You are on page 1of 2
Request for Drawings Approval Project Tite : | KATARA PROJECT | lent / Owner 2) KATARA Contract Title/No. | KP/B216/12 | PM Consultant _ PROUACS Prepared By [at CM Consultant | Date Li) 2May7 Contractor ‘Submittal Ref: KP-B215-ASD-01271-AR.02.06.17-Sht 01 of OL-REV.AT | Date: 2May-17 | Discipinoe: ee z ‘BaAchitecurs | Chchivstucral | 1 Eeccal || DMecarca inrestuctre | Dlauso video Dinter & NSIDR.204 SHT 01 OF 01 REV-AD 2) Issued For Construction Drawings p) ElaWorkhg Drewes 1 4) Shop Drawings | ea _ Contractor's Stamp And Signature: Previous Submittal Revision Status (f applicable): Z TD Approves 1B Approved As Noted [AC Revise & Re-Submit CO D-Rejected ° | Gurnt Submittal Situs: cee | A-Approved (C1 B-Approved As Noted (1 CRevise & Re-submit 1 D-Rejected NoTeD ‘ 2 oe an Reviewer: | Reviewer: ~$- Reviewer: 30-0 -177 if ce | CMC Project Manager: | CG Project Manager: | CMC Project Manager: Note: For Code - C= Contractor shall r-submit within 1 week (incorporting all the comments one tine (Rev.01),othervse will be considered as Rejected Pros inemanal PCS Soars PRDawgs- Requestor Drawings APO Reson 03 $16.700 FFL 2084 (P.0) THIRD FLOOR DOOR ELEVATION SOME 125 2114 (8.0) f ‘ANCHOR STORE. ap 21860. TTT 316m 9. Senmae7Senn 16, SS FIRING SCREW (WITH RANL PLUG @ 300mm o/c [HINGE cPor4 ea 20 | ie —cLAZING BED Bae t [ INTERIOR GASKET JFO12 | EXTERIOR GASKET 2920 — SHUTTER POO ‘SECTION KEY PLAN (Third Floor) SCALE 125 | SOME 1280 ON wT TE ___*D Ar FRAMED | GLASS: = THIRD FLOOR GL-02 QUANTITY: 03 = D3-03 Location: F _____ [FACADE “SYSTEM | Pe ee rs ae eT TT a lace eee a l Tr daelsger lia stone cisa0mo Nees % : I a ea eee fay of 24mm THK OOUBLE GLASS | eon caster sare ‘urn BO e260 r wT OOWELE GSS ENTER GASKET 2920 BOTTOM SHUTIER HPOOS ee ns J) =| Ul = Ser Wr etonth nob 3 UW 13-03)_DOOR SIDE FIXING DETAIL | | Corer | | | “STONE CLADDING | ¢ LU +16.700 FFL msn ASHE 1358 Ta 7 eSsanees a | eee By CLAZING BEAD 6889——— 1 anove KPo0a — 3 fa z z INTERIOR cAsKET wrOI2— | aie eae | GLAZING BEAD 8869 4 aaa [re |-—TEROR GASKET urove o 3 oe " * o epee poe poe ee ata ee | 2am THK, DOUBLE GlAss——J || EXTERIOR GASKET 2920 ~ s} ‘SHUTTER HeOO3 —————! 1} 24mm THK, DOUBLE GLASS EXTERIOR GASKET 2920 ES DOOR BOTTOM DETAIL | Semtx75imi Us. $$ FRING WITH RAWR. PLUG @ 300mm o/c" CLAZING BEAD e869 TEROR GASKET JFO12— re pata ——g SoREW. a | TOP FRAME HPO} (oursibe | Top SHUTTER HPOO4 ——exteror cascer 2920 | + i rw THK DU a DOOR TOP FIXING DETAIL anchor “STORE $1740 pw [ACRYLIC WEATHER SILICONE SEALANT WITH BACKER ROD George Wilson Resident Engineer PM-CM Services KEOW CATCH (STRIKER PLATE) TOP CATCH ESCUTCHEON HINGE IN_RABBANDET NUT F WEATHERING PLUG FOR FPO17 BOTTOM CATCH x : KEY NOT TO St 6 NOTES 1. ALL DIMENSIONS, ARE IN. MILUMETER. ALUMINIUM LEGEND: STANDARD POLYESTER POWDER COATED (PE-F) THERMAL BREAK PROFILES FROM M/s, TECHNAL FRANCE, INAL] COLOUR TO BE DECIDED BY THE CONSULTANT. Ae. STANDARD POLYESTER POWDER CO4ATED (PEF) NON € THERMAL BREAK PROFILES FROM M/s. GULF EXTRUSIONS Fe” ER LCUMER 0008S NDS COLOUR TO BE. DECIDED BY THE. CONSULTANT, GLASS LEGEND ]24 THK. DOUBLE GLASS CONSISTING OF 6mm THICK GL-1) CLEAR TEMPERED GLASS + 12mm AIR SPACE + 6mm CLEAR TEMPERED GLASS FOR DOORS & WINDOWS [cial tame Tack Clear TEMPERED Glass FoR FRAWELESS Hoe ER, REFERENCE DRAWINGS: TLE TEDULE |& DETA ALUMINIUM WINDOW. CONTRACTOR'S REVIEW & COORDINATION DISCIPLINE CHECKED/COORDINATED CTURAL DATE TURE ventcrnanerosceune| | wenove geen —OTHERS SUBMITTAL/T ni REY. HKD] aPPD.] APBD, AY | ISSUED FOR APPROVAL [22-04-17] JC = AQ | ISSUED FOR APPROVAL 09.17.16] Jc | vo | - | - PM/CM CONSULTANT'S IEW STATUS |A-APPROVED B-APPROVED AS, NOTED C-REVISE & RESUBMIT D-REJECTED CLIENT: bye Katara PMICM CONSULTANT : PROJECT MANAGEMENT TEAM P.0.B00:7286 e DOHASTATE OF ONTAR Tel : (+ 974) 4470902 Fox: (+ 974) 4420857 PROJECT SUPERVISION DESIGN CONSULTANT : 0,4 ubraill 65 SLs it ‘QATAR DESIGN CONSORTIUM MAIN CONTRACTOR : Tce Ena aheenoetetnetan wanes poh SMLAI Lg gS Imperial Wading & Contracting Co. wt ‘ALUMINIUM CONTRACTOR : ‘SPECIALIZED ALUMINIOM 8 STEEL CO. W.LL & 2 LEAVES PLUG PROJECT: e eNRC SEN aaa oCEE ees CONSTRUCTION, COMPLETION AND MAINTENANCE OF 10. EEO28 PIN #5 COMMERCIAL PLAZA, CHILDREN’S MALL AND STONE 1 FEO36 PIN CORNER CLEAT ee CLADDING AT KATARA PROJECT (KP/B215/12) 72, | KP00S DOOR HANDLE AS BUILT DRAWING 3, SELF DRILLING SCR 14. tT y LA DRAWING TITLE : 17, 4 20 CHRO = SCHEDULE, DETAILS & KEYPLAN OF DOORS (D3-03) «30 = J 15. 30x30 SOROME, CYLINDER (N2& N3-BUILDING) ue : neh eee THIS 1S A CAD DRAWING AND MUST NOT BE ALTERED MANUALLY i 1 a ee | [Scalas shown | Okc. pwG Size At Rev, AT 18. [S/im_ | SELF DRILLING SCREW SR2 4.2x22 | DG NUMBER SAS/6545/13/ASD/N2&N3/DR-204 sht.01 OF 01

You might also like