16'' Dia balance order to execute Jan'18 as on 05/01/2018

SAP MP Thickness Order DEST Remarks


Party
Grade (mm) Qnty(T) Qty(mtr) TPI
Tata project 312415 IS 9.52 802 8620 Nellore Adv tc
BGR Energy 298819 IS 9.5 505 5436 Vijaywada 9-12.4
Bhusan tubes IS 6.35 16 255
BSPCL IS 9.5 232
NTPC 320411 IS 9.5 465 5000 Unchhar
Malloo constrn IS 6 2000
MH coveyor 313327 IS 7.1+ 28 395
L&T tanda 309781 IS 7.1 88 1252 tanda
L&T Khargaon 313380 IS 6.35 65 1045 Khargaon
mbl IS 9.52 35 372 Nellore
mbl 315727 IS 6.35 6 102 Nellore
Lalit pipe 317827 IS 9.53+ 173 1860 ID bead removed
Melco IS 6.35 32 500
Krupya 317826 IS 6 30 465
Krupya 317825 IS 6.35 63 1000 >12 mtr as much as possible
Krupya 7.1 20
Krupya 8 20
Bhushan tubes 315839 IS 5.6 830 15000
BMS internationa 312167 IS 8 27 339
Bina IS 5.0+ 40
Bina IS 5.6+ 50
Bina IS 6.0+ 50
Bina IS 7.1+ 50
Bina IS 7.9 50
MPGCL IS 9.5+ 650 7000
Puja 6.35 28+ 450+400
Puja 5.6 19 350+500
Puja 5.2 26 500
Puja 9.5 14 145
MHC conveyor 9.5+ 28 300
MHC conveyor 7.9+ 23 300
MHC conveyor 5.6+ 28 500
MHC conveyor 5+ 25 500
BSL 292722 IS 6.4 36 566
TOTAL 4526