Professional Documents
Culture Documents
28-Mar-18 ON ON STANDBY
29-Mar-18 ON ON STANDBY
30-Mar-18 ON ON STANDBY
31-Mar-18 ON ON STANDBY
1-Apr-18 ON ON STANDBY
2-Apr-18 ON ON STANDBY
3-Apr-18 ON ON STANDBY
4-Apr-18 ON ON STANDBY
5-Apr-18 ON ON STANDBY
6-Apr-18 ON ON STANDBY
7-Apr-18 ON ON STANDBY
8-Apr-18 ON ON STANDBY
9-Apr-18 ON ON STANDBY
10-Apr-18 ON ON STANDBY
11-Apr-18 ON ON STANDBY
12-Apr-18 Tripped and started ON STANDBY
13-Apr-18 ON ON STANDBY
14-Apr-18 ON ON ON
28-Apr-18 ON ON ON
29-Apr-18 ON ON ON
30-Apr-18 ON ON ON
1-May-18 ON ON ON
2-May-18 ON ON ON
3-May-18 ON ON ON
4-May-18 ON ON ON
5-May-18 ON ON ON
6-May-18 ON ON ON
7-May-18 ON ON ON
8-May-18 ON STANDBY ON
9-May-18 ON STANDBY ON
10-May-18
C-2501 D C-9001 A C-9001 B
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON ECAN Ch
ON ON ON Month
ON ON ON Jan
ON ON ON Feb
ON ON ON March
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON EPEX Ch
ON ON ON Month
ON ON ON Jan
ON ON ON Feb
ON ON ON March
ON ON ON
ON ON STOPPED
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON STOPPED
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON STOPPED
ON ON STOPPED
ON ON STOPPED
ON ON STOPPED
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON Stopped
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
tripped twice tripped twice
ON and started and started
ON ON ON
ON ON ON
ON ON ON
Tripped and
ON Started ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
TRIPPED @0445hrs ON ON
Tripped and Tripped and
Out of service Started Started
Out of Service ON ON
Tried to start, No success,
Bearing Temp high ON ON
Out of service ON ON
Standby ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
ON ON ON
Stopped ON ON
Standby ON ON
STANDBY ON ON
Tripped and
STANDBY Started ON
Tripped and
STANDBY Started ON
STANDBY ON ON
Tripped and
Standby Started ON
Standby ON ON
Tripped and
ON Started ON
Standby ON ON
Standby ON ON
Standby ON ON
Standby ON ON
ON ON ON
ON ON ON
ECAN Chiller A Trippings ECAN Chill
M1 M2 Contact Diffuser Fault IGV Calibration Surging Month
0 7 1 0 Jan
0 3 0 0 Feb
1 0 0 0 March
28th March
· C-9001-A tripped twice at diffuser position fault, s
· C-9001-B tripped twice at excessive comp surging
13th Feb-18
19th Jan
· C-2501A tripped thrice with diffuser fault, diffuser
C-2501D tripped with guide van alarm, calibration of IGV was don
11th Jan-18
· C-2501A tripped twice with diffuser fault. N/S foll
1sth Jan C-2501A tripped twice with diffuser fault alarm, calibration was d
ECAN Chiller D Trippings
M1 M2 Contact Diffuser Fault IGV Calibration Surging
1 0 0 0
0 0 0 0
0 0 0 0
001-A tripped twice at diffuser position fault, same was re-set and start after set value change from 9.0°C to 11°C and now operating normal.
001-B tripped twice at excessive comp surging ,same was re-set and start after set value change from 9.0°C to 11°C and now operating normal.
501A tripped with diffuser fault at 1825, rest and took in service.
501-A tripped @ 0730 hrs. in morning and at 1800 hrs. in evening, on Diffuser position fault, restarted after resetting from field, due to temperature loa
501A tripped thrice with diffuser fault, diffuser fault rectified through calibration. Now it is SP is 13°C. Now running normal.
ith guide van alarm, calibration of IGV was done. Now working nor
operating normal.
w operating normal.
field, due to temperature load C-2501-C taken into service and will be stopped after V-2501 temperature is brought down to desired S.P.
down to desired S.P.