CONSTRUCTION AND PROJECT MANAGEMENT AND QC/QA SERVICES
DATA BOX
DATE: 2017
CLIENT: AZVI
DETAILED TASKS: Pontem Engineers working for the Contractor to supervise all the technical
tasks related to the launching maneuvers of the steel bridge arches.
DATA BOX
DATE: 2017-ongoing
CLIENT: FCC-AZVI JV
DETAILED TASKS: Pontem Engineers working for the QA to supervise all the technical tasks
related to special structural elements, inspections on subcontrators facilities
and reporting to the steering comitee work progress on site.
DATA BOX
DATE: 2016-ongoing
TYPOLOGY: Design and Build Project to develop brand New Terminals for the LaGuardia
Airport. Total Budget: $4 Billion
DETAILED TASKS: PONTEM is providing QA Engineers and experts on site to be part of the
QA Team built up by CALTROP for the Contractor of the works.
DATA BOX
DATE: 2016-ongoing
DATA BOX
DATE: 2013-ongoing
SCOPE OF WORK: Technical consultancy for the execution of singular structural elements (stays,
bearings, dumpers, steel structures). Quality Assurance Services.
TYPOLOGY: Cable-Stayed Bridge. 152 m + 305 m + 152 m (500’ + 1000’ + 500’): Budget:
$1.5 B
DETAILED TASKS: Pontem Engineers working for the QA METS Team to supervise all the
technical tasks related to special structural elements.
DATA BOX
DATE: 2013-ongoing
TYPOLOGY: World record concrete arch bridge with box-section post-tensioned concrete
deck
DATA BOX
DATE: 2004-2007
CLIENT: DRAGADOS-SACYR-GEA-21
MAIN TASKS: Pontem Engineers were Engineers of the Record for several structures,
carrying out also de Construction Mangement of them.
STRUCTURAL
ENGINEERING DESIGN
WORLD CLASS ENGINEERED ART®
STRUCTURAL ENGINEERING DESIGN
DATA BOX
DATE: 2018
CLIENT: INECO
MAIN SPANS: 78 m
OWNER: SPANISH MINISTRY OF PUBLIC WORKS
WORLD CLASS ENGINEERED ART®
STRUCTURAL ENGINEERING DESIGN
DATA BOX
DATE: 2018
CLIENT: INECO
MAIN SPANS: 30 m + 30 m + 30 m + 30 m + 30 m
OWNER: SPANISH MINISTRY OF PUBLIC WORKS
WORLD CLASS ENGINEERED ART®
STRUCTURAL ENGINEERING DESIGN
DATA BOX
DATE: 2018
CLIENT: INECO
MAIN SPANS: 35 m + 35 m
OWNER: SPANISH MINISTRY OF PUBLIC WORKS
WORLD CLASS ENGINEERED ART®
STRUCTURAL ENGINEERING DESIGN
DATA BOX
DATE: 2018
CLIENT: INECO
MAIN SPANS: 9 m + 12 m + 9 m
OWNER: SPANISH MINISTRY OF PUBLIC WORKS
WORLD CLASS ENGINEERED ART®
STRUCTURAL ENGINEERING DESIGN
DATA BOX
DATE: 2018
CLIENT: INECO
MAIN SPANS: 20 different overpasses with variable configuration of the following main
span lengths: 13 m/ 18 m/ 22 m/ 27 m/ 30 m/ 33 m
OWNER: SPANISH MINISTRY OF PUBLIC WORKS
WORLD CLASS ENGINEERED ART®
STRUCTURAL ENGINEERING DESIGN
DATA BOX
DATE: 2017
CLIENT: INECO
DATA BOX
DATE: 2017
CLIENT: INECO
DATA BOX
DATE: 2017
CLIENT: INECO
DATA BOX
DATE: 2017
CLIENT: INECO
SE-40 MOTORWAY
(Sevilla - SPAIN)
DATA BOX
DATE: 2015-ongoing
DATA BOX
DATE: 2016-ongoing
DATA BOX
DATE: 2007-2013
DATA BOX
DATE: 2007-2012
DATA BOX
DATE: 2008
DATA BOX
DATE: 2007-2010
CLIENT: DRAGADOS
DATA BOX
DATE: 2004-2006
DATA BOX
DATE: 2006
DATA BOX
DATE: 2005-2006
ESPEJO’S FOOTBRIDGE
(Córdoba - SPAIN)
DATA BOX
DATE: 2009
DESIGN OF
MANEUVERS AND
AUXILIARY ELEMENTS
WORLD CLASS ENGINEERED ART®
DESIGN OF MANEUVERS AND AUXILIARY ELEMENTS
DATA BOX
DATE: 2017-ongoing
SCOPE OF WORK: Temporary Works and Auxiliary Elements Design. Demolition Structural
Analysis.
DETAILED TASKS: PONTEM Engineers are designing cofferdams, trestles facilities and carrying
out the structural verification of several alternatives for the demolition
Works, during tender phase.
DATA BOX
DATE: 2017-ongoing
CLIENT: Signature for the Saint Lawrence Corridor (SSLC JV) Dragados-Flatiron-
SNC-HIGH-SPEED RAILWAYalin JV.
SCOPE OF WORK: Temporary Works and Auxiliary Elements Design. Maneuvers and Lashing
Engineering.
TYPOLOGY: Cable Stayed Bridge. Project Total Budget: $2.25 Billion (P3)
DETAILED TASKS: PONTEM Engineers are designing the elements and maneuvers. Supervision
on site of the loadouts. Assistance during fabrication of Temporary Works.
DATA BOX
DATE: 2016
TYPOLOGY: World record concrete arch bridge with box-section post-tensioned concrete
deck
DATA BOX
DATE: 2015-ongoing
DATA BOX
DATE: 2014
CLIENT: FORTH CROSSING BRIDGE CONSTRUCTORS (Joint Venture)
DATA BOX
DATE: 2014-2016
CLIENT: DRAGADOS
SCOPE OF WORK: Design of auxiliary elements and maneuvers/ Technical consultancy
TYPOLOGY: Composite deck with variable deck
MAIN SPANS: 65 m + 100 m + 75 m + 45 m
(213’ + 328’ + 246’ + 148’)
OWNER: SPANISH MINISTRY OF PUBLIC WORKS
WORLD CLASS ENGINEERED ART®
DESIGN OF MANEUVERS AND AUXILIARY ELEMENTS
DATA BOX
DATE: 2014
DATA BOX
DATE: 2013
DATA BOX
DATE: 2012
TYPOLOGY: 15 mm-thick steel sheet pile cofferdams with inner reinforcement trusses for
the execution of subsea foundations
DATA BOX
DATE: 2012
OFFSHORE
WORLD CLASS ENGINEERED ART®
OFFSHORE
DATA BOX
DATE: 2014
DATA BOX
DATE: 2012
TYPOLOGY: 6 cylindrical tanks with valves and fastening elements for launch maneuvers of
the Eldfisk jacket
DATA BOX
DATE: 2011
OWNER: ENCANA
WORLD CLASS ENGINEERED ART®
PUBLICATIONS,
ARTICLES AND OTHER
WORKS
WORLD CLASS ENGINEERED ART®
PUBLICATIONS, ARTICLES AND OTHER WORKS
DATE: 2005
TITLE: Tema 10: Aplicaciones del Método de Bielas y Tirantes en el Cálculo de
Puentes de Hormigón.
ISBN: 978-3-85748-122-2
ISSN: 1359-7493
Email: info@pontem.es