fighting will be sent to fire scene.
TOTAL - - - -
Budgetary
TARGET
Requirements
ACTIVITIES REMARKS
Qty Unit of 2018 2019
Measure
A. FIRE PREVENTION
a.1. Radio Plugging and Guesting 16 No. 120,000 144,000
a.2 Attend Barangay Assembly 15 No. 54,000 64,800
Meetings
C. FIRE DETECTION
3 No.
c.1. Construction and Manning of
Look-out Tower
c.2. Deployment of hired Forest 21 No.
Protection Officers
c.3. Patrol Works
c.4. Maintenance of Forest Fire
Hotlines
D. FOREST FIRE SUPPRESSION
d.1. Prepare pre-suppression plan
d.2. Mobilize Initial attack
crews/team
d.3. Presentation of the pre-
suppression plan to the Initial Attack
Crews.
d.4.Deployment of Fire Fighting
Brigades/Crews
d.5.Mopping-up Operations