Professional Documents
Culture Documents
Data Mix Design
Data Mix Design
Kadar Lumpur
Nomor Sampel A B
Berat benda uji kering oven 500 500
Berat benda uji bersih kering oven 494.8 493.5
KL = (W1-W2)/W1 0.010 0.013
Kadar Lumpur 0.012
Hasil Uji Material Pasir (Agregat Halus)
Kadar Lumpur
Nomor Sampel A
Berat benda uji kering oven 500
Berat benda uji bersih kering oven 407.8
KL = (W1-W2)/W1 0.184
Kadar Lumpur 0.185
2
771.60
100
713.60
2.381
2.384
2
500
431.9
15.768
16.227
2
100
86.2
16.009
16.009
B
500
406.9
0.186
0.185
ANALISA SARINGAN AGREGAT KASAR
Banyak Percobaan
SARINGAN
Berat tertinggal 1 Berat tertinggal 2
No. (mm) gram % gram %
3" 76.20 0.00 0.000
2.5" 63.50 0.00 0.000
2" 50.80 0.00 0.000
1.5" 38.10 0.00 0.000
1" 25.40 0.00 0.000
3/4" 19.10 1223.90 24.478
1/2" 9.50 3677.30 73.546
3/8" 19.10 63.40 1.268
4.00 4.76 13.80 0.276
8.00 2.38 0.80 0.016
16.00 1.19 0.10 0.002
30.00 0.59 0.20 0.004
50.00 0.30 0.30 0.006
100.00 0.15 0.50 0.010
200.00 0.30 1.20 0.024
Pan 4.60 0.092
Jumlah 4986.10 99.722
99.72 60
99.72 50
40
30
20
10
0
0 4 0,5
120 20 mm
100
10 0 0.15 80
60 30 0.43
100 85 1.70 60
100 75.24
40
99.72
99.72 20
99.72
99.72 0
1 2 3
99.72
5 0 0.15 40 mm
40 10 0.43
70 35 1.70
120
100 95 75.24
100 99.72 100
99.72
80
99.72
99.72 60
99.72
40
20
0
1 2 3
60
40
20
0
1 2 3
10 mm
20 mm
Zona 2
2 3
40 mm
3 4
3 4
Agregat Halus Sampel 1
Lubang Saringan
Berat Tertinggal Persen Kumulatif
No (mm) gram % Tertinggal Lolos
4 4.76 100.70 10.07 10.07 89.23
8 2.38 85.50 8.55 18.62 80.68
16 1.19 265.50 26.55 45.17 54.13
30 0.59 362.40 36.24 81.41 17.89
50 0.30 153.50 15.35 96.76 2.54
100 0.15 12.60 1.26 98.02 1.28
200 0.08 12.60 1.26 99.28 0.02
Pan 0.20 0.02 99.30 0.00
Jumlah 993.00 99.30 548.63 245.77
2.4 60 95 80.68 80
4.8 90 100 89.23
50
40 34
30
20 17.89
20 15
10
10 5
1.28 2.54
0
0
0.15 0.3 0.6
Ukuran M
Agregat Halus Zona 1
100 100
95
90
89.23
80.68
70
60
54.13
Batas Atas
Batas Bawa h
Anal i s a Sa ri nga n
34
30
20 17.89
15
5
2.54
10 100 60
50
40
30
30
20
10 8
10 2.54
1.28
0
0
0.15 0.3
Agregat Halus Zona 2
100 100
0
90 90
89.23
0
80.68
0 75
0
59
0 55
54.13
0
0 35
30
0
17.89
0
10 8
0 2.54
1.28
0
0
0.15 0.3 0.6 1.2 2.4 4.8 10
Ukuran Mata Ayakan
Lubang Ayakan (mm) Zone 3 Data
0.15 0 10 1.28
0.3 12 40 2.54 100
0.6 60 79 17.89
90
1.2 75 100 54.13
2.4 85 80.68 80
4.8 90 89.23
50
40
40
30
20
10 12
10
1.28 2.54
0
0
0.15 0.3
Agregat Halus Zona 3
100 100
100
90
89.23
90 85
79 80.68
80 75
70
60
60 54.13
50
40
40
30
17.89
20
10 12
10
1.28 2.54
0
0
0.15 0.3 0.6 1.2 2.4 4.8 10
40
30
17.89
2015 15
10
1.28 2.54
0
0
0.15 0.3 0.6
Uku
Agregat Halus Zona 4
100 100
95 95
90 89.23
80 80.68
54.13
50
17.89
15
2.54
20
7 1.64
11.48
31.48
Semen tipe 1 Berat jenis pasir
28 hari (batu pecah 37) 2.384 2,607
0.44 Berat Jenis Koral
0.6 2.762 2,697
30-60
40
170
386.364 45
diabaikan 38
275 41.5
diabaikan
Zone 2
34%
2.666
2437.5
1881
640
1242 proporsi campuran
No. Uraian Jml Sat
1 semen 2.05 kg
2 agregat halus 3.39 kg
3 Agregat kasar 6.58 kg
4 air 0.90 liter
Serat 0.17
Abu serat 0.06
Recycle 0.46
1-k-175 14,53
2-k200 16,6
3-k-225 18,67
4-k-250 20,75
5-k-275 22,83
6-k-300 24,9
7-k-325 26,97
8-k-350 29,05
Inovasi
0.16945
0.06
0.46