ORKIDE THE ROYAL CONDOMINIUM

DCC CONTRACTS

MATERIAL APPROVAL REQUEST


Date submitted: 28-JAN-2022 M.A.R. Ref. # ORK-DCC-MAS-ID-006
Approval required by: Tech: Spec: Ref:
Discipline& Work Package: GYM ID
Description of materials: MIRROR GLASS
From approved list as per Yes No
Country of origin & Manufacturer LOCAL
spec:
Supplier: LOCAL
Location/ Area of use: GYM AREA
Attachment Yes No Yes No
1. Specification Comparison Sheet 3. Brochures
2. Sample submitted 4. Other supportive Documents

Additional notes if any from contractor

Contractor: DCC CONTRACTS Submitted by: MENG SOKPHEAROM Signature: ………………………………………


Engineer’sComments :

CONCLUSION  Status A – Accepted  Status B - Accepted with Comments  Status C – Rejected

Reviewed by Design Consultant Reviewed by the Engineer Approved by Client (ORK)


(if applicable) (ACT PCM) (If Required)
Sign: Sign: Sign:

Name:________________ Name:_____________________ Name: ___________________

Designation: __________ Designation: ______________ Designation:_____________


Date: __________________ Date:_______________________ Date:_____________________

Note: This submittal was reviewed and commented by the Engineer based from the available references as per contractor’s submittal and contract documents. As per
General Conditions of the contract, any approval, check, certificate,consent, examination, inspection, instruction notice, proposal, request, test, or similar act by the
Engineer (including absence of approval) shall not relieve the Contractor from any responsibility he has under the contract, including responsibility for errors, omissions,
discrepancies and non compliances.