You are on page 1of 2

KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD. FORM NO.

HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL REV.


Rev. No.:________
Project / Location: Name of Job: Prepared By: Reviewed By:
R4 / BBR111, Bandar Bukit Raja 2, 15. Plastering / Skim Coat
Klang, Selangor. Date: Date:

15. Plastering / Skim Coat


HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

Mechanical (4) To control lorries speeding at site. (max.15km/h)


-Minor injury
Struck by moving part of 2 3 6 (5) Workers stay away from moving vehicle / lorry.
-Damage to property (6) To provide appropriate PPE.
Delivery of Material vehicle / lorry. Project Manager
1 Loading and (5) Crane must operate by competent operator.
Physical - Workers stay away from lifting area. Site Manager
unloading material
Struck / hit by moving part of -Minor injury 2 3 6 - Designated person to supervise hoisting and lifting Site Agent
material during lifting activity operation.
(6) To provide appropriate PPE. Site Engineer
Site Supervisor
Physical (5) Crane must operate by competent operator.
-Serious injury - Crane inspection before work commences. SHO / SSS
Falling object. (during 2 4 8
-Damage to property - Workers stay away from lifting area. EO
lifting of material) (6) To provide appropriate PPE.
Stacking / Storing Scaffolder
2
material at site (5) Supervised by designated person during stacking of Work Leader
Physical
material.
Slip / fall / collapse of material -Serious injury Machinery opr/
2 4 8 - Routine checking to ensure stability of material.
due to poor material -Damage to property - To ensure material not obstructing any access way. Driver
arrangement. (6) To provide appropriate PPE.
Signalman
Physical (Ergonomic) (5) Manual handling / lifting should be carry out with Banksman
correct method.
Improper method of handling -Negligible injury 2 3 6 - Scaffolding erecting by experience workers. Rigger
Erection of working activity. (6) To provide appropriate PPE.
3 Welder
platform
(4) Proper working platform for workers. Workers
Physical
-Serious injury 2 4 8 (5) Scaffolding erecting by experience workers.
Workers slip and fall. (6) To provide appropriate PPE.

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)
KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD.
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL

Plastering / Skim Coat (Cont’d)


HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

-Serious injury
Mixing the cement Chemical (long term can impair
4 2 4 8 (6) To provide appropriate PPE.
mortar Contact with wet cement worker skin dermatitis)
-Skin burn

Physical (5) Working area free from obstruction by any material. Project Manager
-Minor injury 2 3 6
Workers slip and fall (6) To provide appropriate PPE. Site Manager
Site Agent
5 Plastering work
Site Engineer
Physical
(4) To ensure working platform are properly erected. Site Supervisor
Workers slip and fall -Serious injury 2 4 8 (6) To provide appropriate PPE.
(using working platform) SHO / SSS
EO
-Serious injury Scaffolder
Skim coating Add
Chemical (long term can impair
6 plaster mortar with 2 4 8 (6) To provide appropriate PPE. Work Leader
Contact with wet cement worker skin dermatitis)
water
-Skin burn Machinery opr/
Driver
(4) To ensure power tool in good condition before used.
Physical Signalman
-Serious injury 2 4 8 - Electrical wire shall hang-up or not obstruct walkway.
Electrical shock (6) To provide appropriate PPE. Banksman
Rigger
-Serious injury Welder
Chemical (long term can impair
7 Using electrical mixer 2 4 8 (6) To provide appropriate PPE. Workers
Contact with wet cement worker skin dermatitis)
-Skin burn

(5) Training, Briefing.


Lightning exposure -Serious injury / Fatality 2 5 10 (5) Stop work during thunderstorm.

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)

You might also like