REVISED " PAVEMENT REHABILITATION WORKS (SCRAP AND FILL OVERLAY) SELECTED LOCATION AT CIPALI TOLL ROAD " LANE A&B
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT
(RP) (RP)
1.00 GENERAL CONDITIONS &
PRELIMINARIES 1.10 1.11 Contractual Requirements LS/ One 2.00 00.000.000 110.000.000 First mobilisation and demobilisation of all Team construction plant, machinaries, manpower and equipment necessary to complete the 1.12 whole Works. LS/ One 7.00 0.000.000 30.000.000 Mobilisation and demobilisation from one Team location to other location exceeding 000m of all machinaries, manpower and equipment necessary to complete the whole Works. 1.20 1.21 Specifed Requirements (Upon Request) LS 1.00 700.000 700.000 Preparation of Progress Report and 1.22 photographs LS 1.00 700.000 700.000 To prepare Shop Drawings and Construction 1.23 Drawings during Construction Period LS 1.00 700.000 700.000 To prepare As Build Drawings after Construction Period 1.30 Traffic Safety and Control (Traffic 1.31 Management Service) Month 1.00 00.620.000 83.430.000 Traffic safety and control as specifed in specifcations, drawings and standards, using Rubber cone. ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT (RP) (RP)
2.0 PAVEMENT WORKS
2.10 Planning and cut down of existing
bituminous pavements using Cold Miling Machine 2.11 To milling, planning and cut down of Cu.m 2,639.00 000.000 1.319.000.000 existing bituminious pavement using Cold Milling Machine to 00 mm thickness including dispose from location of works to disposal area inside Cikopo-Palimanan Toll Road, including removal of ''key-in'' joints. 2.12 Rock Excavation including dispose from Cu.m Rate Only 400.000 400.000 location of works to approved dumping area Amount to be return to EP-NRC JO 2.13 Disposal of Scrap Material to dumping area Cu.m 2,639.00 42.807 -113.100.000
2.20 Bituminous Prime Coat and Tack Coat
Supply and lay Bituminous Prime Coat Sq.m 9,900.00 16.000 2.21 108.480.000 (Grade MC-70 or RC-200) Supply and lay Bituminous Tack Coat (Grade Sq.m 22,030.00 10.000 2.22 220.300.000 RC-200)
2.30 Asphalt Treated Base Course
Supply, lay and compact Asphalt Treated Cu.m 1,486.00 2.100.000 2.31 3.194.900.000 Base Course (Include Asphalt Cement)