You are on page 1of 37

Project Name: Rawdat Al Khail Building (3B+G+8F+PH)

Client : Assets Real Estate Development Co


Consultant: Universal Design Center
Main Contractor: Urbacon Trading & Contracting Co.
Main Sub Contractor: Golden Bay Contracting & Trading

Snag Observation Report Apartment No : 72


Action Completion Number of
Sr.No Report Date Location Description of Defect/Snag Photos Before Photos After Action Date
Taken
Status
Date Days Open Signature

Main Door 1. Provide protection of all finished


1 05/25/21 Entry Living works to avoid any damages.
Area

Main Door 1. Provide protection of all finished


2 05/25/21 Entry Living works to avoid any damages.
Area

Page 1
Project Name: Rawdat Al Khail Building (3B+G+8F+PH)
Client : Assets Real Estate Development Co
Consultant: Universal Design Center
Main Contractor: Urbacon Trading & Contracting Co.
Main Sub Contractor: Golden Bay Contracting & Trading

Snag Observation Report Apartment No : 72


Action Completion Number of
Sr.No Report Date Location Description of Defect/Snag Photos Before Photos After Action Date Taken Status Date Days Open Signature

1. Untagged Breaker Board without


Main Door the designated room location of
3 05/25/21 Entry Living each breaker and incomplete
Area breaker cover caps

Main Door 1. No Breaker Room Location


4 05/25/21 Entry Living Diagram ro indicated the
Area location of each breaker

Page 2
Project Name: Rawdat Al Khail Building (3B+G+8F+PH)
Client : Assets Real Estate Development Co
Consultant: Universal Design Center
Main Contractor: Urbacon Trading & Contracting Co.
Main Sub Contractor: Golden Bay Contracting & Trading

Snag Observation Report Apartment No : 72


Action Completion Number of
Sr.No Report Date Location Description of Defect/Snag Photos Before Photos After Action Date Taken Status Date Days Open Signature

Main Door 1. Visible gaps and excess grouts on


5 05/25/21 Entry Living the side edges of the wall switch
Area

1. Visible stripped-off wall surface,


6 05/25/21 Guest Toilet excess paint marks on the side
edges of the door frame

Panel board 1. Visible incomplete plastering and


7 05/25/21 cupboard
painting on the wall surface

Page 3
Project Name: Rawdat Al Khail Building (3B+G+8F+PH)
Client : Assets Real Estate Development Co
Consultant: Universal Design Center
Main Contractor: Urbacon Trading & Contracting Co.
Main Sub Contractor: Golden Bay Contracting & Trading

Snag Observation Report Apartment No : 72


Action Completion Number of
Sr.No Report Date Location Description of Defect/Snag Photos Before Photos After Action Date Taken Status Date Days Open Signature

1. Ceiling sprinkler cover cap


8 05/25/21 Kitchen
missing

1. Ceiling sprinkler cover cap


9 05/25/21 Kitchen missing

1. Visible excess paint on the top


10 05/25/21 Living edges of the skirting and paint
marks on the sides

Page 4
Project Name: Rawdat Al Khail Building (3B+G+8F+PH)
Client : Assets Real Estate Development Co
Consultant: Universal Design Center
Main Contractor: Urbacon Trading & Contracting Co.
Main Sub Contractor: Golden Bay Contracting & Trading

Snag Observation Report Apartment No : 72


Action Completion Number of
Sr.No Report Date Location Description of Defect/Snag Photos Before Photos After Action Date Taken Status Date Days Open Signature

1. Visible excess paint on the top


11 05/25/21 Living edges of the skirting and paint
marks on the sides

1. Visible paint marks on the


12 05/25/21 Living surface of the ceiling mounted
motion sensor cover plate

1. Visible paint marks on the wall


13 05/25/21 Guest Toilet
tile surface

Page 5
Project Name: Rawdat Al Khail Building (3B+G+8F+PH)
Client : Assets Real Estate Development Co
Consultant: Universal Design Center
Main Contractor: Urbacon Trading & Contracting Co.
Main Sub Contractor: Golden Bay Contracting & Trading

Snag Observation Report Apartment No : 72


Action Completion Number of
Sr.No Report Date Location Description of Defect/Snag Photos Before Photos After Action Date Taken Status Date Days Open Signature

1. Visible paint marks on the


14 05/25/21 Kitchen
cabinet panel board

15 05/25/21 Kitchen 1. Visible paint marks on the side


of the Kitchen hod shaft

16 05/25/21 Kitchen 1. Missing Alum Ss cover sheet


on bottom shelves

Page 6
Project Name: Rawdat Al Khail Building (3B+G+8F+PH)
Client : Assets Real Estate Development Co
Consultant: Universal Design Center
Main Contractor: Urbacon Trading & Contracting Co.
Main Sub Contractor: Golden Bay Contracting & Trading

Snag Observation Report Apartment No : 72


Action Completion Number of
Sr.No Report Date Location Description of Defect/Snag Photos Before Photos After Action Date Taken Status Date Days Open Signature

1. Punctured and scratched wall


17 05/25/21 Kitchen
surfaces

1. Visible paint marks under the


18 05/25/21 Kitchen countertop and side board

1. Visible excess paint marks on


19 05/25/21 Kitchen
the top of the skiritng

Page 7
Project Name: Rawdat Al Khail Building (3B+G+8F+PH)
Client : Assets Real Estate Development Co
Consultant: Universal Design Center
Main Contractor: Urbacon Trading & Contracting Co.
Main Sub Contractor: Golden Bay Contracting & Trading

Snag Observation Report Apartment No : 72


Action Completion Number of
Sr.No Report Date Location Description of Defect/Snag Photos Before Photos After Action Date Taken Status Date Days Open Signature

1. Visible excess paint marks on


20 05/25/21 Living
the top of the skiritng

1. Incomplete installation of Data


21 05/25/21 Living outlet and accessories

1. Visible streak marks on the


22 05/25/21 Living wall surface and incomplete
painting under the beam soffit

Page 8
Project Name: Rawdat Al Khail Building (3B+G+8F+PH)
Client : Assets Real Estate Development Co
Consultant: Universal Design Center
Main Contractor: Urbacon Trading & Contracting Co.
Main Sub Contractor: Golden Bay Contracting & Trading

Snag Observation Report Apartment No : 72


Action Completion Number of
Sr.No Report Date Location Description of Defect/Snag Photos Before Photos After Action Date Taken Status Date Days Open Signature

1. Visible excess black silicon


23 05/25/21 Living sealant and paint marks on the
side of the curtain wall frame

1. Visible streak marks on the


24 05/25/21 Living wall surface and incomplete
painting under the beam soffit

1. Pvc spacer support on glass


25 05/25/21 Balcony ballustrade not removed

Page 9
Project Name: Rawdat Al Khail Building (3B+G+8F+PH)
Client : Assets Real Estate Development Co
Consultant: Universal Design Center
Main Contractor: Urbacon Trading & Contracting Co.
Main Sub Contractor: Golden Bay Contracting & Trading

Snag Observation Report Apartment No : 72


Action Completion Number of
Sr.No Report Date Location Description of Defect/Snag Photos Before Photos After Action Date Taken Status Date Days Open Signature

1. Incomplete black silicon


application on the edges of the
26 05/25/21 Balcony handrail

1. Incomplete black silicon


application on the edges of the
27 05/25/21 Balcony handrail

1. Visible dried paint and dirt marks


28 05/25/21 Balcony on the stone cladding surface

Page 10
Project Name: Rawdat Al Khail Building (3B+G+8F+PH)
Client : Assets Real Estate Development Co
Consultant: Universal Design Center
Main Contractor: Urbacon Trading & Contracting Co.
Main Sub Contractor: Golden Bay Contracting & Trading

Snag Observation Report Apartment No : 72


Action Completion Number of
Sr.No Report Date Location Description of Defect/Snag Photos Before Photos After Action Date Taken Status Date Days Open Signature

1. Visible excess black silicon


29 05/25/21 Balcony sealant and paint marks on the
side of the sliding door frame

1. Visible excess black silicon


30 05/25/21 Balcony sealant and paint marks on the
side of the sliding door frame

Page 11
Project Name: Rawdat Al Khail Building (3B+G+8F+PH)
Client : Assets Real Estate Development Co
Consultant: Universal Design Center
Main Contractor: Urbacon Trading & Contracting Co.
Main Sub Contractor: Golden Bay Contracting & Trading

Snag Observation Report Apartment No : 72


Action Completion Number of
Sr.No Report Date Location Description of Defect/Snag Photos Before Photos After Action Date Taken Status Date Days Open Signature

31 05/25/21 Balcony 1. Visible stripped paint marks on


the side of the sliding door frame

32 05/25/21 Bedroom 1. Wood door panel removed

Page 12
Project Name: Rawdat Al Khail Building (3B+G+8F+PH)
Client : Assets Real Estate Development Co
Consultant: Universal Design Center
Main Contractor: Urbacon Trading & Contracting Co.
Main Sub Contractor: Golden Bay Contracting & Trading

Snag Observation Report Apartment No : 72


Action Completion Number of
Sr.No Report Date Location Description of Defect/Snag Photos Before Photos After Action Date Taken Status Date Days Open Signature

1. Ceiling sprinkler cover cap


33 05/25/21 Bedroom
missing

1. Visible excess grout and paint


34 05/25/21 Bedroom marks on the side of the door
frame

1. Incomplete installation of Data


35 05/25/21 Bedroom outlet and accessories

Page 13
Project Name: Rawdat Al Khail Building (3B+G+8F+PH)
Client : Assets Real Estate Development Co
Consultant: Universal Design Center
Main Contractor: Urbacon Trading & Contracting Co.
Main Sub Contractor: Golden Bay Contracting & Trading

Snag Observation Report Apartment No : 72


Action Completion Number of
Sr.No Report Date Location Description of Defect/Snag Photos Before Photos After Action Date Taken Status Date Days Open Signature

1. Incomplete painting on the


36 05/25/21 Bedroom wall surface near the edges of
the wall outlet

1. Incomplete application of
black silicon and removal of pvc
37 05/25/21 Bedroom spacer on all sides of the Sliding
door frame

1. Visible dirt marks on the wall


38 05/25/21 Bedroom surface

Page 14
Project Name: Rawdat Al Khail Building (3B+G+8F+PH)
Client : Assets Real Estate Development Co
Consultant: Universal Design Center
Main Contractor: Urbacon Trading & Contracting Co.
Main Sub Contractor: Golden Bay Contracting & Trading

Snag Observation Report Apartment No : 72


Action Completion Number of
Sr.No Report Date Location Description of Defect/Snag Photos Before Photos After Action Date Taken Status Date Days Open Signature

1. Incomplete painting on the


39 05/25/21 Bedroom wall surface near the edges of
the sliding door frame

1. Incomplete painting on the


40 05/25/21 Bedroom wall surface near the edges of
the door frame

Page 15
Project Name: Rawdat Al Khail Building (3B+G+8F+PH)
Client : Assets Real Estate Development Co
Consultant: Universal Design Center
Main Contractor: Urbacon Trading & Contracting Co.
Main Sub Contractor: Golden Bay Contracting & Trading

Snag Observation Report Apartment No : 72


Action Completion Number of
Sr.No Report Date Location Description of Defect/Snag Photos Before Photos After Action Date Taken Status Date Days Open Signature

1. Incomplete painting on the


41 05/25/21 Bedroom wall surface near the edges of
the wall outlet

1.Visible excess paint drops on the


42 05/25/21 Bedroom edge corner of the wardrobe sliding
door track

1.Visible excess paint drops on the


43 05/25/21 Bedroom edge corner of the wardrobe sliding
door track

Page 16
Project Name: Rawdat Al Khail Building (3B+G+8F+PH)
Client : Assets Real Estate Development Co
Consultant: Universal Design Center
Main Contractor: Urbacon Trading & Contracting Co.
Main Sub Contractor: Golden Bay Contracting & Trading

Snag Observation Report Apartment No : 72


Action Completion Number of
Sr.No Report Date Location Description of Defect/Snag Photos Before Photos After Action Date Taken Status Date Days Open Signature

1. Uneven termination of ceiling


44 05/25/21 Bedroom shadow gap

1.Visible excess paint drops on the


45 05/25/21 Bedroom wall switch cover plate

Bedroom 1. Ceiling sprinkler cover cap


46 05/25/21
Toilet missing

Page 17
Project Name: Rawdat Al Khail Building (3B+G+8F+PH)
Client : Assets Real Estate Development Co
Consultant: Universal Design Center
Main Contractor: Urbacon Trading & Contracting Co.
Main Sub Contractor: Golden Bay Contracting & Trading

Snag Observation Report Apartment No : 72


Action Completion Number of
Sr.No Report Date Location Description of Defect/Snag Photos Before Photos After Action Date Taken Status Date Days Open Signature

Bedroom 1.Visible uneven edges of the ceiling


47 05/25/21 corners
Toilet

Bedroom 1. Visible rust on the floor drain


48 05/25/21 Toilet cover plate

Bedroom 1. Visible pencil marks on the wall


49 05/25/21 tile surface
Toilet

Contractor- GBCT Consultant-UDC Operator -Retaj Client -Assets

Signature/ Date

Page 18
Project Name: Rawdat Al Khail Building (3B+G+8F+PH)
Client : Assets Real Estate Development Co
Consultant: Universal Design Center
Main Contractor: Urbacon Trading & Contracting Co.
Main Sub Contractor: Golden Bay Contracting & Trading

Snag Observation Report Apartment No : 72


Action Completion Number of
Sr.No Report Date Location Description of Defect/Snag Photos Before Photos After Action Date Taken Status Date Days Open Signature

Name Wafieq Altouki -PM Michael Domagas-PM Malek Nabhan-HM Ragheb Jalabi-PD

Page 19
Apartment No : 726

Remarks

Page 20
Apartment No : 726

Remarks

Page 21
Apartment No : 726

Remarks

Page 22
Apartment No : 726

Remarks

Page 23
Apartment No : 726

Remarks

Page 24
Apartment No : 726

Remarks

Page 25
Apartment No : 726

Remarks

Page 26
Apartment No : 726

Remarks

Page 27
Apartment No : 726

Remarks

Page 28
Apartment No : 726

Remarks

Page 29
Apartment No : 726

Remarks

Page 30
Apartment No : 726

Remarks

Page 31
Apartment No : 726

Remarks

Page 32
Apartment No : 726

Remarks

Page 33
Apartment No : 726

Remarks

Page 34
Apartment No : 726

Remarks

Page 35
Apartment No : 726

Remarks

Page 36
Apartment No : 726

Remarks

Page 37