You are on page 1of 2

PROJECT:

BDG : SHEAR STUD


MRd for
2
Min (Ncf, Position to 1stud/t partial
No Floor Beam name / size L Loc Beff hc fcd Aa fyd Nc,f Npl,a Spacing stud/tr Spacing Mpl,Rd MEd Mpl,a
Npla) the decking rough composite
ough
(0.5)
(Nos/0. (Nos/0.
mm mm mm MPa mm² MPa kN kN kN mm mm (kNm) (kNm) (kNm) (kNm)
5 span) 5 span)
1 2 CB/SB1 UB-406x140x46 W380.8X6.8F142.2X11.2 6,100 Edge 763 90 23.33 6,640 345 1,361.06 2,290.8 1,361.06 Transverse 19.20 158.86 11.66 261.65 550.75 212.71 268.41
2 2 CB/SB1 UB-406x140x46 W380.8X6.8F142.2X11.2 6,100 Mid 1,525 90 23.33 6,640 345 2,722.13 2,290.8 2,290.80 Transverse 32.31 94.38 19.62 155.46 644.35 212.71 268.41 456.38
3 Roof CB/SB1 UB-406x140x46 W380.8X6.8F142.2X11.2 7,900 Edge 988 90 23.33 6,640 345 1,762.69 2,290.8 1,762.69 Transverse 24.87 158.86 15.10 261.65 483.49 230.47 268.41
4 2 CB/SB4 UB-406x140x46 W380.8X6.8F142.2X11.2 6,200 Mid 1,550 90 23.33 6,640 345 2,766.75 2,290.8 2,290.80 Transverse 32.31 95.93 19.62 158.00 644.35 342.54 268.41 456.38
MEd/
Ia w Defl (steel) P Defl 7.43 59.42
Mpl,R
d

cm4 kN/m (mm) kN (mm) cw tw cf tf Flange Web

15,685.00 32.32 18.12 98.56 14.49 32.61 187.04 380.8 6.8 67.7 11.2 6.04 56.00
0.47 15,685.00 32.32 18.12 336.67 380.8 6.8 67.7 11.2 6.04 56.00
15,685.00 32.32 50.97 154.99 380.8 6.8 67.7 11.2 6.04 56.00
0.75 15,685.00 46.91 28.07 220.87 380.8 6.8 67.7 11.2 6.04 56.00