TECHNICAL & MATERIAL SUBMISSION FORM

Reference No : Submitted By : Henry Reviewed By: Angus Lee

GD/1027/TMSF/GDP/019 Signature : Signature :

Company Name : GD Capital Holdings S/B Company Name : GD Capital Holdings S/B

To : GDP Architects Sdn.Bhd Type of Submission : Shop Drawing ✔ Material Technical


Attention : Ar. Haziph / Ms. Bibi See / Ms. Arizah Amin

Submission Date : 08 Jan 2022 ✔ 1 st Submission Re-submission


Project Title : Tropicana Gardens 2 (Phase 7)
Proposed Date of 1st Use : 15 Jan 2022
1.0 REFERENCE 2.0 PRODUCT DETAILS

Item No. : Item Material Description Proposed Brand / Model Contract Brand / Model
Contract Doc Ref. : Fire Resistance Roller Shutter & Non-
1 SKB Star Rolling
Specification Ref : Wall Finishes Fired Rated Roller Shutter

Brand Name : Checklists (Category A, B and C) :


Country of Origin :
Trade : Architectural Finishes 1) Product submission in accordance to contract offer Yes No
2) Fully comply with Contract (i.e. specifications, drawings, BQ etc.) Yes No
3) Compliance with Malaysian Standards, Regulations and code of practice Yes No
4) Compliance with Authorities and Utility's company requirements Yes No
Phase : 7 5) Fit for purpose? Yes No
Sub-Contractor : GD Builders Sdn Bhd 6) Practical for construction and end user normal usage? Yes No
7) Quality (any warranty?) Yes No
Location for Use : Tropicana Gardens 2 8) Cost Implication? Yes No
9) Logistics and service. Any issue on delay in delivery? Yes No
Application for Use : Fire Resistance Roller Shutter & 10) Market availability (during construction & DLP) Yes No
Non-Fired Rated Roller Shutter 11) Past experience with material Yes No
Manufacturer / :
Fabricator *For 'No', justification is required for Non-compliance/Deviations
Reasons of Non-compliance / Deviations : ______________________________________
Manufacturer / : _________________________________________________________________________
Fabricator Address
Attachments :
- Equipment Selection - Certificates of Compliance/ ✔
Type of Material Materials as per Contract / Design - Design Calculation ✔ Authority Certificates
(Category) Specification (A) - Contract Specifications - Warranty ✔
Compliance Sheet (Mandatory) - Test Reports ✔
√ Alternative Materials / Brands (B) - Method Statement ✔ - Company Profile ✔
- Catalogue / Technical Sheet ✔ - Operation and Maintenance ✔
Special Materials (C) - Shop drawing / Schematic ✔ Manual
(Not submitted in the contract) - Job Reference List ✔ - Sample

3.0 APPROVAL / COMMENTS

Action Codes :

A = Proceed in accordance with the submission


B = Subject to consultant's comments
C = Re-submission / Rejected with comments

Consultant's Comments :

Approved by :

Name :
Company :
Date :

* Note: Consultant to enter Action Codes and Remarks, and return to Main Contractor
This approval shall not be construed to relieve the Contractors from the responsibility to meet all requirements of the Contract Documents.

4.0 DISTRIBUTION LIST (To mark "X" )

Submit Reply Submit Reply


Architect ✔ ✔ M&E Engineer
Civil & Structural Engineer Landscape Architect
Employer - Project - PIC * ✔ Quantity Surveyor
Employer - C&C - PIC * Site Office
Employer - M&E - PIC* Others :
Employer - Planning & Design - PIC*

* Compulsory to copy via email if deviations / alternative proposal is being submitted for Employer's approval

Doc. Ref.: PRC/P01/F/TMSF Revision : 3 Page : 1 of 2 Effective Date : 04/05/2021


MOTORISED ROLLER SHUTTER

Roller Shutter Motor


Model Various Upon Speci cation

Stainless Steel
Metal Key-box

with Motorised Operator

fi
MOTORISED ROLLER SHUTTER

The manufacturer shall provide motor pulling capacity and the


calculation of the roller shutter slats working weight. The motor
shall be equipped (1) auto thermo cut-off sensor (2) galvanised
manual override chain (3) upper-and-lower limit switch (4) low
voltage push button control for up-stop-down that come with
stainless steel enclosed key box. (5) All motors pulling capacity
must be factored at least 10% over-capacity for safety purpose.

Remote Control (Optional)

Obstruction Sensor (Optional)

13B Jalan TIAJ 2/5 ,


Taman Perindustrian Alam Jaya,
42300 Bandar Puncak Alam, Selangor,
Malaysia.

Tel: +60-3-6038 5050


Fax: +60-3-6038 9329
Email: marketing@shutter.my

www.shutter.my

METHOD STATEMENT FOR INSTALLATION OF Revision No.: 02


FIRE RATED AND NON-FIRE RATED MOTORIZED
ROLLER SHUTTER Date: 23/04/2021

TABLE OF CONTENTS

1.0 PURPOSE AND SCOPE ............................................................................................. 2

2.0 REFERENCES ............................................................................................................ 2

3.0 RESOURCE PLANNING ............................................................................................. 2

3.1 PERSONNEL/ MANPOWER ....................................................................................... 2

3.2 LIST OF TOOLS, EQUIPMENT AND MACHINERIES ................................................ 3

3.3 LIST OF COMPONENT AND PART............................................................................ 3

4.0 HANDLING AND STORAGE....................................................................................... 3

5.0 WORK METHODOLOGY ............................................................................................ 4

1
METHOD STATEMENT FOR INSTALLATION OF Revision No.: 02
FIRE RATED AND NON-FIRE RATED MOTORIZED
ROLLER SHUTTER Date: 23/04/2021

1.0 PURPOSE AND SCOPE

The purpose of this method statement is to outline the work procedure for installation of
Non-Fire Rated Motorized and Fire Rated roller shutter. The scope of this work is to be
install at site.

2.0 REFERENCES

1. Project Specification
2. Construction Drawings
3. Approval Shop Drawings

3.0 RESOURCE PLANNING

Sufficient resources such as personnel/manpower, tools, equipment and material will be


provided as per the tables below.

3.1 Personnel / manpower

No. Position Responsibility


To make sure overall works implementation is in order.
1. Project Manager

To monitor site progress as per schedule. To plan for daily


2. Site Engineer works.

Supervise site activities


3. Team Captain
To installed the roller shutter
4. Skilled Workers
Assist on installation and conduct general works at site
5. General Workers

2
METHOD STATEMENT FOR INSTALLATION OF Revision No.: 02
FIRE RATED AND NON-FIRE RATED MOTORIZED
ROLLER SHUTTER Date: 23/04/2021

3.2 List of Tools, Equipment and Machineries

No. Tools, Equipment and machineries


1 Hand drill
2 Hammer Drill
3 Cutter
4 Grinder
5 Inverter welding set
6 Hammer
7 Screw Driver
8 Spanner
9 Steel Cutter
10 Test Pen
11 Ladder
12 Laser Self levelling
13 Genset
14 Chain block

3.3 List of Component and Part

No. Material
1 Door Casing
2 Slats
3 Bottom Bar
4 Side Guide
5 Control switch button and stainless-steel locker
6 Thermal Fusible Link (Fire Rated)

4.0 HANDLING AND STORAGE

1) The fabricated unassembled components will be delivered to the actual installation


location provided when the site is clear from obstruction.

2) It is important to store the roller shutter components in an area that is ventilated, shaded
and free of water accumulation.

3) It is important to elevate all the components off the ground with a suitable material (e.g.,
wood).

4) All material delivered to site must be stored in an approved location and material must be
grouped and packed accordingly.

3
METHOD STATEMENT FOR INSTALLATION OF Revision No.: 02
FIRE RATED AND NON-FIRE RATED MOTORIZED
ROLLER SHUTTER Date: 23/04/2021

5.0 WORK METHODOLOGY

5.1 Preparation Work

1) An initial site survey and study must be conducted to gain an actual understanding of the
actual site condition. It’s to observe the surrounding and make the analysis of all related
factors that would affect the progress of work.

2) Among factors to take note are power supply requirement, water supply requirement,
delivery channel to actual installation location, marking of actual installation location and,
etc.

3) Marking of actual installation location is according to the latest construction drawing


issued by the architect must be marked by suitable means (e.g., spray paint). A written
confirmation must be obtained from the main-con or authorized consultant for the marking
to ensure that the marking reflects actual installation location.

4) Measurement taking may be performed upon or after the study of the site. However, the
fabrication shall commence after the actual installation location and orientation have been
confirmed and finalized.

5) Delivery channel to actual installation location is the utmost importance during initial site
study to determine delivery passage and logistics from factory to site, site to actual
installation location.

6) It is important to take note (especially for oversize roller shutter) of the site situation
including wall to wall, turning corners opening space, distance, method of carrying, floor
to floor access, constructed wall, future obstruction.

7) The access to the site must be safe and easily transport for all the roller shutter c/w
accessories.

8) The installation site must be clear and free from collected water on the floor or any
obstruction pipe, trunking and etc.

4
METHOD STATEMENT FOR INSTALLATION OF Revision No.: 02
FIRE RATED AND NON-FIRE RATED MOTORIZED
ROLLER SHUTTER Date: 23/04/2021

5.2 Installation of Roller Shutter

5.2.1 Setting Out

1. Using laser leveller to do the level marking

2. Mark the horizontal level on both sides

3. Mark the vertical centre line to ensure a symmetrical balance

5
METHOD STATEMENT FOR INSTALLATION OF Revision No.: 02
FIRE RATED AND NON-FIRE RATED MOTORIZED
ROLLER SHUTTER Date: 23/04/2021

5.2.2 Installation of Casing

Install the roller shutter motor on the ground level before installing the casing

1. Position the roller shutter casing against the marks, by hoisting the roller shutter with
appropriate mechanism.

2. Ensure the roller shutter is positioned in symmetrical balance.

6
METHOD STATEMENT FOR INSTALLATION OF Revision No.: 02
FIRE RATED AND NON-FIRE RATED MOTORIZED
ROLLER SHUTTER Date: 23/04/2021

3. Once the position is confirmed, drill receiving holes.

4. For no 4 and 5 mount the casing structure against the wall by using appropriate
anchor sleeve / bolt & nut / fasteners.

7
METHOD STATEMENT FOR INSTALLATION OF Revision No.: 02
FIRE RATED AND NON-FIRE RATED MOTORIZED
ROLLER SHUTTER Date: 23/04/2021

5.2.3 Inserting of Slats

Install the slat connector

1. Determine the position of slats connector.

2. Ensure all the slat connectors are secured by bolt with a washer in between.

3. Make the slat connectors are securely fastened.

8
METHOD STATEMENT FOR INSTALLATION OF Revision No.: 02
FIRE RATED AND NON-FIRE RATED MOTORIZED
ROLLER SHUTTER Date: 23/04/2021

Installing the Slats

4. After installing the slat connectors, insert the remaining slats inter-locking.

5. Use the manual override chain to pull all the slats into position, with the bottom bar
last. (DO NOT use the electrical motor during the slats installation).

9
METHOD STATEMENT FOR INSTALLATION OF Revision No.: 02
FIRE RATED AND NON-FIRE RATED MOTORIZED
ROLLER SHUTTER Date: 23/04/2021

5.2.4 Installation of Side-Guides

1. Ensure the side guides are positioned at 90° straight against the casing

2. Mount the side guides against the wall by using appropriate anchor sleeve / bolt & nut /
fasteners.

10
METHOD STATEMENT FOR INSTALLATION OF Revision No.: 02
FIRE RATED AND NON-FIRE RATED MOTORIZED
ROLLER SHUTTER Date: 23/04/2021

5.2.5 Installation of Control Button & Limit Switch Setting

1. Set the (top / ceiling level) and (ground / par level) at the roller shutter mechanical limit
switch. Connect the roller shutter to the power source (MUST check the power supply
requirement before connecting).

2. Test the pre-set stopping level. Reset the limit switch if needed.

3. Fix the push button control together with piping and stainless-steel key box.

11
METHOD STATEMENT FOR INSTALLATION OF Revision No.: 02
FIRE RATED AND NON-FIRE RATED MOTORIZED
ROLLER SHUTTER Date: 23/04/2021

5.2.6 Installation of Casing Cover

1. Position the top casing cover.

2. Secure the top casing cover by using self-tightening screws.

3. Position the bottom casing cover.

4. Secure the bottom casing cover by using self-tightening screws.

5. Position the front casing cover.

6. Secure the front casing cover by using self-tightening screws.

12
METHOD STATEMENT FOR INSTALLATION OF Revision No.: 02
FIRE RATED AND NON-FIRE RATED MOTORIZED
ROLLER SHUTTER Date: 23/04/2021

5.2.7 Installation Fire Roller Shutter Control Box

1) The fire shutter control box is the basic control for fire rated shutter with 24VDC relay
(model: RCP 8 002 24 DC) to trigger the shutter closure when receive 24V signal from
the building’s fire alarm system.

2) Box will be fastened at the top of casing cover, near to motor location.

3) The 2-wire fire signal will be connected to relay.

4) All other motor related interfaces and accessories will be installed at this stage; like
back-up battery (UPS), obstruction sensor, etc.

13
METHOD STATEMENT FOR INSTALLATION OF Revision No.: 02
FIRE RATED AND NON-FIRE RATED MOTORIZED
ROLLER SHUTTER Date: 23/04/2021

5.2.8 Installation of Thermal Fusible Link (TFL).


Notes: Installation May Differ from Model to Model

1. Secure the “L” Shape chassis support by using self-tightening screws


against the casing.

2. Mount the overload switch by using the screw set provided.

3. Adjust the overload switch. Ensure the bottom bar touches the switch if the
bottom bar is about to run into the casing.

14
METHOD STATEMENT FOR INSTALLATION OF Revision No.: 02
FIRE RATED AND NON-FIRE RATED MOTORIZED
ROLLER SHUTTER Date: 23/04/2021

1) TFL is a mechanical motor break coil release mechanism when the temperature around
68°C - 70°C. (TFL is replaceable and usable). Gravity weight should be tested for
gravity-driven closure.

15
METHOD STATEMENT FOR INSTALLATION OF Revision No.: 02
FIRE RATED AND NON-FIRE RATED MOTORIZED
ROLLER SHUTTER Date: 23/04/2021

5.3 Finishing and Cleaning

1) Cleaning will be performed for each installation of roller shutter to ensure that the end
product is clean from major and obvious stains.

2) Final checking – free from damage / defect

5.4 Overall Functionality Test

1) Upon completion of installation, a functionality test must be conducted to ensure a smooth


functioning of the roller shutter.

2) The functionality test will be conduct as per below items: -

 Test the open stop close

 To observe the roller shutter in operation

 To test the overload limit switch; and reset

 To test the 24VDC relay when receiving the fire alarm signal

16
6TFS.BOVBM 5.

฀ ฀

45"330--*/( 5.

STAR ROLLING
൏քड૑‫܄‬၃Ⴜདྷ‫܋‬ය
Tel: 03-61890332 Fax: 03-61898329

Roller shutter is our specialization


,OPXJOHZPVSSPMMFSTIVUUFS

:PVSSPMMFSTIVUUFSJTNBOVGBDUVSFECZ

STAR ROLLING Shutter Sdn. Bhd.


൏քड૑‫܄‬၃Ⴜདྷ‫܋‬ය
+BMBO# 4QSJOH$SFTU*OEVTUSJBM1BSL 
#BUV$BWFT 4FMBOHPS .BMBZTJB
Tel: 03-61890332 Fax: 03-61898329
#BTJD0QFSBUJPO 0QFO 4UPQ$MPTF

6TJOH1VTI#VUUPO4XJUDI$POUSPM 1#4$

-PDBUJPOPG1VTI#VUUPO4XJUDI$POUSPM

 .BLFTVSFUIFQPXFSTVQQMZJTBWBJMBCMF
 BOEDPOOFDUFETBGFMZBOETVDVSFMZ
 :PVNVTUMPDBUFUIF1#4$GPSUIF
 QBSUJDVMBSSPMMFSTIVUUFSZPVXBOUUP 
 PQFSBUF
 5IF1#4$VTVBMMZJOTUBMMJOUIFMFGU03SJHIU
 TJEFPGUIFSPMMFSTIVUUFS
฀ ฀

'VODUJPOPG1VTI#VUUPO4XJUDI$POUSPM

 5IFTUBOEBSE1#4$DPOUBJOTCVUUPOT

6Q0QFO  #VUUPOJTGPS6Q030QFO

 #VUUPOJTGPS4UPQ0OMZVTFUIF
 4UPQCVUUPOXIFOZPVXBOUUPTUPQ
 TIVUUFSDVSUBJOQBSUJDVMBSMFWFM
4UPQ
 #VUUPOJTGPS%PXO03$MPTF

/PUF %VSJOHOPSNBMPQFSBUJOHDPOEJUJPOT 


%PXO$MPTF  CPUI0QFOBOE$MPTFBSF
 QSFTFUFEUPTUPQBVUPNBUJDBMMZJOUIF
 DFJMJOHBOEHPVOEMFWFM

฀ ฀ ฀ ฀

฀ ฀


.BOVBM0WFSSJEF4ZTUFN ฀ ฀ ฀ ฀ ฀ ฀ ฀ ฀

6TJOH.BOVBM0WFSSJEF4ZTUFNUPPQFSBUFZPVSSPMMFSTIVUUFS
8IFOUPVTF.BOVBM0WFSSJEF4ZTUFN

 1PXFSGBJMVSF
 *SSFHVMBSQPXFSTVQQMZ
 4IPSUDJSDVJU

#!54)/.
 :PVNVTUVOQMVH"/%EJTDPO
-AX
 OFDUUIFQPXFSTVQQMZ 

/PENING  XIFOVTJOHUIF.BOVBM 
 0WFSSJEF4ZTUFN
-ANUAL  .BOVBM0WFSSJEF4ZTUFN
/VERRIDE  JTOPUGPSOPSNBMBOESFHV
#HAIN
 MBSVTBHF

./4%
%JSFDUJPOGPSVTF  5IF.BOVBM0WFSSJEF$IBJO
 1VMMUIFNBOVBMPWFSSJEFDIBJOUP   JTMPDBUFEVOEFSOFBUIUIF
 PQFSBUF0CTFSWFUIFEJSFDUJPOPGUIF
 TIVUUFSDVSUBJOEVSJOHPQFSBUJPO
 NPUPSPQFSBUPS
 :PVTIPVMEPQFOVQUPBNBYJNVN  1BDLUIFPWFSSJEFDIBJO
 PGUIFSPMMFSTIVUUFSBMMPXFEPQFOJOH  VOEFSOFBUIUIFPQFSBUPS
 XIJMFVTJOH.BOVBM0WFSSJEF4ZTUFN
 XIFOOPUJJOVTF

$BSFGPSZPVSNPUPSJ[FESPMMFSTIVUUFS
 6TFZPVSNPUPSJ[FESPMMFSTIVUUFSSFHVMBSMZ BUMFBTUPODFBXFFL

 CVU%0/05PWFSSVOUIFNPUPSPQFSBUPSDPOUJOVPVTMZCFDBVTFJUJTOPU
 EFTJHOFEGPSIFBWZVTBHF
 "QQMZHSFBTFJOUIFNPWBCMFQBSUT MJLFTJEFHVJEFT
PGUIFSPMMFS
 TIVUUFS
 %0/05SFQBJSPSTFSWJDFZPVSSPMMFSTIVUUFSXJUIVOBVUIPSJ[FEBOE
 VORVBMJmFESPMMFSTIVUUFSTFSWJDFQSPWJEFST

2VFTUJPOT 3FQBJS4FSWJDFOFFEFE
1MFBTFDPOUBDUZPVSSPMMFSTIVUUFSTVQQMJFSPSUIFNBOVGBDUVSFS
STAR ROLLING SHUTTER SDN. BHD. (49611-W)

LIST OF PROJECT FOR YEAR 2017

ORIGINAL
CLIENT COMPANY
PROJECT TITLE CONTRACT STATUS
NAME
SUM (RM)

THE PROPOSED AND COMPLETION OF 3 BLOKS 20 STOREY


PEMBINAAN (1062 UNITS) PUBLIC APARTMENT "PERUMAHAN PENJAWAT
MITRAJAYA SDN. AWAM MALAYSIA" (PPA1M) INCLUSIVE OF 2 BLOCKS MULTI- 37,080.00 COMPLETED
BHD. LEVEL PARKING AND COMMON FACILITIES ON PT 12960 AT
PLOT 5R5, PRECINCT 5, PUTRAJAYA.

PEMBINAAN LOJI RAWATAN KUMBAHAN SUB-SERANTAU


RD RESOURCES SB UPPER KERAYONG DI ZON 1-TAMAN MALURI C DAN ZON 3- 156,713.58 ON-GOING
TAMAN LEMBAH MAJU, SELANGOR DARUL EHSAN.

UBAHSUAIAN KEPADA SEBUAH BANGUNAN PUSAT


PERUBATAN SWASTA 8 TINGKAT DAN 2 TINGKAT ARAS
BAWAH TANAHBESERTA TEMPAT LETAK KENDERAAN
BERTINGKAT DI SEBUAH BANGUNAN PUSAT PERUBATAN
SWASTA (7 TINGKAT) YANG SEDIA ADA (FASA 1&2) ATAS LOT
SUNWAY
41, LOT 45, LOT 38160 DAN SEBAHAGIAN TANAH KERAJAAN
CONSTRUCTION SDN. 35,000.00 COMPLETED
NO 5, JALAN LAGOON SELATAN, BANDAR SUNWAY, 47500
BHD.
SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING,
SELANGOR DARUL EHSAN UNTUK SUNWAY MEDICAL
CENTRE SDN BHD.- SUNWAY MEDICAL CENTRE PHASE
3A&3B-MAIN BUILDING WORKS, EARTHWORKS, PILING
WORKS & RE WALL

CADANGAN MEMBINA SEBUAH GUDANG SATU TINGKAT


SERTA PEJABAT DUA TINGKAT YANG MENGANDUNGI: A)
BLOK GUDANG 1 TINGKAT BESERTA PEJABAT 1 TINGKAT B) 1
BLOCK PEJABAT 2 TINGKAT C) 1 PONDOK PENGAWAL D) 1
EVERSENDAI UNIT TEMPAT SAMPAH E) 1 UNIT TNB SUB-STATION F) 1
381,600.00 COMPLETED
ENERGIA SDN. BHD. UNIT BILIK PAM G) TANGKI BOMBA H) TEMPAT LETAK
KENDERAAN BERBUMBUNG DI ATAS PLOT G, SEBAHAGIAN
PLOT P322, BATU KAWAN MUKIM 13, LINGKARAN CASSIA
SELATAN, DAERAH SEBERANG PRAI SELATAN, PULAU
PINANG.

NIAGA SARI SDN. PLOT 6R9. P.T 13069 PRESINT 6, PUTRAJAYA (PPA1M
13,763.00 COMPLETED
BHD. PUTRAJAYA PARCEL 2)

Page 1 of 5
STAR ROLLING SHUTTER SDN. BHD. (49611-W)

LIST OF PROJECT FOR YEAR 2017

ORIGINAL
CLIENT COMPANY
PROJECT TITLE CONTRACT STATUS
NAME
SUM (RM)

CADANGAN 1 BLOK PANGSAPURI PERKHIDMATAN YANG


MENGANDUNGI 35 UNIT DARI TINGKAT 9 HINGGA 25,
KEMUDAHAN AWAM, DEWAN SERBAGUNA, DEWAN
KOMUNITI, KOLAM RENANG, BILIK GYM, CAFETERIA DI
TINGKAT 8, 30 UNIT LOT PERNIAGAAN DI TINGKAT BAWAH
PEMBINAAN
DAN TINGKAT 1, TEMPAT LETAK KERETA DI TINGKAT 2 49,000.00 COMPLETED
LEGASTIA SDN. BHD.
HINGGA 7, 2 UNIT PONDOK PENGAWAL 1 TINGKAT,
BANGUNAN UTILITI 2 TINGKAT DI ATAS LOT NO P.T. 41571,
JALAN PTP 1/1, TAMAN PERINDUSTRIAN TASIK PERDANA
PUCHONG, MUKIM DENGKIL, DAERAH SEPANG, SELANGOR
DARUL EHSAN.

CADANGAN PEMBANGUNAN BERCAMPUR YANG


MENGANDUNGI:- 1 BLOK SERVIS APARTMEN 37 TINGKAT
(439 UNIT), - 1 BLOK SERVIS APARTMENT 26 TINGKAT (307
PEMBINAAN UNIT), - 5 TINGKAT KEDAI / RUANG PERNIAGAAN (249 UNIT),
IKHASAS-MERAK - 1 TINGKAT KEMUDAHAN AMENITI DI TINGKAT 3, 955,381.00 COMPLETED
SDN. BHD. TERMASUK - 3 TINGKAT BASEMEN TEMPAT LETAK KERETA DI
ATAS LOT 5 (PLOT Z5), LOT 6 (PLOT Z6), LOT 7 (PLOT Z7) DAN
LOT 8 (PLOT Z8), PRESINT 1, PUTRAJAYA UNTUK
SHAFTSBURY AVENUE SDN BHD.

ORIENT AROTEK
ENGINEERING & DAIKIN, SG. BULUH 105,206.8 COMPLETED
TRADING SDN. BHD.

THE PROPOSED CONSTRUCTION AND COMPLETION OF THE


PANGKALAN SEMENANJUNG PASUKAN GERAKAN UDARA
AHMAD ZAKI SDN. POLIS DIRAJA MALAYSIA ON PART OF LOT 1210 (PA 27811),
62,674.00 COMPLETED
BHD. JALAN LAPANGAN TERBANG SUBANG, SEKSYEN U3, SHAH
ALAM, SELANGOR DARUL EHSAN FOR PERBADANAN
PERWIRA HARTA MALAYSIA-PACKAGE 2.

Page 2 of 5
STAR ROLLING SHUTTER SDN. BHD. (49611-W)

LIST OF PROJECT FOR YEAR 2017

ORIGINAL
CLIENT COMPANY
PROJECT TITLE CONTRACT STATUS
NAME
SUM (RM)

CADANGAN PEMBANGUNAN 8 BLOK KOMERSIL (100 UNIT)


STRATA MENGIKUT SEKSYEN 6 (1A) AKTA 318 (AKTA HAK
MILIK STRATA 1985) YANG MENGANDUNGI :- 1) 5 LOT 4
TINGKAT LOT TEPI 2) 39 LOT 3 TINGKAT 3) 20 UNIT KEDAI
MAMPU MILIK TINGKAT 2 & 3 BLOK D 4) 1 UNIT RUMAH
SAMPAH 5) 1 TINGKAT BESMEN TEMPAT LETAK KERETA 6) 3
UNIT PENCAWANG ELEKTRIK DI ATAS PT 12051, MKN
TIU KOOI TING
EMBASSY TECHZONE, JALAN TEKNORAT 2, CYBERJAYA, 43,900.00 COMPLETED
CONSTRUCTION SB
MUKIM DENGKIL, DAERAH SEPANG, SELANGOR UNTUK
MKN EMBASSY DEVELOPMENT SDN BHD YANG TERDIRI
DARIPADA DUA FASA IAITU :- FASA 1 1) BLOK A,B,C,D DAN H
2) BESMEN DAN PELANTAR ARAS TANAH 3) BANGUNAN
MEKANIKAL DAN ELETRIKAL 4) KEBUK SAMPAH 5) KERJA-
KERJA LUARAN DAN INSFRATRUKTUR FASA 2 1) BLOK E,F
DAN G

DEWARAS MAJU SB STUDENT VILLAGE PAGOH 19,000.00 COMPLETED

FAB BUILDERS SDN.


NAZA TTDI SENTRALIS SHAH ALAM 50,212.00 COMPLETED
BHD.

CADANGAN UBAH SUAI KEPADA SEBUAH PASARAYA


SEDIADA YANG MELIBATKAN i. UBAHSUAI RUANG LANTAI
PERNIAGAAN DI ARAS BAWAH DAN ARAS 1 HINGGA 3, ii.
ADVANTES GROUP MENUKAR KEGUNAAN SEBAHAGIAN RUANG TEMPAT LETAK
111,788.56 COMPLETED
SDN. BHD. KERETA KEPADA RUANG PERNIAGAAN DI ARAS 4 DI ATAS
LOT PT 371, BANDAR PORT DICKSON, DAERAH PORT
DICKSON, NEGERI SEMBILAN UNTUK TETUAN REGINA
PROPERTIES & MANAGEMENT SDN. BHD.
CADANGAN MEMBINA 2 BLOK HOTEL 26 DAN 43 TINGKAT,
10 BLOCK PEJABAT 12-43 TINGKAT, 4 TINGKAT PODIUM
PERNIAGAAN DAN KEDAI PEJABAT 1-9 TINGKAT BASEMEN
MAMMOTH EMPIRE
TEMPAT LETAK KERETA DI ATAS SEBAHAGIAN LOT PT 44016
CONSTRUCTION SDN. 3,080,918.00 COMPLETED
DAN PT 44017, MUKIM SUNGAI BULOH, DAERAH PETALING,
BHD.
SELANGOR DARUL EHSAN UNTUK TETUAN COSMOPOLITAN
AVENUE SDN. BHD.

Page 3 of 5
STAR ROLLING SHUTTER SDN. BHD. (49611-W)

LIST OF PROJECT FOR YEAR 2017

ORIGINAL
CLIENT COMPANY
PROJECT TITLE CONTRACT STATUS
NAME
SUM (RM)

CADANGAN PEMBANGUNAN MEMBINA GUDANG


MERANGKUMI;- i) FASA 1 - GUDANG 1 TINGKAT (120 X
360M) DENGAN PEJABAT / BLOK SOSIAL 2 TINGKAT SERTA
SEBUAH PENCAWANG ELEKTRIK DAN SERTA SEBAHAGIAN
AME CONSTRUCTION
TANAH DI BAWAH SEKSYEN 200 KTN UNTUK KOLAM 254,378.00 COMPLETED
SDN. BHD.
TAKUNGAN (2.414 EKAR) DI ATAS LOT 7316 (P.T.3609),
JALAN KLANG - BANTING, MUKIM TELUK PANGLIMA
GARANG, DAERAH KUALA LANGAT, SELANGOR DARUL
EHSAN.
CPI EMPOWER SDN. PEMBANGUNAN PERNIAGAAN & PERUMAHAN DI
85,000.00 COMPLETED
BHD. SEREMBAN, N9
CADANGAN PEMBANGUNAN SATU BLOK BANGUNAN
PERDAGANGAN BERCAMPUR YANG MENGANDUNGI: FASA
1A: PASAR BASAH DAN KERING DAN DEWAN SERBAGUNA,
FASA 1B: 1 TINGKAT TEMPAT LETAK KERETA DI PARAS
CONLAY BESMEN, 4 TINGKAT PODIUM MENGANDUNGI 2 TINGKAT
CONSTRUCTION SDN. RUANG KOMERSIL DAN 2 TINGKAT TEMPAT LETAK KERETA, 140,000.00 COMPLETED
BHD. FASA 2: 5 TINGKAT PODIUM TEMPAT LETAK KERETA, 1
TINGKAT KEMUDAHAN PENDUDUK, 2 BLOK MENARA
PANGSAPURI SERVIS (425 UNIT) 17 TINGKAT DI ATAS LOT
11973, 11974 DAN LOT PT 471, JALAN 17/38, DAERAH
PETALING, SELANGOR (PACKAGE 2).
TSK CONSTRUCTION
PKFZ PULAU INDAH 130,952.00 COMPLETED
SB
THE CONSTRUCTION AND COMPLETION OF MAIN BUILDING
AND EXTERNAL WORKS FOR CADANGAN MEROBOH
BANGUNAN SEDIA ADA DAN MEMBINA SEMULA 1 BLOK
BANGUNAN 21 TINGKAT (TERMASUK 1 TINGKAT SEPARA
CERAH HARMONI BAWAH) YANG MENGANDUNGI RUANG NIAGA DAN RUANG
102,121.00 COMPLETED
SDN. BHD. PEJABAT BESERTA KEMUDAHAN AWAM DAN TEMPAT LETAK
KERETA DI ATAS PT 25, (DAHULUNYA LOT 31 DAN LOT 32),
MUKIM BANDAR PETALING JAYA, DAERAH PETALING, JALAN
SEMANGAT, SEKSYEN 13, PETALING JAYA, SELANGOR DARUL
EHSAN UNTUK TETUAN VISTAYU SDN. BHD.
CADANGAN MEMBINA BANGUNAN PENGURUSAN RUMAH
ACCORD MAYAT (MEMORIAL CENTRE) DI ATAS LOT 568, SEKSYEN 69,
CONSTRUCTION SDN. JALAN DEWAN BAHASA, KUALA LUMPUR UNTUK TETUAN 73,384.00 COMPLETED
BHD. PERSATUAN KWANGSI SELANGOR DAN KUALA LUMPUR
(PHASE 1)

Page 4 of 5
STAR ROLLING SHUTTER SDN. BHD. (49611-W)

LIST OF PROJECT FOR YEAR 2017

ORIGINAL
CLIENT COMPANY
PROJECT TITLE CONTRACT STATUS
NAME
SUM (RM)

CADANGAN MENDIRIKAN 59 UNIT KEDAI / PEJABAT 3


TINGKAT (24' X 85'), 1 UNIT BANGUNAN PERNIAGAAN 2
TINGKAT SERTA TEMPAT LETAK KERETA DI TINGKAT
PEMBINAAN BASEMENT & BUMBUNG, DAN 2 UNIT PENCAWANG
135,002.00 COMPLETED
LEGASTIA SB ELEKTRIK TNB DOUBLE CHAMBER DI ATAS LOT 268, LOT 269
& LOT 270, MUKIM SEMENYIH, DAERAH HULU LANGAT,
SELANGOR DARUL EHSAN UNTUK SIMFONI DUNIA SDN BHD
(COMPLEX).
PROPOSED MIXED DEVELOPMENT OF PHASE 1A, PHASE 1C &
PHASE 1F CONSISTING OF 1 BLOCK 27-STOREY OFFICE
TOWER (TOWER 3), 1 BLOCK OFFICE TOWER (TOWER 5), 1
BLOCK 25-STOREY OFFICE TOWER (TOWER 6), 1 BLOCK
PEMBINAAN OFFICE TOWER (TOWER 2) 1 BLOCK OFFICE TOWER (TOWER
127,057.00 COMPLETED
MITRAJAYA SB 1, 1 BLOCK SERVICE LEVEL, 4 STOREY OF BASEMENT CAR
PARK AND CENTRAL UTILITY BUILDING (CUB) ON LOT 12,
PERSIARAN BARAT, SECTION 52 BANDAR PETALING JAYA,
PETALING DISTRICT SELANGOR DARUL EHSAN FOR MESSRS
PJ SENTRAL DEVELOPMENT SDN BHD.

PEMBINAAN CONSTRUCTION AND COMPLETION OF ASIA SCHOOL OF


44,656.00 COMPLETED
MITRAJAYA SB BUSINESS (ASB) RESIDENTIAL BUILDINGS

1. CADANGAN MEROBOHKAN BANGUNAN PODIUM


SEDIAADA DAN MEMBINA BANGUNAN HOTEL 50 TINGKAT
BESERTA 6 TINGKAT BESMEN YANG MENGANDUNGI
TEMPAT LETAK KERETA DAN SERVIS
MEKANIKAL/ELEKTRIKAL, DAN 1 BLOK PODIUM 5 TINGKAT
YANG MENGANDUNGI TEMPAT LETAK KERETA,
AHMAD ZAKI SB PENCAWANG ELEKTRIK UTAMA TNB DAN KEMUDAHAN 34,000.00 COMPLETED
HOTEL YANG AKAN DISAMBUNGKAN DENGAN PEJABAT
SEDIADA. 2. MENAIKTARAF BANGUNAN PEJABAT 35
TINGKAT YANG SEDIADA DIATAS LOT 1194, JALAN SULTAN
ISMAIL, SEKSYEN 57, BANDAR KUALA LUMPUR WILAYAH
PERSEKUTUAN KUALA LUMPUR UNTUK TETUAN
PERMODALAN NASIONAL BERHAD.
CADANGAN TAMBAHAN DAN UBAHSUAIAN KEPADA
BANGUNAN SEDIA ADA YANG MELIBATKAN 1 BLOK
PERPUSTAKAAN DAN BILIK PEMBELAJARAN 3 TINGKAT
SEDIA ADA, 1 BLOK DEWAN SUKAN 3 TINGKAT SEDIA ADA,
SQA Builders SB 110,584.00 COMPLETED
SEBUAH STOR PERALATAN SUKAN 1 TINGKAT DI ATAS PT
39626 JALAN EQUINE, TAMAN EQUINE, MUKIM PETALING,
DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK THE
ALICE SMITH SCHOOL ASSOCIATION

Page 5 of 5
STAR ROLLING SHUTTER SDN. BHD. (49611-W)

LIST OF PROJECT FOR YEAR 2018

ORIGINAL
CLIENT COMPANY
PROJECT TITLE CONTRACT STATUS
NAME
SUM (RM)

CADANGAN MEMBINA DAN MENYIAPKAN 16 UNIT KEDAI /


PEJABAT 4 TINGKAT DI ATAS LOT 24332 & 24331, JALAN
Aik Bee Construction
RADINANUM, ZON J11, BANDAR BARU SRI PETALING, 57,872.00 COMPLETED
Sdn Bhd
MUKIM PETALING, KUALA LUMPUR UNTUK TETUAN
PETALING GARDEN SDN. BHD.

CADANGAN TAMBAHAN DAN PERUBAHAN SERTA MENUKAR


KEGUNAAN BANGUNAN PADA ARAS BESMEN 2, ARAS
BESMEN 1, ARAS BAWAH, ARAS 5, ARAS 6, ARAS 6A, ARAS
Quill Retail Malls Sdn
BUMBUNG DAN FASAD BANGUNAN KOMPLEKS 23,971.16 COMPLETED
Bhd
PERDAGANGAN 7 TINGKAT SEDIA ADA (QUILL CITY MALL) DI
ATAS LOT 2523, SEKSYEN 41, JALAN SULTAN ISMAIL KUALA
LUMPUR, UNTUK TETUAN QUILL RETAIL MALL SDN. BHD.

THE PROPOSED CONSTRUCTION AND COMPLETION OF 800


PEMBINAAN UNITS PUBLIC APARTMENT "PERUMAHAN PENJAWAT
MITRAJAYA SDN. AWAM 1 MALAYSIA" INCLUSIVE OF 2 BLOCKS MULTI-LEVEL 16,100.00 COMPLETED
BHD. CARPARK AND COMMON FACILITIES AT PARCEL 17RM2,
PRECINT 17, PUTRAJAYA
CADANGAN MEROBOH DAN MEMBINA SEMULA
PERINDUSTRIAN YANG MENGANDUNGI:- i. 1 UNIT GUDANG
SESEBUAH 2 TINGKAT BESERTA PEJABAT 3 TINGKAT DAN
TEMPAT LETAK KENDERAAN BERBUMBUNG DI ARAS
BUMBUNG ii. 2 UNIT PONDOK PENGAWAL iii. 1 UNIT
JEKS Engineering
PENCAWANG ELEKTRIK iv. 1 UNIT KEBUK SAMPAH v. 1 UNIT 88,486.00 COMPLETED
SDN. BHD.
RUMAH PAM vi. 5 UNIT PONDOK REHAT DI ATAS LOT DW1 &
DW2 (SEBAHAGIAN PTD2423), JALAN TANJUNG A/2,
PELABUHAN TANJUNG PELEPAS, MUKIM TANJUNG KUPANG,
DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM UNTUK
TETUAN PALI PTP SDN BHD.
CADANGAN PEMBANGUNAN 3 BLOK PANGSAPURI SERVIS 21
Pembenaan Leow
TINGKAT, 26 TINGKAT DAN 32 TINGKAT (330 UNIT) DENGAN
Tuck Chui & Sons
5 TINGKAT PODIUM TEMPAT LETAK KERETA DI ATAS LOT 33,865.61 COMPLETED
Sdn. Bhd.
9162 & 9164, JALAN GENTING KELANG, MUKIM SETAPAK
KUALA LUMPUR

SG. BESI
PROPOSED DEVELOPMENT OF DECATHLON RETAIL STORE AT
CONSTRUCTION &
LOT PT 47, PRESINT 4.4, JALAN IKHTISAS 14/1, SEKSYEN 14, 42,200.00 COMPLETED
ENGINEERING SDN.
40000 SHAH ALAM, SELANGOR DARUL EHSAN.
BHD.

Page 1 of 5
STAR ROLLING SHUTTER SDN. BHD. (49611-W)

LIST OF PROJECT FOR YEAR 2018

ORIGINAL
CLIENT COMPANY
PROJECT TITLE CONTRACT STATUS
NAME
SUM (RM)
CADANGAN PEMBANGUNAN 1 BLOK BANGUNAN (41
TINGKAT) YANG MENGANDUNGI: I) 2 TINGKAT BASEMEN
TEMPAT LETAK KERETA II) 3 UNIT LOT KOMERSIAL DI ARAS
BAWAH; III) 5 TINGKAT PODIUM TEMPAT LETAK KERETA DI
ARAS 1 HINGGA ARAS 5; IV) 1 ARAS KEMUDAHAN DI ARAS 6;
ACCORD V) BLOK A, B DAN C PANGSAPURI PERKHIDMATAN (654 UNT)
CONSTRUCTION SDN. DI ARAS 7 HINGGA 40; VI) 8 TINGKAT SUITE PEJABAT (75 46,715.00 COMPLETED
BHD. UNIT) DI ARAS 7 HINGGA 14; VII) SEBUAH PENCAWANG
ELEKTRIK (DALAM BANGUNAN) DI ATAS LOT 2504, LOT
50536 & SEBAHAGIAN TANAH KERAJAAN, MUKIM KUALA
LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR UNTUK
TETUAN EUPE BANGSAR SOUTH DEVELOPMENT (JV) SDN.
BHD.
CADANGAN PEMBANGUNAN PERUMAHAN 'GUARDED &
GATED COMMUNITY' DIBAWAH SEKSYEN 61(A), AKTA
HAKMILIK STRATA 1985 (AKTA 318) FASA 1 YANG
Modular MENGANDUNGI 2 BLOK 606 UNIT KONDOMINIUM JENIS A,
Construction A1, B, B1, C & C1 - 42 TINGKAT, TEMPAT LETAK KERETA ARAS
89,756.00 COMPLETED
Technology Sdn Bhd SUB-BESMEN - 2 TINGKAT DI ATAS LOT PT 49801,
(MCT) PERSIARAN SEMARAK API, CYBER 11, CYBERJAYA, MUKIM
DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN
UNTUK TETUAN LAKEFRONT RESIDENCE SDN BHD -
LAKEFRONT RESIDENCE @ CYBERJAYA, PHASE 1
CADANGAN MEMBINA BANGUNAN PUSAT SERVIS KERETA
YANG MENGANDUNGI: 1-RUANG SERVIS 1 TINGKAT, 2-
AMD Construction
RUANG PEJABAT 2 TINGKAT DI ATAS PT 7420, JALAN 75,000.00 COMPLETED
Sdn Bhd
KIMCHUAN, PEKAN PANDAMARAN (KS5), DAERAH KLANG,
KLANG BANDAR DIRAJA, SELANGOR
CADANGAN UBAHSUAI DAN PINDAAN DALAMAN 2 LOT
KEDAI SEDIADA KEPADA 8 LOT KEDAI DAN 4 LOT KIOSK
Tall Innovations Sdn SERTA ESKALATOR DI DALAM BANGUNAN KOMPLEKS
115,141.00 COMPLETED
Bhd MEMBELI-BELAH 'EAST COAST MALL' DI ATAS SEBAHAGIAN
LOT 420, JALAN PUTRA SQUARE 6, PUTRA SQUARE, 25200
KUANTAN, PAHANG DARUL MAKMUR
CADANGAN MEMBINA 18 UNIT BANGUNAN INDUSTRI 3
TINGKAT (17 JENIS A DAN 1 JENIS A1) DAN 18 UNIT
BANGUNAN INDUSTRI 3 TINGKAT DENGAN 1 TINGKAT ARAS
BAWAH (JENIS B) BERSERTA 1 UNIT PONDOK PEGAWAI DI
Ireka Engineering &
ATAS LOT 1084, PT 37823 DAN PT 37824, JALAN BUKIT 120,000.00 COMPLETED
Construction Sdn Bhd
ANGKAT, KIDAMAI INDUSTRI PARK, MUKIM KAJANG,
DAERAH HULU LANGAT, SELANGOR DARUL EHSAN (PHASE 1)
UNTUK TETUAN IREKA ENGINEERING & CONSTRUCTION SDN
BHD.

Page 2 of 5
STAR ROLLING SHUTTER SDN. BHD. (49611-W)

LIST OF PROJECT FOR YEAR 2018

ORIGINAL
CLIENT COMPANY
PROJECT TITLE CONTRACT STATUS
NAME
SUM (RM

BUILDING AND EXTERNAL WORKS FOR PROPOSED 2 STOREY


WAREHOUSE AND 1 STOREY PRODUCTION FLOOR
EXTENSION WITH A SUB-BASEMENT WAREHOUSE AND 1
SIAB (M) SB STOREY COOLER WAREHOUSE AT PROPOSED INTERIM 422,275.00 COMPLETED
CARPARK ON LOT 61713 & 64714, SEKSYEN 26, 40400 SHAH
ALAM SELANGOR DARUL EHSAN FOR F&N BEVERAGES
MANUFACTURING SDN. BHD.
CADANGAN PENYIAPAN BAKI KERJA BAGI CADANGAN
MEMBINA SEBUAH BANGUNAN PASAR 6 TINGKAT
MENGANDUNGI: 1) 1 TINGKAT SEPARA BASEMEN, 2) 3
Eurowide TINGKAT PASAR (60 UNIT GERAI BASAH, 56 UNIT GERAI
249,622.00 COMPLETED
Construction SB KERING, 19 UNIT KIOSK DAN 79 UNIT GERAI MAKAN), 3) 3
TINGKAT TEMPAT LETAK KERETA, DI ATAS LOT NO.2, JALAN
MEWAH 25/63, SEKSYEN 25, SHAH ALAM, UNTUK MAJLIS
BANDARAYA SHAH ALAM.
CADANGAN PENDIRIAN BANGUNAN INDUSTRI YANG
BERIKUT : A) 1 BLOK KILANG 1 TINGKAT DENGAN PEJABAT 2
TINGKAT, B) 1 BLOK KILANG 1 TINGKAT, C) 2 BLOK ASRAMA
PEKERJA 2 TINGKAT, D) 1 UNIT RUANG MAKAN 1 TINGKAT,
Gamuda Engineering E) 1 UNIT BANGUNAN UTILITI 1 TINGKAT, F) 1 UNIT
328,432.00 COMPLETED
SB PENCAWANG ELEKTRIK 1 TINGKAT, G) 3 UNIT PONDOK
PENGAWAL, H) 3 UNIT KEBUK SAMPAH, DI ATAS LOT 66100,
MAHKOTA INDUSTRIAL PARK, MUKIM TANJONG DUA BELAS,
DAERAH KUALA LANGAT, SELANGOR DARUL EHSAN, UNTUK
TETUAN GAMUDA INDUSTRIAL BUILDING SYSTEM SDN BHD
CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN BARU
BUILD LAND BENGKEL KEJURUTERAAN MEKANIKAL DAN PEMBUATAN
TECHNOLOGY SDN DAN LAIN-LAIN KEMUDAHAN DI KOLEJ VOKASIONAL SHAH 51,504.00 COMPLETED
BHD ALAM, SELANGOR (PROGRAM CONVERSION SMV KE KOLEJ
VOKASIONAL 7 KOLEJ RINTIS)
YWS BUILDERS SDN CADANGAN PEMBANGUNAN 1 BLOK PERDAGANGAN 8
BHD @ JKQS TINGKAT DENGAN 1 TINGKAT BASEMEN M&E DI ATAS LOT
598,424.00 COMPLETED
CONSULTANCY SDN 445, LOT 446, LOT 447 DAN LOT 448. SEKSYEN 46, CHOW
BHD KIT, KUALA LUMPUR
MAPEI MALAYSIA PHASE 2 - WAREHOUSE BUILDING AND
EXTERNAL WORKS CADANGAN TAMBAHAN 1 BLOK GUDANG
SQA Builders Sdn 1 TINGKAT DAN 1 BLOK BENGKEL 1 TINGKAT KEPADA
39,124.00 COMPLETED
Bhd. KILANG SEDIA ADA DIATAS LOT 754, LENGKOK EMAS 1,
KAWASAN PERINDUSTRIAN NILAI, PEKAN NILAI, DAERAH
SEREMBAN, 71800 NEGERI SEMBILAN DARUL KHUSUS

Page 3 of 5
STAR ROLLING SHUTTER SDN. BHD. (49611-W)

LIST OF PROJECT FOR YEAR 2018

ORIGINAL
CLIENT COMPANY
PROJECT TITLE CONTRACT STATUS
NAME
SUM (RM

CADANGAN MEMBINA PEJABAT PENGURUSAN,PUSAT


PENYIMPANAN DAN PENGEDARAN ALAT GANTI KENDERAAN
YANG MENGANDUNGI i) 1 UNIT PEJABAT PENGURUSAN (2
TINGKAT) ii) 2 UNIT PUSAT PENYIMPANAN & PENGEDARAN
Alpha Galaxy Sdn.
(1 TINGKAT) iii) 1 UNIT BLOK FASILITI PEKERJA (1 TINGKAT) 257,116.00 COMPLETED
Bhd.
iv) 1 UNIT PONDOK PENGAWAL v) 1 UNIT KEBUK SAMPAH vi)
1 UNIT PENCAWANG ELEKTRIK DI ATAS LOT PT 25954 ,
MUKIM IJOK DAERAH KUALA SELANGOR UNTUK ALPHA
GALAXY SDN BHD

PUSAT PEMINDAHAN SISA PEPEJAL, TAMAN BERINGIN -


Alam Flora Sdn. Bhd. 141,540.00 COMPLETED
KUALA LUMPUR.

CADANGAN MEMBINA DAN MENYIAPKAN 33 UNIT KEDAI


PEJABAT (29 UNIT - 2 TINGKAT & 4 UNIT 3 TINGKAT) FASA
Aik Bee Construction 6C3, ALAM DAMAI, MUKIM PETALING, WILAYAH
115,895.86 COMPLETED
SB PERSEKUTUAN KUALA LUMPUR UNTUK TETUAN SYARIKAT
PERUMAHAN PEGAWAI KERAJAAN SDN BHD (Alam Damai
Cheras Phase 6c3 Cheras)
CADANGAN MEREKABENTUK, MEMBINA DAN MENYIAPKAN
Perbadanan Perwira KEM REJIMEN ARTILERI DI RAJA KE 31 (31 RAD) DI ATAS
Harta Malaysia SEBAHAGIAN LOT P.T 3047 MUKIM SEMENYIH, DAERAH 120,321.00 COMPLETED
(PPHM) HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN
KEMENTERIAN PERTAHANAN MALAYSIA

Pembinaan Mitrajaya A CENTRE OF EXCELLENT (ACE), LOT 44, SEKSYEN 51, KUALA
68,657.00 COMPLETED
Sdn Bhd LUMPUR (BANK NEGARA)

AME CONSTRUCTION
RHB-AXIS AEROTECH CENTER, SUBANG 29,000.00 COMPLETED
SDN. BHD.

CADANGAN MEMBINA 1 UNIT "FINISHED GOODS FACTORY"


(OH3 30m ORDINARY HAZARD), BESERTA 2 UNIT PEJABAT, 1
TSK CONSTRUCTION
UNIT POST PENGAWAL, TNB SUB-STATION, BANGUNAN 80,000.00 COMPLETED
SDN. BHD.
SAMPINGAN & WATER TANK DI ATAS SEBAHAGIAN LOT
P804, P806, P833 & P834, PORT KLANG FREE ZONE, MUKIM
KLANG, DAERAH KLANG, SELANGOR DARUL EHSAN

Page 4 of 5
STAR ROLLING SHUTTER SDN. BHD. (49611-W)

LIST OF PROJECT FOR YEAR 2018

ORIGINAL
CLIENT COMPANY
PROJECT TITLE CONTRACT STATUS
NAME
SUM (RM

CADANGAN MEMBINA BARU SEBUAH PUSAT GUDANG


LOGISTIK YANG MENGANDUNGI: i) 1 BLOK GUDANG 3
TINGKAT DENGAN PEJABAT DI TINGKAT MEZZANINE DAN 1
TINGKAT SUB-BASEMEN GUDANG DAN TEMPAT LETAK
KERETA. Ii) 2 UNIT PONDOK PENGAWAL. iii) 1 UNIT PEJABAT
AME CONSTRUCTION
KASTAM SATELITE & BANGUNAN-BANGUNAN UTILITI. DI 376,998.93 COMPLETED
SDN. BHD.
ATAS LOT 7716 (PN 97879) DAN LOT 7717 (HSM 2601 PT
7666), NO. 73 LORONG ENGGANG, HULU KELANG FTZ,
54200 KUALA LUMPUR, SEKSYEN 2, BANDAR HULU KELANG,
DAERAH GOMBAK, SELANGOR DARUL EHSAN. UNTUK
TETUAN AREA VENTURES SDN BHD
CADANGAN MEREKABENTUK, MEMBINA DAN MENYIAPKAN
Perbadanan Perwira KEM REJIMEN ARTILERI DI RAJA KE 31 (31 RAD) DI ATAS
Harta Malaysia SEBAHAGIAN LOT P.T 3047 MUKIM SEMENYIH, DAERAH 120,321.00 COMPLETED
(PPHM) HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN
KEMENTERIAN PERTAHANAN MALAYSIA

Pembinaan Mitrajaya A CENTRE OF EXCELLENT (ACE), LOT 44, SEKSYEN 51, KUALA
68,657.00 COMPLETED
Sdn Bhd LUMPUR (BANK NEGARA)

AME CONSTRUCTION
RHB-AXIS AEROTECH CENTER, SUBANG 29,000.00 COMPLETED
SDN. BHD.

CADANGAN MEMBINA 1 UNIT "FINISHED GOODS FACTORY"


(OH3 30m ORDINARY HAZARD), BESERTA 2 UNIT PEJABAT, 1
TSK CONSTRUCTION UNIT POST PENGAWAL, TNB SUB-STATION, BANGUNAN
80,000.00 COMPLETED
SB SAMPINGAN & WATER TANK DI ATAS SEBAHAGIAN LOT
P804, P806, P833 & P834, PORT KLANG FREE ZONE, MUKIM
KLANG, DAERAH KLANG, SELANGOR DARUL EHSAN
CADANGAN MEMBINA BARU SEBUAH PUSAT GUDANG
LOGISTIK YANG MENGANDUNGI: i) 1 BLOK GUDANG 3
TINGKAT DENGAN PEJABAT DI TINGKAT MEZZANINE DAN 1
TINGKAT SUB-BASEMEN GUDANG DAN TEMPAT LETAK
KERETA. Ii) 2 UNIT PONDOK PENGAWAL. iii) 1 UNIT PEJABAT
AME CONSTRUCTION
KASTAM SATELITE & BANGUNAN-BANGUNAN UTILITI. DI 376,998.93 COMPLETED
SDN. BHD.
ATAS LOT 7716 (PN 97879) DAN LOT 7717 (HSM 2601 PT
7666), NO. 73 LORONG ENGGANG, HULU KELANG FTZ,
54200 KUALA LUMPUR, SEKSYEN 2, BANDAR HULU KELANG,
DAERAH GOMBAK, SELANGOR DARUL EHSAN. UNTUK
TETUAN AREA VENTURES SDN BHD

Page 5 of 5
STAR ROLLING SHUTTER SDN. BHD. (49611-W)

LIST OF PROJECT FOR YEAR 2019

ORIGINAL
CLIENT COMPANY
PROJECT TITLE CONTRACT STATUS
NAME
SUM (RM)

MELAKA 2242 MW COMBINED CYCLE GAS TURBINE POWER


BGMC Corporation PLANT ON LOT 20263, 14803, 7001, 4695 & 4640, MUKIM
388,897.00 COMPLETED
Sdn Bhd OF SUNGEI BARU ILIR OF KUALA SUNGAI BARU, DISTRICT OF
ALOR GAJAH, MELAKA

PROPOSED CONSTRUCTION AND COMPLETION OF PHASE:


19 UNITS 3 STOREY SHOP OFFICE, 1 UNIT TNB SUBSTATION,
SRI BINARAYA SDN. INFRASTRUCTURE WORKS. PHASE 2: 20 UNITS 3 STOREY
69,186.00 COMPLETED
BHD. SHOP OFFICE DI ATAS LOT PT 49949, AIR HITAM, MUKIM
DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN
UNTUK TETUAN ABADI MAN NIEN SDN BHD

CADANGAN MEMBINA SEBUAH BANGUNAN INDUSTRI YANG


MENGANDUNGI GUDANG SIMPANAN RINGAN DAERAH
PALMA WIBAWA SB 117,328.54 COMPLETED
TANJUNG MALIM, PERAK DARUL RIDZUAN, ADIENT
TANJUNG MALIM

THE PROPOSED CONSTRUCTION AND COMPLETION OF IMT-


GT PLAZA ON LOT PT 3873 & LOT PT 3874 IN BUKIT BUNGA,
Blackfox Engineering
MUKIM NIBONG, JAJAHAN TANAH MERAH KELANTAN 187,000.00 COMPLETED
SB
DARUL NAIM FOR THE EAST COAST ECONOMIC REGION
DEVELOPMENT COUNCIL (ECERDC)
CADANGAN PERMOHONAN PELAN BANGUNAN DI BAWAH
AKTA 133 BAGI TUJUAN CADANGAN MENDIRIKAN, 1 UNIT
KILANG 1 TINGKAT BESERTA PEJABAT 2 TINGKAT, 2 UNIT
TANGKI MINYAK KAPASITI 500MT, 4 UNIT TANGKI MINYAK
KAPASITI 150MT, 4 UNIT TANGKI MINYAK KAPASITI 100MT,
Wow Construction SB 1 UNIT PENCAWANG ELEKTRIK (TNB), 1 UNIT PONDOK 134,081.00 COMPLETED
PENGAWAL, 1 UNIT KEBUK SAMPAH, DI ATAS PTD 22448,
JALAN PLATINUM 4, KAWASAN PERINDUSTRIAN PASIR
GUDANG, ZON 12B, MUKIM PLENTONG DAERAH JOHOR
BAHRU, JOHOR DARUL TA'ZIM, UNTUK TETUAN AGRI OILS
PACKAGING SDN BHD.

TAYLOR WHARTON MALAYSIA BULK TANK EXPANSION, COMPLETED


JFE Engineering (M) 108,995.00
JALAN JANGUR 28/43, SHAH ALAM (PACKAGE 1)
Sdn Bhd

Page 1 of 8
STAR ROLLING SHUTTER SDN. BHD. (49611-W)

LIST OF PROJECT FOR YEAR 2019

ORIGINAL
CLIENT COMPANY
PROJECT TITLE CONTRACT STATUS
NAME
SUM (RM)

EARTHWORKS & MAIN BUILDING WORKS FOR THE DESIGN


AND BUILD OF THE PROPOSED COMMERCIAL
SUNWAY
DEVELOPMENT FOR PLOT F19 & F20 SUNWAY ISKANDAR AT
CONSTRUCTION SDN. 54,484.00 COMPLETED
PTD 200695 & 200696, MEDINI ZONE 5, MEDINI ISKANDAR
BHD.
MALAYSIA, MUKIM PULAI, DAERAH JOHOR BAHRU - D&B
COMMERCIAL DEVELOPMENT

CADANGAN PEMBANGUNAN INDUSTRI PRECINT 3A (120


UNIT) YANG MENGANDUNGI:- PACKAGE 1 A) 68 UNIT
KILANG KLUSTER 1 TINGKAT DAN PEJABAT DI TINGKAT ATAS
(JENIS B – 60’ X 130’) B) 24 UNIT KILANG KLUSTER 1 TINGKAT
PEMBINAAN ASIA
DENGAN TINGKAT MEZZANINE (JENIS C-60’ X 130’) C) 6 UNIT 566,812.00 COMPLETED
GEMBIRA SDN. BHD.
PENCAWANG ELEKTRIK JENIS DOUBLE CHAMBER D) 1 UNIT
PONDOK PENGAWAL UTAMA DI ATAS SEBAHAGIAN PT
10559 (HSD 5723), MUKIM IJOK, DAERAH KUALA SELANGOR,
SELANGOR DARUL EHSAN.

PROPOSED MAIN BUIDLING WORKS FOR CADANGAN


PEMBANGUNAN INDUSTRI (EBPV) PRECINT 3A (120 UNIT)
YANG MENGANDUNGI:- PACKAGE 1 A. 68 UNIT KILANG
KLUSTER 1 TINGKAT DAN PEJABAT DI TINGKAT ATAS (JENIS B
- 60' X 130') B. 24 UNIT KILANG KLUSTER 1 TINGKAT DENGAN
TINGKAT MEZZANINE (JENIS C - 60' X 130') C. 6 UNIT
S.S.T. PENCAWANG ELEKTRIK JENIS DOUBLE CHAMBER D. 1 UNIT
CONSTRUCTION SDN PONDOK PENGAWAL UTAMA PACKAGE 2 A. 28 UNIT KILANG 212,800.00 COMPLETED
BHD. BERKEMBAR 1 TINGKAT DAN PEJABAT 2 TINGKAT (JENIS D -
80' X 200') B. 3 UNIT PENCAWANG ELEKTRIK JENIS DOUBLE
CHAMBER C. 1 UNIT STESEN SUIS UTAMA (SSU) D. 1 UNIT
BILIK MDF E. 1 UNIT GAZEBO DI ATAS SEBAHAGIAN PT 10559
(HSD 5723), MUKIM IJOK, DAERAH KUALA SELANGOR,
SELANGOR DARUL EHSAN FOR TETUAN PARAGON PINNACLE
SDN BHD - PACKAGE 2

PROPOSED INTERIOR WORKS AT LULU HYPERMARKET,


DECO STYLE SDN BHD SHAMELIN MALL KUALA LUMPUR FOR LULU GROUP 82,635.00 COMPLETED
INTERNATIONAL

PEMBINAAN THE CONSTRUCTION AND COMPLETION OF ASIA SCHOOL OF


82,185.00 COMPLETED
MITRAJAYA SDN BHD BUSSINESS (ASB) ACADEMIC BUILDING

Page 2 of 8
STAR ROLLING SHUTTER SDN. BHD. (49611-W)

LIST OF PROJECT FOR YEAR 2019

ORIGINAL
CLIENT COMPANY
PROJECT TITLE CONTRACT STATUS
NAME
SUM (RM)

CADANGAN PEMBANGUNAN PUSAT TERMINAL


PENGANGKUTAN BERSEPADU SEKTOR TIMUR YANG
MENGANDUNGI:- 1) SEBUAH BANGUNAN TERMINAL 7
TINGKAT 2) 1 UNIT BANGUNAN REHAT PEMANDU 1
TINGKAT 3) 1 UNIT BANGUNAN PEMERIKSAAN 1 TINGKAT 4)
LANDASAN KAPITAL 1 UNIT BANGUNAN UTILITI PUSAT BERSEPADU 2 TINGKAT 5)
1,656,560.00 ON-GOING
(M) SDN. BHD. 1 UNIT KEBUK SAMPAH 1 TINGKAT 6) 1 UNIT BANGUNAN
KOMERSIAL 4 TINGKAT DI ATAS TANAH KERAJAAN PLOT A
DAN PLOT B, TERMINAL PUTRA MELATI, LEBUHRAYA
LINGKARAN TENGAH 2 (MRR2), MUKIM SETAPAK, DAERAH
GOMBAK, SELANGOR DARUL EHSAN UNTUK KEMENTERIAN
PENGANGKUTAN MALAYSIA.

CONSTRUCTION AND COMPLETION OF 20 UNITS OF SHOP


OFFICE COMPRISING OF 4 UNIT TYPE A (29' X 70'), 16 UNIT
TYPE B (22' X 70') PHASE HT4 AND 1 UNIT TNB SUB-STATION
Hasil Construction
ON LOT PT 35919 - LOT PT 35938 AND LOT PT 35939, JALAN 99,188.00 COMPLETED
Sdn Bhd
PERSIARAN PUTRA MEGAH, PUTRA HEIGHTS, MUKIM
DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN
FOR MESSRS SIME DARBY USJ DEVELOPMENT SDN BHD
CADANGAN PEMBANGUNAN 1 BLOK PANGSAPURI MAMPU
MILIK 33 TINGKAT (600 UNIT) DAN 2 BLOK PANGSAPURI 33
TINGKAT (1400 UNIT) DENGAN 5 TINGKAT PODIUM TEMPAT
Pembenaan Leow
LETAK KERETA BESERTA 1 TINGKAT TEMPAT LETAK KERETA
Tuck Chui & Sons Sdn 79,124.60 COMPLETED
SEPARA TANAH, DI ATAS HSD 119968 PT 9929 (DAHULUNYA
Bhd
HSD 118654 PT9588) BERSEBELAHAN LEBUHRAYA DUTA -
ULU KELANG (DUKE), MUKIM SETAPAK, DAERAH KUALA
LUMPUR

George Kent TAMBAHAN BLOK BARU, HOSPITAL PUTRAJAYA (REKA DAN


58,000.00 COMPLETED
(Malaysia) Berhad BINA)

RENOVATION WORKS FOR THE CARGO WAREHOUSE


TBTC Construction & MEASURING 93269 SQUARE FEET AT LOT NO. PT 26, JALAN
290,102.45 COMPLETED
Engineering Sdn Bhd KLIA S3, KUALA LUMPUR INTERNATIONAL AIRPORT, 64000
KLIA, SELANGOR DARUL EHSAN
CADANGAN PEMBANGUNAN 1 BLOK PEMBANGUNAN DI
ATAS PT 1361 SELUAS 6.49 EKAR (PARCEL RC1) SEBAHAGIAN
Sunway Construction LOT DAHULU PN 81532, LOT 62639, SUNWAY SOUTH QUAY,
53,283.75 COMPLETED
Sdn. Bhd BANDAR SUNWAY, MUKIM DAMANSARA, DAERAH
PETALING, SELANGOR DARUL EHSAN UNTUK SUNWAY
SOUTH QUAY SDN BHD

Page 3 of 8
STAR ROLLING SHUTTER SDN. BHD. (49611-W)

LIST OF PROJECT FOR YEAR 2019

ORIGINAL
CLIENT COMPANY
PROJECT TITLE CONTRACT STATUS
NAME
SUM (RM)

CADANGAN PEMBANGUNAN KOMERSIAL: PLOT 1-I. FASA


1A: 1 BLOK PANGSAPURI PERKHIDMATAN (KEDIAMAN) 46
TINGKAT (452 UNIT) DI ATAS 7 TINGKAT PODIUM TEMPAT
LETAK KENDERAAN BESERTA KEMUDAHANNYA DAN 1
Sunway Construction
TINGKAT SEPARA BESMEN TEMPAT LETAK KENDERAAN II. 94,000.00 COMPLETED
Sdn. Bhd.
FASA 1B: 1 BLOK PANGSAPURI SERVIS (KEDIAMAN) 45
TINGKAT (442 UNIT); DI ATAS LOT 72241 DAN LOT PT194,
JALAN SS8/2, KELANA JAYA, MUKIM BANDAR PETALING
JAYA, DAERAH PETALING, SELANGOR DARUL EHSAN.

CADANGAN PEMBANGUNAN PERUMAHAN "GUARDED AND


GATED COMMUNITY" DI BAWAH SEKSYEN 6(1A), AKTA
HAKMILIK STRATA 1985 (AKTA 318) FASA 1 YANG
MENGANDUNGI:- A. 4 BLOK - 1932 UNIT PANGSAPURI
MAMPU MILIK RUMAH SELANGORKU JENIS C1 - TINGKAT 22,
Modular
B. TEMPAT LETAK KERETA - 4 TINGKAT, C. SEBUAH SURAU - 2
Construction
TINGKAT, D. SEBUAH PUSAT KOMUNITI YANG 38,158.00 COMPLETED
Technology Sdn Bhd
MENGANDUNGI i. DEWAN SERBAGUNA - 1 TINGKAT, ii) 12
(MCT)
UNIT KEDAI "RETAIL" - 1 TINGKAT, iii) TADIKA - 1 TINGKAT,
iv) TASKA - 1 TINGKAT. DI ATAS SEBAHAGIAN LOT PT 49803,
PERSIARAN SEPANG, CYBER 11 CYBERJAYA, MUKIM
DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN
UNTUK TETUAN LAKEFRONT RESIDENCE SDN. BHD.

PROPOSED DEVELOPMENT OF CYBERJAYA HOSPITAL (288


BEDS) ON LOT 47686 AND H.S.(D) 28779 PT 41461 AT
Gadang Engineering
PERSIARAN MULTIMEDIA CYBER 11, CYBERJAYA, MUKIM 218,880.00 COMPLETED
(M) Sdn Bhd
DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN
("DESIGN & BUILD")

CADANGAN TAMBAHAN SATU BLOK BANGUNAN 2 TINGKAT


"WASTE & MAINTENANCE" KEPADA PEMBANGUNAN
INDUSTRI PENGELUARAN "ADHESIVE" SEDIA ADA YANG
MENGANDUNGI KILANG / GUDANG / PEJABAT, PELBAGAI
BANGUNAN / STRUKTUR UTILITI SEPERTI PENCAWANG
SQA Builders Sdn
ELEKTRIK, BANGUNAN ELEKTRIK, TANGKI KONKRIT BAWAH 25,707.00 COMPLETED
Bhd.
TANAH, TANGKI AIR, TANGKI BOMBA, KEBUK SAMPAH DAN
PONDOK PENGAWAL DI ATAS PT 856 HSD 219743,
KAWASAN PERINDUSTRIAN TECHPARK @ENSTEK, BANDAR
ENSTEK, MUKIM LABU, DAERAH SEREMBAN, NEGERI
SEMBILAN UNTUK TETUAN JOWAT MANUFACTURING (SEA)
SDN BHD
Page 4 of 8
STAR ROLLING SHUTTER SDN. BHD. (49611-W)

LIST OF PROJECT FOR YEAR 2019

ORIGINAL
CLIENT COMPANY
PROJECT TITLE CONTRACT STATUS
NAME
SUM (RM)

CADANGAN TAMBAHAN SATU BLOK BANGUNAN 2 TINGKAT


"WASTE & MAINTENANCE" KEPADA PEMBANGUNAN
INDUSTRI PENGELUARAN "ADHESIVE" SEDIA ADA YANG
MENGANDUNGI KILANG / GUDANG / PEJABAT, PELBAGAI
BANGUNAN / STRUKTUR UTILITI SEPERTI PENCAWANG
SQA Builders Sdn ELEKTRIK, BANGUNAN ELEKTRIK, TANGKI KONKRIT BAWAH
25,707.00 COMPLETED
Bhd. TANAH, TANGKI AIR, TANGKI BOMBA, KEBUK SAMPAH DAN
PONDOK PENGAWAL DI ATAS PT 856 HSD 219743,
KAWASAN PERINDUSTRIAN TECHPARK @ENSTEK, BANDAR
ENSTEK, MUKIM LABU, DAERAH SEREMBAN, NEGERI
SEMBILAN UNTUK TETUAN JOWAT MANUFACTURING (SEA)
SDN BHD

CADANGAN PEMBANGUNAN BERCAMPUR YANG


MENGANDUNGI 832 UNIT APARTMENT DARI TINGKAT 11
HINGGA TINGKAT 38, 1 TINGKAT TEMPAT LETAK KERETA DI
TINGKAT BAWAH RENDAH DENGAN KEMUDAHAN
PASARAYA/KEDAI, 3 TINGKAT KEDAI DARI TINGKAT BAWAH
HINGGA TINGKAT 2, 7 TINGKAT PODIUM TEMPAT LETAK
Metbuild Sdn Bhd KERETA DARI TINGKAT 3 HINGGA TINGKAT 9, 1 TINGKAT 555,056.00 COMPLETED
KEMUDAHAN KELAB, SURAU, DEWAN, KOLAM RENANG DI
TINGKAT 10, 2 TINGKAT BESMEN TEMPAT LETAK KERETA, DI
ATAS LOT 37890, JALAN RADIN ANUM 1, BANDAR BARU SRI
PETALING, MUKIM KUALA LUMPUR, WILAYAH
PERSEKUTUAN UNTUK TETUAN PINNACLE HOMES SP SDN.
BHD.

THE PROPOSED SETIA CITY MALL PHASE 2 RETAIL


Lim Hoo Seng - DEVELOPMENT AT NO.7, PERSIARAN SETIA DAGANG,
Gamuda Engineering BANDAR SETIA ALAM, SEKSYEN U13, 40170 SHAH ALAM, 681,000.00 COMPLETED
(SCM) Joint Venture SELANGOR DARUL EHSAN FOR GREENHILL RESOURCES SDN
BHD
CONSTRUCTION AND COMPLETION OF ASIA SCHOOL
Pembinaan Mitrajaya
BUSSINESS (ASB) RESIDENTIAL BUILDINGS ("MAIN 10,955.00 COMPLETED
Sdn Bhd
CONTRACT")
PROPOSED ARCHITECTURE & INTERIOR DESIGN WORKS FOR
CORPORATE IDENTITY (C.I.) COMPLIANCE FOR BMW, MINI &
BMW MOTORRAD 3S SHOWROOM LOCATED AT BLOCK 1,
GSIB Sdn Bhd 339,697.00 COMPLETED
LOT PT 35596 (HSD 296142) JALAN PJU 1A/7, MUKIM
DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN,
FOR MESSRS HYUNDAI-SIME DARBY MOTORS SDN. BHD.

Page 5 of 8
STAR ROLLING SHUTTER SDN. BHD. (49611-W)

LIST OF PROJECT FOR YEAR 2019

ORIGINAL
CLIENT COMPANY
PROJECT TITLE CONTRACT STATUS
NAME
SUM (RM)

BUILD LAND CADANGAN MENAIKTARAF, SEKOLAH MENENGAH


TECHNOLOGY SDN VOKASIONAL TENGKU AMPUAN AFZAN KEPADA KOLEJ 109,011.00 COMPLETED
BHD VOKASIONAL TENGKU AMPUAN AFZAN, PAHANG
Binastra Construction
The Millerz @ OKR (PPU Building), Jalan Kelang Lama 35,383.00 COMPLETED
(M) Sdn Bhd
CADANGAN MEMBINA SEBUAH PUSAT PERNIAGAAN 2 1/2
TINGKAT DAN 2 UNIT RUMAH SAMPAH DI ATAS
Superb Construction
SEBAHAGIAN LOT PT 10629, DESA COALFIELD, MUKIM IJOK, 650,000.00 COMPLETED
& Trading Sdn Bhd
DAERAH KUALA SELANGOR, SELANGOR, DARUL EHSAN
UNTUK TETUAN SENZ YANG REALTY SDN BHD.
PERMOHONAN KELULUSAN PELAN BANGUNAN BAGI
CADANGAN MEMBINA HUB PEMBANGUNAN KEMAHIRAN
JOHOR (SKILL HUB) YANG MENGANDUNGI 1. 1 BLOK
BANGUNAN PENTADBIRAN - 2 TINGKAT 2. 1 BLOK
BANGUNAN PERHOTELAN, PELANCONGAN DAN ANNEX - 3
TINGKAT 3. 1 BLOK BANGUNAN PUSAT KESIHATAN, PUSAT
SUMBER MAKMAL IT DAN PERPUSTAKAAN - 3 TINGKAT 4. 1
BLOK BANGUNAN KOLEJ VOKASIONAL - 1 TINGKAT 5. 1 BLOK
BANGUNAN DEWAN SERBAGUNA DAN AUDITORIUM - 1
TINGKAT 6. 1 BLOK BANGUNAN BIO TEKNOLOGI, KAFE DAN
Niaga Sari Sdn Bhd KOPERASI - 1 TINGKAT SETENGAH 7. 1 BLOK BANGUNAN 87,566.00 COMPLETED
LOGISTIK - 1 TINGKAT 8. 1 UNIT STP 9. 1 UNIT SURAU 10. 1
UNIT TEMPAT DUDUK BERBUMBUNG 11. 1 UNIT
GELANGGANG BOLA SEPAK 12. 2 BLOK BANGUNAN OIL &
GAS - 1 TINGKAT 13. 1 BLOK BANGUNAN SETOR KIMIA 14. 2
UNIT PONDOK PENGAWAL 15. 1 UNIT BANGUNAN TNB 16. 1
UNIT BANGUNAN GENSET 17. 1 UNIT BANGUNAN KEBUK
SAMPAH 18. 1 UNIT TANGKI AIR DAN 19. 2 UNIT KOLAM
TADAHAN DI ATAS SEBAHAGIAN LOT 10200 HS (D) 29625,
MUKIM ULU SUNGAI JOHOR, DAERAH KOTA TINGGI, JOHOR
DARUL TAKZIM. UNTUK TETUAN YPJ PLANTATIONS SDN BHD
MAIN BUILDING WORKS FOR CADANGAN PEMBANGUNAN
BERCAMPUR (BERSTRATA) YANG MENGANDUNGI ,FASA 1-
1)3 BLOK KONDOMINIUM MAMPU MILIK (1905 UNIT) a)
BLOK A-43 TINGKAT (ARAS 9-ARAS 51) , b)BLOK B-43
TINGKAT (ARAS 9-ARAS 51) , c) Block C - 43 TINGKAT (ARAS
9-ARAS51) , 2) 8 TINGKAT TEMPAT LETAK KERETA PODIUM ,
Sri Binaraya Sdn Bhd 47,351.00 ON-GOING
3) RUANG KEMUDAHAN DI ARAS BAWAH , ARAS 8 DAN
ARAS 52 ,4) 1 UNIT PONDOK PENGAWAL , 5) 1 UNIT PPU , 6)
2 INIT SSU , DIATAS SEBAHAGIAN LOT 29787 (LOT ASAL
PT28372) JALAN USAHAWAN 6 , AIR PANAS, MUKIM
SETAPAK , WILAYAH PERSEKUTUAN KUALA LUMPUR FOR
MESSRS , SKYWORLD DEVELOPMENT SDN BHD

Page 6 of 8
STAR ROLLING SHUTTER SDN. BHD. (49611-W)

LIST OF PROJECT FOR YEAR 2019

ORIGINAL
CLIENT COMPANY
PROJECT TITLE CONTRACT STATUS
NAME
SUM (RM)

CADANGAN MEMBINA DAN MENDIRIKAN SEBUAH KILANG


''HIGH TENSILE STRENGTH STAMPING" SATU TINGKAT
BESERTA PEJABAT DI TINGKAT MEZANIN YANG
MENGANDUNGI : i) 2 UNIT PONDOK PENGAWAL ii) 1 UNIT
PENCAWANG ELEKTRIK iii) 1 UNIT RUMAH SAMPAH iv) DAN
Bina Jurati Sdn Bhd 71,755.00 COMPLETED
LAIN-LAIN KEMUDAHAN YANG BERKAITAN DI ATAS
SEBAHAGIAN LOT PT16027, SEKSYEN 20, MUKIM BANDAR
SERENDAH, DAERAH HULU SELANGOR, SELANGOR DARUL
EHSAN UNTUK TETUAN PERODUA MANUFACTURING SDN
BHD (PACKAGE 2)
Ceylon Builders Sdn
JALAN AMPANG BOUTIQUE HOTEL, KL 327,893.00 COMPLETED
Bhd
NADI CERGAS SDN. CADANGAN PEMBINAAN PUSAT KARDIOLOGI HOSPITAL
118,537.00 ON-GOING
BHD. SERDANG, SELANGOR (262 KATIL) (REKA DAN BINA).
PROPOSED ARCHITECTURE & INTERIOR DESIGN WORKS FOR
CORPORATE IDENTITY (C.I) COMPLIANCE FOR HYUNDAI 3S
Ruang Idea Kreatif SHOWROOM LOCATED AT BLOCK 3, LOT PT 35596 (HSD),
92,110.00 COMPLETED
Sdn Bhd JALAN PJU 1A/7, MUKIM DAMANSARA, DAERAH PETALING,
SELANGOR DARUL EHSAN FOR MESSRS HYUNDAI - SIME
DARBY MOTORS SDN BHD
CADANGAN MENBINA SEBUAH PUSAT PERNIAGAAN YANG
MEGANDUNGI : FASA 1: 3 BLOCK PANGSAPURI
PERKHIDMATAN 914 UNIT : BLOK A-426 UNIT PANGSAPURI
46 TINGKAT,BLOK B-274 UNIT PANGSAPURI 38
TINGKAT,BLOK C-214 UNIT PANGSAPURI 31 TINGKAT
SETIA PRECAST SDN.
BERSERTA 1 TINGKAT KEMUDAHAN DI TINGKAT 8 YANG 44,000.00 ON-GOING
BHD.
MEGANDUNGI KOLAM RENANG,DEWAN
SERBAGUNA,GIMNASIUM,RUANG SOLAT DAN LAIN-LAIN
KEMUDAHAN TERMASUK PODIUM LETAK KERETA 8 TINGKAT
DI ATAS LOT 82623,JALAN LANGKAT KS6,BUKIY TINGGI 1
,MUKIM KLANG TETUAN GANDA ANGGUN SDN BHD

Deco Style Sdn Bhd LULU HYPERMARKET SETIA CITY MALL 2, SHAH ALAM 128,617.00 COMPLETED

CADANGAN PEMBINAAN SEBUAH BANGUNAN KILANG


'DYNAMIC INSPECTION' 1 TINGKAT BESERTA PONDOK
PENGAWAL DAN KEMUDAHAN YANG BERKAITAN DI ATAS
BINA JURATI SDN
SEBAHAGIAN LOT 29139, SEKSYEN 20, MUKIM BANDAR 64,809.00 COMPLETED
BHD
SERENDAH, DAERAH HULU SELANGOR, SELANGOR DARUL
EHSAN UNTUK TETUAN PERODUA MANUFACTURING SDN
BHD

Page 7 of 8
STAR ROLLING SHUTTER SDN. BHD. (49611-W)

LIST OF PROJECT FOR YEAR 2019

ORIGINAL
CLIENT COMPANY
PROJECT TITLE CONTRACT STATUS
NAME
SUM (RM)

CADANGAN PEMBANGUNAN 2,400 UNIT RUMAWIP (46


TINGKAT) YANG MENGANDUNGI:- BLOCK A DAN E (38
TINGKAT), - BLOCK B (36 TINGKAT), - BLOCK C (37 TINGKAT),
BLOCK D (39 TINGKAT), - KEMUDAHAN PENDUDUK (1
WIRA SYUKUR (M)
TINGKAT), - LOBI DAN PODIUM TEMPAT LETAK KERETA (6 66,431.00 ON-GOING
SDN BHD
TINGKAT) BESERTA 2 ARAS SUB BESMEN DI ATAS LOT 8947
& 8948, JALAN GOMBAK, MUKIM SETAPAK, WILAYAH
PERSEKUTUAN KUALA LUMPUR FOR TETUAN HEKTAR ANEKA
SDN. BHD.
CADANGAN PEMBANGUNAN YANG MENGANDUNGI 1 BLOK
PANGSAPURI BERSERVIS 23 TINGKAT (259 UNIT) DAN 22
TINGKAT (170 UNIT), 1 BLOK PEJABAT 23 TINGKAT, 5
TINGKAT PODIUM PUSAT MEMBELI BELAH BESERTA
Saujana Beta Sdn. KEMUDAHAN, 1 TINGKAT SEPARA BASEMEN PUSAT
310,000.00 COMPLETED
Bhd. MEMBELI BELAH DAN TEMPAT LETAK KERETA DAN 4
TINGKAT BASEMEN TEMPAT LETAK KERETA DI ATAS LOT
48057 (PT9073), JALAN BUKIT KIARA 1, BUKIT KIARA, MUKIM
KUALA LUMPUR, WILAYAH PERSEKUTUAN UNTUK SIME
DARBY BRUNSFIELD RESORT SDN BHD.

MELAKA 2242 MW COMBINED CYCLE GAS TURBINE POWER


Hyundai Engineering PLANT ON LOT 20263, 14803, 7001, 4695 & 4640, MUKIM
417,686.00 COMPLETED
Sdn Bhd OF SUNGEI BARU ILIR OF KUALA SUNGAI BARU, DISTRICT OF
ALOR GAJAH, MELAKA

CADANGAN PEMBANGUNAN INDUSTRI SESEBUAH YANG


MENGANDUNGI: i) 1 UNIT GUDANG 1 TINGKAT (BLOK A); ii)
1 UNIT GUDANG DAN KILANG 2 TINGKAT DENGAN
BANGUNAN UTILITI (BLOK B); iii) 1 UNIT PEJABAT 6 TINGKAT
(BLOK C); iv) 1 UNIT PENCAWANG ELEKTRIK 33KV 2
TINGKAT; v) 2 UNIT PONDOK PENGAWAL & TEMPAT
AME CONSTRUCTION PEMANDU MENUNGGU; vi) 1 UNIT PEMBUANGAN SAMPAH
409,194.00 ON-GOING
SDN. BHD. 1 TINGKAT; vii) 1 UNIT BILIK GEN - SET 1 TINGKAT; viii) 1
UNIT BILIK PAM 1 TINGKAT; ix) 2 UNIT TANGKI AIR; x) 1 UNIT
TEMPAT LETAK MOTOSIKAL BERBUMBUNG; DI ATAS PT
78093, PERSIARAN BUKIT RAJA, KAYANGAN / KU5,
KAWASAN PERINDUSTRIAN BANDAR BUKIT RAJA 2, MUKIM
KAPAR, DAERAH KLANG, SELANGOR DARUL EHSAN. UNTUK
TETUAN: VINDA MALAYSIA SDN BHD.

Page 8 of 8
STAR ROLLING SHUTTER SDN. BHD. (49611-W)

LIST OF PROJECT FOR YEAR 2020

ORIGINAL
CLIENT COMPANY
PROJECT TITLE CONTRACT STATUS
NAME
SUM (RM)
CADANGAN PEMBANGUNAN (FASA 4) YANG
MENGANDUNGI, FASA 4A: - 1 TINGKAT TEMPAT LETAK
KERETA SEPARA BESMEN. - 15 UNIT LOT PERNIAGAAN DI
SEBAHAGIAN TINGKAT BAWAH. - 6 TINGKAT TEMPAT LETAK
KERETA PODIUM. - MENARA A - 23 TINGKAT SOHO (552
UNIT, DARI TINGKAT 1 HINGGA TINGKAT 23) DAN RUANG
ZALAM KEMUDAHAN DI TINGKAT 1. FASA 4B: - MENARA B - 20
CORPORATION SDN. TINGKAT SOHO (534 UNIT, DARI TINGKAT 1 HINGGA 141,000.00 ON-GOING
BHD. TINGKAT 20). FASA 4C: - MENARA C - 27 TINGKAT SOHO (390
UNIT DARI TINGKAT 1 HINGGA TINGKAT 27) DAN RUANG
KEMUDAHAN DI TINGKAT 1. FASA 4D: - MENARA D - 22
TINGKAT SOHO (369 UNIT DARI TINGKAT 1 HINGGA TINGKAT
22). DI ATAS SEBAHAGIAN PT 59098, BANDAR SUNSURIA,
MUKIM DENGKIL, DAERAH SEPANG, SELANGOR DARUL
EHSAN UNTUK TETUAN HORIZON L & L SDN. BHD.
CADANGAN MEMBINA 1 UNIT GUDANG PENYIMPAN,
BESERTA 3 UNIT UTILITES BLOK, 1 UNIT POS PENGAWAL, 1
UNIT TNB SUB-STATION,1 UNIT TANGKI AIR & PUMP ROOM
TSK CONSTRUCTION
DI ATAS SEBAHAGIAN LOT P2101-P2104 & P2113-P2116 184,700.00 COMPLETED
SDN BHD
JALAN FZI-P2 (KS-12) PORT KLANG FREE ZONE, MUKIM
KLANG, DAERAH KLANG SELANGOR DARUL EHSAN UNTUK
TETUAN CWT WAREHOUSING SDN BHD (PHASE 3)

HYDRAULIC SERVO MACHINE AND 4 POSTER/ABNORMAL


NOISE FACILITIES BUILDING AT LOT PT 17882, SEKSYEN 20,
BINA JURATI SDN
BANDAR SERENDAH, DAERAH HULU SELANGOR, SELANGOR 24,876.00 COMPLETED
BHD
DARUL EHSAN FOR TETUAN PERODUA MANUFACTURING
SDN BHD
CADANGAN PEMBANGUNAN SEBUAH KOMPLEKS
PERNIAGAAN 25 TINGKAT SECARA HAKMILIK STRATA YANG
MENGANDUNGI : FASA 1
i) PUSAT MEMBELI BELAH 5 TINGKAT DAN PANGGUNG
WAYANG 2 TINGKAT
KHOO SOON LEE
ii) PODIUM TEMPAT LETAK KERETA ARAS BUMBUNG 7 350,288.00 ON-GOING
REALTY SDN BHD
TINGKAT DENGAN 7 TINGKAT MEZZANIN
DI ATAS PT 143339 (HSD 149884), JALAN LANGAT, BANDAR
BESTARI (KS9), MUKIM KLANG, KLANG BANDAR DIRAJA,
SELANGOR DARUL EHSAN

JOHAWAKI
PROJEK KOMPLEKS DEWAN BEDAH, ICU DAN WAD
CONSTRUCTION SDN 40,000 COMPLETED
TAMBAHAN HOSPITAL KUALA LUMPUR (REKA DAN BINA)
BHD

Page 1 of 3
STAR ROLLING SHUTTER SDN. BHD. (49611-W)

LIST OF PROJECT FOR YEAR 2020

ORIGINAL
CLIENT COMPANY
PROJECT TITLE CONTRACT STATUS
NAME
SUM (RM)
CADANGAN MEMBINA 28 UNIT KILANG BERKEMBAR 1
TINGKAT BERSERTA 2 TINGKAT PEJABAT YANG
MENGANDUNGI: I) 22 UNIT JENIS A; II) 2 UNIT JENIS B; III) 2
UNIT JENIS C; IV) 2 UNIT JENIS D DAN 6 UNIT KILANG
BANGLO 1 TINGKAT BERSERTA 2 TINGKAT PEJABAT YANG
HONSEN
MENGANDUNGI A) 1 UNIT JENIS E; B) 1 UNIT JENIS F; C) 1
CONSTRUCTION SDN 69,000.00 COMPLETED
UNIT JENIS G; D) 1 UNIT JENIS H; E) 1 UNIT JENIS J; F) 1 UNIT
BHD
JENIS K DI ATAS LOT BARU (LOT 58620, 58603, 58583,
58619, 58610, 58585, 58621, 58581, 58625, 58622, 58623,
DAN 58624 (DAHULUNYA LOT 7983 DAN LOT 7984), MUKIM
PEKAN KAJANG, DAERAH HULU LANGAT, SELANGOR DARUL
EHSAN, UNTUK TETUAN STERLING DEVELOPMENT SDN BHD
PROPOSED MAIN BUILDING WORKS FOR CADANGAN
PEMBANGUNAN INDUSTRI (EBP V) PRESINT 3A (48 / 60 UNIT
WOO LAI FAT YANG MENGANDUNGI 48 UNITS SINGLE STOREY SEMI-
CONSTRUCTION & DETACHED FACTORY DI ATAS SEBAHAGIAN PT 10559, ECO 324,960.00 ON-GOING
TRADING SDN BHD PERINDUSTRIAN 5, MUKIM IJOK, DAERAH KUALA SELANGOR,
SELANGOR DARUL EHSAN UNTUK TETUAN PARAGON
PINNACLE SDN BHD
CADANGAN MEMBINA 1 BLOK BANGUNAN PERDAGANGAN
SAMSUNG C&T BERCAMPUR 118 TINGKAT, DI ATAS LOT 795,796, 799, 800 &
CORPORATION UEM SEBAHAGIAN LOT 746 DAN BASEMEN LETAK KERETA, DI
823,237.42 ON-GOING
CONSTRUCTION JV ATAS LOT 354, 355 & 742, MUKIM BANDAR KUALA LUMPUR,
SDN BHD DAERAH KUALA LUMPUR, WILAYAH PERSEKUTUAN UNTUK
TETUAN PNB MERDEKA VENTURES SDN BHD
ID FIT-OUT WORKS TO ADDITIONAL GUESTROOM &
JALEX SDN BHD 94,870.00 COMPLETED
MEETING ROOM FOR DORSETT AT PUTRAJAYA

KAYANGANG KEMAS PEMBINAAN BANGUNAN TAMBAHAN HOSPITAL TANAH


99,800.00 ON-GOING
SDN BHD MERAH, KELANTAN (REKA & BINA)
BUILDING AND EXTERNAL WORKS (INCLUSIVE OF ALL PRIME
COST AND PROVISIONAL SUM) FOR CADANGAN
PEMBANGUNAN HOSPITAL SWASTA (500 KATIL) BAGI FASA1
(250 KATIL) YANG TERDIRI DARIPADA BLOK HOSPITAL 8
ASSOCIATED
TINGKAT (SAYAP A) DENGAN PODIUM TEMPAT LETAK
BUILDERS &
KERETA, BLOK PERKHIDMATAN SOKONGAN M&E 2 TINGKAT, 253,462.00 ON-GOING
CONTRACTORS SDN.
BLOK KEDIAMAN KAKITANGAN HOSPITAL 5 TINGKAT, BLOK
BHD.
PERUBATAN SAMPINGAN 5 TINGKAT DAN SEBUAH
PPONDOK PENGAWAL DI ATAS SEBAHAGIAN LOTNPT 1493,
MUKIM KAMPAR DAERAH KAMPAR, PERAK DARUL RIDZUAN
UNTUK TETUAN UTAR EDUCATION FOUNDATION.
CADANGAN KERJA-KERJA UBAHSUAI RUANG DALAMAN DAN
LOWELL BUILDERS KERJA-KERJA YANG BERKAITAN DI PLATINUM MALL,
2,920,000.00 COMPLETED
SDN BHD LEMBAH SIREH, KOTA BHARU, KELANTAN DARUL NAIM
UNTUK TEKUN NASIONAL
Page 2 of 3
STAR ROLLING SHUTTER SDN. BHD. (49611-W)

LIST OF PROJECT FOR YEAR 2020

ORIGINAL
CLIENT COMPANY
PROJECT TITLE CONTRACT STATUS
NAME
SUM (RM)
SUPPLY, DELIVERY, INSTALLATION, TESTING, AND
COMMISSIONING OF EXTRA LOW VOLTAGE SERVICES
FOR CADANGAN PEMBINAAN 2 BLOK KILANG
BERTINGKAT BERSTRATA 6 TINGKAT, 1 TINGKAT
KEMUDAHAN (ARAS BUMBUNG), 1 TINGKAT TEMPAT
AGB BUILDERS
LETAK KERETA DAN 1 TINGKAT BASEMEN TEMPAT 1,650,000.00 ON-GOING
SDN BHD
LETAK KERETA DI ATAS PT 10568 (LOT 54735), LOT
54736 DAN PT 10570 (LOT 54737), JALAN TEKNOLOGI
3/1, TAMAN SAINS SELANGOR, KOTA DAMANSARA,
MUKIM SUNGAI BULOH, DAERAH PETALING, SELANGOR
DARUL EHSAN UNTUK TETUAN EM HUB SDN. BHD.

Page 3 of 3
STAR ROLLING SHUTTER SDN. BHD. (49611-W)

LIST OF PROJECTS FOR YEAR 2021

ORIGINAL
CLIENT COMPANY
PROJECT TITLE CONTRACT STATUS
NAME
SUM (RM)
CADANGAN PEMBANGUNAN 72 UNIT KEDAI PEJABAT 2
TINGKAT (20’ X 65’) DI ATAS PT 16355 BERSERTA LOT 22121
– LOT 22157 DAN PT 16356 BERSERTA LOT 22158 – LOT
Eng Han Bina Sdn 22192, BERSERTA SEBUAH PENCAWANG ELEKTRIK DI ATAS
190,000.00 Awarded
Bhd LOT 21948, SEKSYEN BB5, BANDAR BUKIT BERUNTUNG,
SEKSYEN 20, BANDAR SERENDAH, DAERAH HULU
SELANGOR, SELANGOR DARUL EHSAN UNTUK TETUAN
CASTLE GARDEN SDN BHD
CADANGAN PEMBANGUNAN PERNIAGAAN FASA 1 YANG
MENGANDUNGI:- 1 BLOK PEJABAT 38 TINGKAT (786 UNIT),
16 UNIT KEDAI PEJABAT 1-8 TINGKAT SERTA 4 TINGKAT
PODIUM PERNIAGAAN DENGAN 3 TINGKAT MEZZANIN DAN
1 TINGKAT BAWAH RENDAH DIATAS 4 TINGKAT BASEMEN
Discovery Media Sdn
TEMPAT LETAK KERETA UNTUK KESELURUHAN FASA 1 1,261,515.16 Awarded
Bhd
HINGGA FASA 6 DIATAS SEBAHAGIAN LOT PT 44016 DAN PT
44017, JALAN PJU 8/1, DAMANSARA PERDANA, MUKIM
SUNGAI BULOH, DAERAH PETALING, SELANGOR DARUL
EHSAN UNTUK TETUAN COSMOPOLITAN AVENUE SDN BHD.
(LG1 & LG2, BASEMENT 1,2 & 3)
CADANGAN PEMBANGUNAN 3 BLOK PANGSAPURI
PERKHIDMATAN YANG MENGANDUNGI 2 BLOK PODIUM
TEMPAT LETAK KERETA SERTA LOT KEDAI YANG
MENGANDUNGI: - i) 1 BLOK (A) 22 TINGKAT PANGSAPURI
PERKHIDMATAN 393 UNIT (ARAS 9 HINGGA 30) , ii) 1 BLOK
(B) 22 TINGKAT PANGSAPURI PERKHIDMATAN 393 UNIT
(ARAS 9 HINGGA 30) BESERTA, iii) 1 TINGKAT PODIUM
KEMUDAHAN PENDUDUK (ARAS 8), iv) 7 TINGKAT PODIUM
TEMPAT LETAK KERETA (ARAS 1 HINGGA 7), v) 1 UNIT
Sri Binaraya Sdn Bhd PENCAWANG PEMBAHAGI UTAMA (DALAM BANGUNAN DI 142,736.00 Awarded
ARAS 1), vi) BLOK (C) 21 TINGKAT PANGSAPURI
PERKHIDMATAN 416 UNIT (ARAS 11 HINGGA 31) BESERTA,
vii) 1 TINGKAT PODIUM KEMUDAHAN PENDUDUK (ARAS 10),
viii) 9 TINGKAT PODIUM TEMPAT LETAK KERETA (ARAS 1
HINGGA 9) DAN ix) 2 TINGKAT LOT KEDAI 46 UNIT DAN
TEMPAT LETAK KERETA (ARAS 1 & 2) DI ATAS LOT 9314
(PT5694 H.S (D) 6468) JALAN BUKIT, MUKIM KAJANG,
DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK
TETUAN METRO K.L CITY SDN BHD

Page 1 of 2
STAR ROLLING SHUTTER SDN. BHD. (49611-W)

LIST OF PROJECTS FOR YEAR 2021

ORIGINAL
CLIENT COMPANY
PROJECT TITLE CONTRACT STATUS
NAME
SUM (RM)
CADANGAN MEMBINA LALUAN “CORONATION SQUARE
TOWER 3 PROJECT” DARI LOT PTB 24665 JALAN TRUS /
JALAN ABDULAH IBRAHIM / JALAN GEREJA, MUKIM
BANDAR, DAERAH JOHOR BAHRU, NEGERI JOHOR DARUL
Huashi (Malaysia)
TAKZIM: PROPOSED CONSTRUCTION & COMPLETION OF 1
Sdn Bhd - CSII
BLOCK 31-STOREY OFFICE TOWER CONSISTING OF 23 590,000.00 Awarded
Development
FLOORS OFFICES, 2 FLOORS SKYBRIDGE, 4 FLOORS PODIUM
(Malaysia) Sdn Bhd
CARPARK, 2 FLOORS RETAIL AND 4 FLOORS BASEMENT
CARPARK ON LOT PTB 24665 JALAN TRUS / JALAN
ABDULLAH IBRAHIM / JALAN GEREJA, MUKIM BANDAR,
DAERAH JOHOR BAHRU, NEGERI JOHOR DARUL TAKZIM.
CADANGAN PEMBANGUNAN 1 BLOK PANGSAPURI SERVIS
(364 UNIT) 49 TINGKAT YANG MENGANDUNGI:A. BLOK
PODIUM 8 TINGKAT YANG TERDIRI: I) 1 TINGKAT LOBI,
RUANG PERNIAGAAN, TASKA DAN PEJABAT PENGURUSAN
(DI ARAS TANAH) II) 7 TINGKAT TEMPAT LETAK KERETA (DI
Macrobridge Sdn Bhd ARAS 9 HINGGA ARAS 48)DENGAN 3 TINGKAT TEMPAT 115,865.00 On-Going
LETAK KERETA BAWAH TANAH DI ATAS LOT 215, SEKSYEN
63, PERSIARAN STONOR , WILAYAH PERSEKETUAN KUALA
LUMPUR.UNTUK TETUAN GALLIMONT DEVELOPMENT SDN.
BHD.

CADANGAN MEMBINA SEBUAH KILANG SARUNG TANGAN


GETAH 1 TINGKAT DAN 'MACHINERY PLATFORM CUM
PACKING AREA' 4 TINGKAT DI ATAS LOT 304994, JALAN
Pasukhas
119,667.00 On-Going
Construction Sdn Bhd CHEPOR 11/8, KAWASAN PERUSAHAAN SERAMIK CHEPOR,
31200 MUKIM HULU KINTA, DAERAH KINTA, PERAK UNTUK
TETUAN FINTEC GLOVE SDN BHD

MENYIAPKAN BAKI KERJA BAGI HOSPITAL (40 KATIL), BERA,


PAHANG (PAKEJ 2 - KERJA BANGUNAN DAN LAIN-LAIN KERJA
Marimas Sdn Bhd 40,489.00 COMPLETED
BERKAITAN)

PROPOSED MIXED DEVELOPMENT CONSISTING OF WATER


THEME PARK, 2 BLOCK OF RETAIL WITH FACILITIES (2
Gamuda STOREY), 1 BLOCK ADMINISTRATION OFFICE (2 STOREY), 2
Engineering – Lim UNIT OF 11KV SUB-STATIONS, 3 UNIT OF REFUSE CHAMBER,
190,000.00 Awarded
Hoo Seng (Theme OPEN CARPARK (TEMPORARY) AND OTHER FACILITIES AT
Park) Joint Venture MUKIM TANJUNG 12, DAERAH KUALA LANGAT, SELANGOR
DARUL EHSAN

Page 2 of 2
SHOP DRAWING

Wall Structure Shutter Overall Shutter Clear Box


Door Ref. Shutter Width Clear Height RS Motor Qty
Width Width Width (HxW)
RG - RS1 6000 6150 6150 6000 4900 550x450 RS motor ECR-412-1P (600Kg), 1 phase, 220V, 50Hz 1
Note:
1. All dimension in mm if not specified.
2. The 3-pin plug socket power point for each
G.I Anchor RS motor within linear distance Max.450mm
M10 x 75mm G.I Anchor from RS motor.
BZ M6

M10 x 75mm
3. The RS motor position indicated in this

BZ M6
drawing is under standard proposal.The actual
75 position is subject to the final site condition
75
75
OUTSIDE A
75
Min. Min.
200
Wall Structure width 200
SG-75G Side Guide
(Thk. 2.0mm) SG-75G Side Guide
(Thk. 2.0mm)
Brick wall
BZ M6

6M ZB
Box
(W)
Sprocket
Shutter Clear Width
Shutter Width
Shutter Overall Width G.I Anchor
M12 x 75mm
INSIDE A
PLAN VIEW

1000 Allowance to ease Installation and


G.I Cover
Maintenance
(Thk 0.5mm) Overlap Interval distance 1219mm
on Top, Front and Bottom
RS Motor Power point 1 phase, RC Beam
(View from inside) Box
220v, 3-Pin socket
(Max. linear distance 450mm from RS (W)
Motor)
Box
(H) RS Motor STAR ROLLING Shutter Sdn. Bhd.
13 B, Jalan TIAJ 2/5
Allowence Taman Industri Alam Jaya,
25 Bandar Puncak Alam,
42300 Selangor Darul Ehsan
G.I Conduit Motor Plate w/o Motor
Malaysia.
(Exposed) Cover
Bricktype N.A Aluminium
Roller Grille G.I Cover (Thk 0.5mm)
With Box Edge GD Capital Holdings Sdn. Bhd.

Brick wall
3 way Control Switch Button
with Stainless Steel Clear Height
Faced Metal Keybox (H)
G.I Side Guide
75mm x 75mm x thk.2.0mm G.I Anchor
(SG-75G) M10 x
75mmm

1500

FFL FFL
OUTSIDE INSIDE

Aluminium T-Bottom Bar

75 Shutter Clear width 75 SECTION A-A


Shutter Overall Width

FRONT VIEW
SHOP DRAWING

Note:
1. All dimension in mm if not specified.
2. The 3-pin plug socket power point for each
RS motor within linear distance Max.450mm
from RS motor.
3. The RS motor position indicated in this
drawing is under standard proposal.The actual
position is subject to the final site condition
MS Angle Hex Head
MS Angle 50mm x 50mm Sleeve Anchor
50mm x 50mm x thk.2.0mm M10 x 60mm
x thk.2.0mm G.I Side Guide
Hex Head
Sleeve Anchor G.I Side Guide 75mm x 75mm x thk.3.0mm
M10 x 60mm 75mm x 75mm x thk.3.0mm (SG-75G)
(SG-75G)
Hex. Bolt & Nut
M10 (Grade
Hex. Bolt & Nut 8.8)
M10 (Grade 8.8) SG-75G Side Guide
SG-75G Side Guide (Thk. 3.0mm)
(Thk. 3.0mm) OUTSIDE A
Min. Min.
200
Structure width 200
RC Beam

Brick wall

Sprocket

Box Wall Structure Shutter Overall Shutter Clear Clear Height Box
(W) Door Ref. Shutter Width RS Motor Qty
Width Width Width (HxW)
FRS12 4200 4350 4350 4200 4900 550X450 Fire Mode RS motor ECR-809-1P (800Kg), 1 phase, 220V, 50Hz 1
FRS13 4300 4450 4450 4300 4900 550X450 Fire Mode RS motor ECR-809-1P (800Kg), 1 phase, 220V, 50Hz 1
Shutter Clear width
FRS14 4080 4230 4230 4080 4900 550X450 Fire Mode RS motor ECR-809-1P (800Kg), 1 phase, 220V, 50Hz 1
Shutter Width
FRS - RS1 6000 6150 6150 6000 4900 550X450 Fire Mode RS motor ECR-809-1P (800Kg), 1 phase, 220V, 50Hz 1
Shutter Overall Width FRS3 4935 5085 5085 4935 4000 550X450 Fire Mode RS motor ECR-412-1P (600Kg), 1 phase, 220V, 50Hz 3
INSIDE A FRS5 2300 2450 2450 2300 4000 550X450 Fire Mode RS motor ECR-412-1P (600Kg), 1 phase, 220V, 50Hz 1
PLAN VIEW FRS6 2000 2150 2150 2000 3700 550X450 Fire Mode RS motor ECR-412-1P (600Kg), 1 phase, 220V, 50Hz 1 STAR ROLLING Shutter Sdn. Bhd.

FRS7 6500 6650 6650 6500 3700 550X450 Fire Mode RS motor ECR-809-1P (800Kg), 1 phase, 220V, 50Hz 2 13 B, Jalan TIAJ 2/5
Taman Industri Alam Jaya,
FRS4 7300 7450 7450 7300 4000 550X450 Fire Mode RS motor ECR-809-1P (800Kg), 1 phase, 220V, 50Hz 1 Bandar Puncak Alam,
42300 Selangor Darul Ehsan
FRS1 5300 5450 5450 5300 2800 450X400 Fire Mode RS motor ECR-412-1P (600Kg), 1 phase, 220V, 50Hz 1 Malaysia.

FRS2 3965 4115 4115 3965 2800 450X400 Fire Mode RS motor ECR-412-1P (600Kg), 1 phase, 220V, 50Hz 1

G.I Anchor
M12 x 75mm GD Capital Holdings Sdn. Bhd.

Power point 1 phase,


Powder Coated 220v, 3-Pin socket
G.I Cover (thk. 1.0mm) Overlap (Max. linear distance 450mm
Interval distance 1219mm on from RS Motor)
Top,Front,Rear,Bottom(View from
Inside) Steel Strip Relay DC 24V Input
100mm x 300mm Console Box (Max. linear RC Beam
RS motor distance 450mm from RS
MS Angle (Thk.0.48mm) Box
65mm x 65mm Motor) (W)
x thk.5.5mm
Box
Steel Strip (H)
100mm x 700mm RS Motor
(Thk.0.48mm)

Allowence
140

Powder Coated Bluescope


High Tensile ZACs® Steel
Scale N.T.S 100
Slat (Thk.1.0mm)
Clear Height
(H)
3 way control
switch button
Powder Coated G.I Side Guide Hex Head
75mm x 75mm x thk.3.0mm Sleeve Anchor
(SG-75G) M10 x 60mm

Brick wall ®
1500
MS Angle
50mm x 50mm
x thk.2.0mm FFL FFL
OUTSIDE INSIDE
65 SRS Door Tag Fire Rated Tag

Powder Coated G.I 75 Shutter Clear width 75


T-Bottom Bar (thk 3.0mm)
Shutter Overall Width SECTION A-A
FRONT VIEW
SHOP DRAWING

G.I Anchor G.I Anchor

BZ M6

BZ M6
M10 x 75mm M10 x 75mm
Note:
1. All dimension in mm if not specified.
75 75 2. The 3-pin plug socket power point for each
RS motor within linear distance Max.450mm
75 75 from RS motor.
SG-75G Side Guide SG-75G Side Guide 3. The RS motor position indicated in this
(Thk. 2.5mm) OUTSIDE A (Thk. 2.5mm)
Door Ref.
Wall Structure Shutter Overall
Shutter Width
Shutter Clear
Clear Height
Box
RS Motor Qty drawing is under standard proposal.The actual
Width Width Width (HxW)
FRS20 11000 11150 11150 11000 4900 600X500 Fire Mode RS motor ECR-1617-3P (1500Kg), 3 phase, 415V, 50Hz 1 position is subject to the final site condition
Min. Min. FRS15 7600 7750 7750 7600 5300 600X500 Fire Mode RS motor ECR-1617-3P (1500Kg), 3 phase, 415V, 50Hz 2
Structure width FRS16 7950 8100 8100 7950 4900 600X500 Fire Mode RS motor ECR-809-1P (800Kg), 1 phase, 220V, 50Hz 1
200 200
FRS17 8100 8250 8250 8100 4900 600X500 Fire Mode RS motor ECR-1617-3P (1500Kg), 3 phase, 415V, 50Hz 1
RC Beam FRS8 4935 5085 5085 4935 4650 550X450 Fire Mode RS motor ECR-412-1P (600Kg), 1 phase, 220V, 50Hz 1
FRS9 3000 3150 3150 3000 4600 550X450 Fire Mode RS motor ECR-412-1P (600Kg), 1 phase, 220V, 50Hz 1
Brick wall FRS10 5000 5150 5150 5000 4600 550X450 Fire Mode RS motor ECR-412-1P (600Kg), 1 phase, 220V, 50Hz 1
FRS12 4200 4350 4350 4200 4900 550X450 Fire Mode RS motor ECR-412-1P (600Kg), 1 phase, 220V, 50Hz 1
FRS13 4300 4450 4450 4300 4900 550X450 Fire Mode RS motor ECR-412-1P (600Kg), 1 phase, 220V, 50Hz 1
FRS14 4080 4230 4230 4080 4900 550X450 Fire Mode RS motor ECR-412-1P (600Kg), 1 phase, 220V, 50Hz 1
Fire Mode RS motor ECR-412-1P (600Kg), 1 phase, 220V, 50Hz
BZ M6

6M ZB
FRS18 3600 3750 3750 3600 4900 550X450 1
Box FRS19 3390 3540 3540 3390 4900 550X450 Fire Mode RS motor ECR-412-1P (600Kg), 1 phase, 220V, 50Hz 2
FRS21 5900 6050 6050 5900 4900 550X450 Fire Mode RS motor ECR-809-1P (800Kg), 1 phase, 220V, 50Hz 1
(W) FRS24 3705 3855 3855 3705 4900 550X450 Fire Mode RS motor ECR-412-1P (600Kg), 1 phase, 220V, 50Hz 1
FRS21 2400 2550 2550 2400 2800 450X400 Fire Mode RS motor ECR-412-1P (600Kg), 1 phase, 220V, 50Hz 2
Sprocket FRS22 3000 3150 3150 3000 3000 450X400 Fire Mode RS motor ECR-412-1P (600Kg), 1 phase, 220V, 50Hz 1
FRS23 1500 1650 1650 1500 2800 450X400 Fire Mode RS motor ECR-412-1P (600Kg), 1 phase, 220V, 50Hz 1
Shutter Clear Width FRS11 4900 5050 5050 4900 5300 600X500 Fire Mode RS motor ECR-809-1P (800Kg), 1 phase, 220V, 50Hz 1

Shutter Width

Shutter Overall Width


G.I Anchor
M12 x 75mm
INSIDE A

PLAN VIEW

Powder Coated G.I Cover (Thk 1.0mm)


Overlap Interval distance 1219mm on
Top,Front,Rear,Bottom (view from
1000 Allowance to ease Installation
Inside) and Maintenance
Power point 1 or 3 phase, STAR ROLLING Shutter Sdn. Bhd.
Box Edge 220v or 415V, 3-Pin socket / Isolator 13 B, Jalan TIAJ 2/5
RS Motor (Max. linear distance 450mm from RS RC Beam Box Taman Industri Alam Jaya,
Motor) (W) Bandar Puncak Alam,
42300 Selangor Darul Ehsan
Relay DC 24V Input
Malaysia.
Console Box (Max. linear distance 450mm Box
from RS Motor) (H)
RS Motor

Allowence GD Capital Holdings Sdn. Bhd.


25
Motor Plate w/o Motor
Powder Coated Cover (Optional)
Bluescope High Tensile
G.I Anchor
ZACs® Steel Slat G.I Conduit M10 x G.I Cover (Thk 1.0mm)
(Thk 1.0mm) (Exposed) 75mmm with Box Edge

Clear Height
(H)
3 way Control Switch Button
with Stainless Steel
Powder Coated G.I Faced Metal Keybox Scale N.T.S
Side Guide
75mm x 75mm x
thk.2.5mm 100
(SG-75G)
®

1500 Brick wall

FFL FFL
OUTSIDE INSIDE

Powder Coated G.I SRS Door Tag


Fire Rated Tag
T-Bottom Bar
(Thk. 3.0mm) 75 Shutter Clear width 75 SECTION A-A
Shutter Overall Width

FRONT VIEW
STAR ROLLING TYPICAL DRAWING

Note:
1. All dimension in mm if not specified.
2. The 3-pin plug socket power point for each
RS motor within linear distance Max.450mm
wall (by others) from RS motor.
3. The RS motor position indicated in this
lintel lintel above drawing is under standard proposal.The actual
Side Guide Encasement (by others) (by others) position is subject to the final site condition
(by others)

wall (by others)

lintel (by others)

PLAN

PART UPPER PLAN PART LOWER PLAN

lintel
(by others)

power supply isolator


with e-source (by others)
voltage free individual fire STAR ROLLING Shutter Sdn. Bhd.
alarm signal cables from 13 B, Jalan TIAJ 2/5
fire alarm panel (by others) Taman Industri Alam Jaya,
Bandar Puncak Alam,
PART UPPER PLAN 42300 Selangor Darul Ehsan
Malaysia.
fire alarm junction box
(by others)

lintel (by others)

ISOMETRIC VIEW OF DOOR CURTAIN

PART LOWER PLAN

SEE ISOMETRIC DETAIL

INTERNAL ELEVATION SECTION A-A

TYPICAL DETAILS OF MOTORISED INSULATED FIRE SHUTTER (2HRS FIRE INSULATION, 4HRS INTEGRITY)