개발프로세스 이해
Running팀 / 서정황 차장
New Product
Creation Process
- Team Interaction
SP12 Air Max 2010 +
FA12 NIKE LUNARHYPERWORKOUT
Running
W’s
SU12 NK Free 4.0 V2 SU12 NIKE FREE ADVANTAGE
NSW T&F
ZM Rival D7
SU12 NIKE KUKINI
FREE
Product Testing
Innovation Engineering
Best practice
New technology
Development Technical support
Design, construction concept
Balancing design concept
High percentage in category adoption and manufacturability
Costing Material
Setting Target FOB Seasonal material pallet
Creating budget Category MPS
Cost options Material trend
COSTING
[Delivery] [Quality]
A successful project:
Meet Target FOB/Margin
Meet target Duty/considered score
Meet RFC schedule
No technical/manufacturing/fit issues
MAKETTING
BVTN
DESIGNER
DEVELOPER
Design
ITP to Asia
( Initial tech package)
•ITP included…
- Basic design
Marketing Developer - Last information
- BOM
- Forecast
- Target FOB
- Retail cost
TRIAD - component call-out
- Tooling construction
-- Market trend
-- Seasonal concept set up
-- Basic design creation
Development Process –New product
Project file
1. Revision Visual file
Cutting piece
2. Trial (CFM) Tooling part
BVTN Revision
GTM SM Trial /VC CDC MST
(Go To Market) Offshore Revision (Simultaneous trial )
(Model Size Trial)
Bonding
Pre-RFC Apply the revision
MEMO (BVTN) & feedback and BPFC Confirm (CE)
Proceed to make
the sample
PE- Pass report
* Pre-RFC MEMO is the
GENERAL
CONFIRMATION from
BVTN for MASS
PRODUCTION NLO (Asia) Dev.
RFC MEMO
(Begin RFC)
T/P to Offshore
= Pre-RFC MEMO is the GENERAL CONFIRMATION AND RFC MEMO by NLO ASIA DEV.
Is the FINAL CONFIRM after getting the BONDING TEST result.
Internal
CDC MST EXT FSR
(Model Size Trial) Offshore MST (ExtremeSize Trial) (Full Size Run)
(NOT OFFICIAL)
Shoes consist of Upper and Sole, pattern engineers take care of upper part for all
process except bottom part.
We need flattened pattern from 3D design on the last or 2D design on the paper to
make physical shoes, that’s the most important working of Pattern Engineering.
Pattern Engineers having played an important role in the all shoe making process.
And PE are serving law data to the related parts.
Pattern Creation Process
Initial Tech Package arrival
Production
Pattern Creation Process
Fuse, nosew 등
5. Assembly.
Pattern Engineer
Managing Ability
Engineering Process
(CE)
CE Job Description
Main
Check a Bond strength
Bonding Make the Bonding process for finished shoes
Others
1) Project test for chemical and Material approval
2) Option test for Cost & time reduction
Risk management
• Risk management for Color and Bonding on the progress
Inform potential risks for color combination
Induce to change the material
Research a method to prevent the risk
Arrived tooling design is reviewed and modified for better direction. Scanning upper is necessary to get a top
line and fit upper to sole. Generally it takes 5 days from scanning to final 3D.
EDM
The resultant shape of CNC work is used for CASTING or EDM. After CASTING/EDM work, MOLD parts are
assembled together. And finally MOLD fabrication is completed by applying texture.
Lead time, Cost & etc
*5523&Costing 부서
-5523부서에서는 채산 프로그램을 사용하여 제품의 면적을 산출하여 관세와 관련된
업무를 하고 있습니다. 자재의 Majority를 기준으로 각 나라별 세금이 다르기 때문에
5523에서 자재의 면적을 정확하게 산출해내어 NIKE에 정보를 제공하는 중요한 업무를
맡고 있습니다.
Production
1. Tech package receiving
* BVTN send Tech package before Roll-Out meeting
- Drawing : Upper & Bottom.
- Project Plan : concept, size run, materials…
- Marketing brief : forecast, target market, customer information,…
2. Discussion on Upper related tool & process,…
2-1. Upper related tooling
Pattern type
A. Strobel type
process
B. Toe lasting type A. Stitching Process
C. True center seam B. Assembly Process Design concept
D. Board lasting type C. Cutting process
Fuse, nosew 등
6. Assembly.
A. What is last draft? Flat representation of top surface area of given last.
B. Methods ? Taping , Vacuum forming method, Digital scanning
C. Last draft making Process with taping method
Taping on Last Removing tape from last and flattening onto pattern card
Stick
Length
7. Tooling Engineering
TE / 서성희 차장
Tooling Developer Manual
• NIKE PROCESS
ITP
(Initial Tech Package) CAF BVTN T/P SM
CAM (Category Assortment Pre-RFC
1. Target FOB Offshore
(Ready For (Simultaneous Trial)
2. Forecast (Category Alignment Finalization) T/P
Meeting) Commercialization)
3. Retail cost 해외공장과 동시에
4. BOM
1. PHYSICAL UPPER
GTM 생산 전 단계로 시화를 하여 VC후
3. METERIAL 모든 이슈와 24시간 안에Feedback을
4. TECHNICAL SAMPLE 제작 (Go To Market)
문제점들을 받아야 함
2. RP/SOMOS 제작 1. Revision 해결해야 됨
Pattern – 디자인 2. Trial (Cfm)
Tooling – Bottom 디자인 3. Mold (Cfm)
LAST정보, 4. Sample
자재정보 접수
Pre-RFC MEMO
(BVTN)
WEAR TEST
Pre-RFC 메모는
생산을 위한
BVTN의 승인확인
Upper 제작
CAF
(Category Assortment
Upper scan & Footbed 제작
Finalization)
2D Drawing
GTM
3D Modeling (Go To Market)
현장작업 및 제품점검
NC data 가공 Done
Tooling Developer Manual
2D Drawing
가도면
ITP or Revision
완성된 도면
Tooling Developer Manual
OS
3D Modeling
각 파트별 모델링
Cushlon IU
완성된 모델링
Tooling Developer Manual
RP를 참고하여
Revision 사항이 빠짐없이
적용되었는지 점검
Somos or RP제작
RFC단계에서는
Rev code를 Z로 변경하고
U3d 파일은 remove하고
Igs 파일을 추가하여 포스팅 한다
Tooling Developer Manual
Mold design
Mold modeling
가공 데이터 산출
NC가공 (목형/전극/Core/Base)
가공물 점검 (목형/전극)
주물 or 방전
보다 자세한 사항은
첨부된 Manual 참조
조립
제품 작업
초품 작업 후 제품외관
제품 확인 (형상, 두께, 피팅등) 피팅 상태에 따라
Mold Making
추가 수리 진행
Mold 수리
부식 & 도금
공장입고 & 최종 제품 확인
Tooling Developer Manual
• 몰드 제작 기간중 각종 치공구 제작
- Outsole : 생지 발형 / 톰슨 발형
- IU : 숙성지그 / 3D 점검지그 / 스크라이버 자 / 스프레이 지그
- 패드 : 압착 라스트 / 준비 패드 / 게이지 패드 / 사방 패드
- Other : 패드 프린팅, 에어백 마킹, 에어백 점검…..
< 톰슨 발형>
< 3D 점검지그>
< 압착 패드>
• 파트 CFM 점검 준비물
- 각 라운드 최종 2D (*.pdf)
Part CFM - 각 파트별 1족
- Stockfit 완제창 1족
- Section 점검용 (완제창 Section 맞춰 컷팅)
- 각 파트별 게이지
- 자, 버니어 캘리퍼스, 순간 접착제, 가위, 칼등
Tooling Developer Manual
< Example_1>
현장작업 및 제품점검
< Example_2>
Upper 제작
2D Drawing
Mold Making
EST (Extreme Size Trial)
Part CFM
FSR (Full Size Run)
현장작업 및 제품점검
C.J KIM
Organization
Team Leader
KM Park
Sample
Running Outsole
Validation
NSW Spray
T&F DCS
Role & Responsibility
3. QA management
1
1. Rubber classification
1. Rubber classification
1
4 Part per Hundred of Resin
Base rubbers
Pre Dispersed
Poly Binder
Powder &
Liquid
chemicals
4. Formulation table
5. Vulcanization mechanism
Sulfur vulcanization
Peroxide vulcanization
At the beginning of the vulcanization process, the organic peroxide splits into 2
radicals. RO:OR → 2RO•
Lower reaction rate and the resulting vulcanizates have a lower tensile strength,
scorching tendency and unpleasant smell.
7. Outsole mixing & process
The banbury batch should drop directly onto a mill. The dump
temp. should be checked and randomly recorded.
7. Outsole mixing & process
Vulcanizing
region
Processing
MHR MHP MHM
safety region
ts2
ML
Time (min)
ML: Minimum Torque, MH: Maximum Torque, TC90: Time to 90% of maximum torque
7. Outsole mixing & process
There must be clearly posted standard for each compound for scorch time (T2 / T10) and
cure time (T90 ) for Sulfur cure rubber.
The range for T90 is no more than +/- 10%. All compounds (Sulfur and Peroxide cured) must
have a posted standard cure curve by MCS#.
7. Outsole mixing & process
60~65C X 45~50sec
pH: 6.5~7.5
2
1. Midsole classification
1. Midsole classification
Midsole
EVA PU
Conventional Phylon
PU Midsole
CMP Phylon
SHOX
Die Cut EVA Midsole
Airbag encapsulated
Injection Phylon
Soft PU
Injection Unitsole
1. Midsole classification
EVA
- Thermoplastics
- Flexible / Elastomeric
- Good process-ability
- Weathering resistance
- Non-toxic
- Expansion foam
- Hotmelt adhesives
2. What is EVA & PU?
PU
3. Physical Properties
Base
발포제 가교제
Polymer
Mixing
가교제 및
가열/가압 발포제의 분해
Expansion
Stabilization
4. Expansion mechanism _ CP/CMP/IP/Sockliners
CP/CMP/Sockliners
GO!
A minimum of 2hrs from calendar sheet out to use is maintained for all
batches. Maximum of 10days age from calendar to pressing. Preferred
4days.
Remove Skin.
Slope Skiving
GO!
check Check
UV Process
Injection Phylon
A & B Material
Material Storage QC Check Production Trial
Mixing
Separate the raw Physical test for each Mix a minimum of 30 Physical test for blended
material by material and material lot is to be done minutes. material lot is to be done
colors. with test slab. Blended material must with test slab. (5kg)
E/R(%), S/G, H/D(2hrs, not be over 100kg per E/R(%), S/G, H/D(2hrs,
First In, First Out 24hrs) drum. 24hrs)
Primary materials (A/B)
should be blended
within 10 days after QA
check ER.
Injection Phylon
Temperature : 45~50℃ Clean the mold with air Spray mold release
CONDITIO
Humidity : Max. 30% spray gun. agent and blow out with TYPE
N
air spray.
STANDAR 170±4℃
2 times Green200 : Water = 1:30 D IP X
380±20se
c
Injection 170±4℃
Unitsole X
400±20se
c
Injection Phylon
Take out products as Trim the gate scrap Stamp MCS # and Put the products on the
soon as it is de-molded. clearly. production date. stabilization jig.
Check the defectives.
Injection Phylon
Stabilization
Remove Jig Washing Scribeline Check
tunnel
Temp : 1st – 60±5 c° Remove the jig after Water temperature : Nike standard
2nd – 50 ±5 c° passed through the IP 45~50℃ Over 150mm: +/-2mm
3rd – 40 ±5 c° tunnel. Under 150mm: +/-1mm
IU 50~55℃
4th – 30 ±5 c°
Washing time :
Passing time : Minimum 10 min.
45 ±5 min
Drying time:
Minimum 10 min.
PolyUrethane
GO!
1. Automated mold closing - allows faster systems so 1. Manual mold closing - needs slower systems and longer
gives higher productivity per mold cycle times
2. Base and top plate of mold are heated directly, one 2. Molds easily changed - greater production flexibility
controller for two molds - mold temperature is more 3. Molds heated indirectly and not continuously through the
consistent. cycle
3. Mold angle set mechanically – consistent automated 4. Pour pattern manually controlled - more chance for
pouring path - consistent precisely defined shot size and variation
pour pattern limited number of shot sizes available
PolyUrethane
Raw material
Material thawing Material mixing Cup test
control
Polyol and ISO stocks Inventory in the thawing Polyol is mixed with a A cup test is performed
must be controlled for and holding ovens must fixed head mixer. Mixing at least every 3 hours to
FIFO. An inventory list be controlled in a FIFO time is automatically verify reaction profile.
by lot number is system. Materials are controlled. Mixer speed The pouring time and
available for all PU processed through the is adjustable so that date should be recorded
materials in the thawing and holding mixing is efficient on the top or side of the
warehouse ovens within 24 hours. without entraining air cup. Cream time, tack
into the polyol. free time, pinch time,
rise time should be
Each pouring head in
checked. This data
use must be checked at
should be recorded in a
least twice per shift for
daily production log.
mix ratio. Using pours of
1x3sec and 3x1sec.
PolyUrethane
A clearly visible PFC Mold temperatures The minimum quantity of Workers handling
should be posted close should be checked mold release must be airbags should use
to each pouring head. before production starts applied by fine mist clean cotton gloves.
The PFC should and again at least once spray. There should be
contain: per shift. Results are no dripping or puddles of The PFC should contain:
MCS # logged. Production must MRA in the molds.
Mold angle not start until molds are MCS #
Dry, oil free compressed Mold angle
Pouring path including stable at target
air or heated air used to
mix head movement temperature Pouring path including
dry MRA. Mold release
speed mix head movement
agent must be
speed
completely dry before
pouring PU material into
the mold.
PolyUrethane
De-molded parts should Remove remained MRA No sharp, metal or Spray or painting to
be checked for by cotton brush wheel heated tools used to prevent yellowing and
excessive flashing within 1 hours and dried. clean blow-by from hydrolysis.
and/or airbag blow by airbag windows.
that would indicate a
need to repair molds.
5. Pros & Cons
3
1. NIKE Essential tests by materials
1. NIKE Essential tests by materials
2. Finished Shoe test
N Specimens / Used
Test Method Purpose
o materials
G35. WASHABILITY, SOIL Fabric, coated materials, 차가운 물에서의 자재와 신발의 “FEEL” 또는
2
RELEASE leathers & finished shoes “LOOK”의 변화를 측정.
G84. ELEVATED TEMP. Finished shoes, shoe 고온의 환경에 처할 경우에 신발에 일어날 수 있
6
TEST-FINISHED SHOES components 는 변화
Thank You!
Q&A