Variation in Quantities (Civil Works-Division 2)
BOQ Item: Description Quantity (As per Drawings) Quantity (Actual on site)
m2 m2
2.4.1.1 24mx29m +
Dismantling of roof (AS PER DRAWINGS) 29mx24m + = 1209 m2
13.5mx38m 5.5mx6m
5.1.1 Reinstalling of roof at 4-7 & A-E 18.9mX24m = 453.6 m2 5.4mx24m +
5.5mx6m
Division 2 (Total to be Deducted)
Previously submitted deductions based on BOQ AREA (Grid 1-7 & A-G)
Note: BOQ Reference Grids are specifying the area to be covered in demolition works.
If we take this area, as the basis of our calculation, for the work that is less executed then the total comes around 121,505/
If we take the exact area as per drawings,excluding the openings, as the basis of our calculation, then the total comes arou
Since the rate has been quoted by JCE based on BOQ, So the same may be referred to when calculating the deductions.
s (Civil Works-Division 2)
Quantity (Actual on site) Difference % diff. (i.e
Price less
Total to be
m2 m2 Quoted as Executed) deducted
per BOQ
= 729 m2 480 78,198/- 39.7 31,044/-
=162.6 m2 291 101,987/- 64.2 65428/-
Deducted) 96,472/-
n BOQ AREA (Grid 1-7 & A-G) 121,504/-
Difference 25,302/-
the total comes around 121,505/- SAR.
ation, then the total comes around 96,472/-SAR.