(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)
KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD.
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
-Serious injury
Mixing the cement Chemical (long term can impair
4 2 4 8 (6) To provide appropriate PPE.
mortar Contact with wet cement worker skin dermatitis)
-Skin burn
Physical (5) Working area free from obstruction by any material. Project Manager
-Minor injury 2 3 6
Workers slip and fall (6) To provide appropriate PPE. Site Manager
Site Agent
5 Plastering work
Site Engineer
Physical
(4) To ensure working platform are properly erected. Site Supervisor
Workers slip and fall -Serious injury 2 4 8 (6) To provide appropriate PPE.
(using working platform) SHO / SSS
EO
-Serious injury Scaffolder
Skim coating Add
Chemical (long term can impair
6 plaster mortar with 2 4 8 (6) To provide appropriate PPE. Work Leader
Contact with wet cement worker skin dermatitis)
water
-Skin burn Machinery opr/
Driver
(4) To ensure power tool in good condition before used.
Physical Signalman
-Serious injury 2 4 8 - Electrical wire shall hang-up or not obstruct walkway.
Electrical shock (6) To provide appropriate PPE. Banksman
Rigger
-Serious injury Welder
Chemical (long term can impair
7 Using electrical mixer 2 4 8 (6) To provide appropriate PPE. Workers
Contact with wet cement worker skin dermatitis)
-Skin burn
Legend: