Professional Documents
Culture Documents
BU 1
Digunakan, H balok = 600 mm
B balok min = 1/2 x H
= 1/2 x 600
= 300 mm
B balok max = 2/3 H
= 2/3 x 600
= 400
Digunakan. B balok = 300 mm
BA 1
Digunakan, H balok = 500 mm
B balok min = 1/2 x H
= 1/2 x 500
= 250 mm
B balok max = 2/3 H
= 2/3 x 500
= 333.333333
Digunakan. B balok = 300 mm
3
Asumsi Awal
H = 120 mm
Lx = 4000
Ly = 4000
bE = bw +f 300 480
= 780 mm
Menghitung k
k ≈ 1,0 + 0,2 (bE/bw) untuk 2 < bE/bw < 4 dan 0,2 < t/h <0,5 (menurut Chu Ki Wang 16.4.2c)
bE/bw = 2.6
t/h = 0.2
Chu Ki Wang 16.4.2c
k = 1.478
Ib 1 = (k x bw x h3)/12
= 7982574545 mm4
= 798257.4545 cm4
Is 1 = 1/12 x b x h3
= 576000000 mm4
Balok 2 780
h = 600 mm
bw = 300 mm
120
x2 = 4000
Penyelesaian
f = (h-t) ≤ 4t 480
480 ≤ 480 OK!
bE = bw +f 300 480
= 780 mm
Menghitung k
bE/bw = 2.6
t/h = 0.2
Chu Ki Wang 16.4.2c
k = 1.478
Ib 2 = (k x bw x h3)/12
= 7982574545 mm4
= 798257.4545 cm4
Is 2 = 1/12 x b x h3
576000000
Balok 3 1060
h = 500 mm
bw = 300 mm 120
x3 = 8000 mm
f = 2 x (h-t) ≤ 8t 380
760 ≤ 960 OK!
bE = bw +f
= 1060 mm 380 300 380
Menghitung k
bE/bw = 3.533
t/h = 0.24
Chu Ki Wang 16.4.2c
k = 1.690
Ib 3 = (k x bw x h3)/12
= 5281902687 mm4
= 528190.2687 cm4
Is 3 = 1/12 x b x h3
1152000000 mm4
Balok 4 1060
h = 500 mm
bw = 300 mm 120
x4 = 8000 mm
f = 2 x (h-t) ≤ 8t 380
760 ≤ 960 OK!
bE = bw +f
= 1060 mm 380 300 380
Menghitung k
bE/bw = 3.533
t/h = 0.24
Chu Ki Wang 16.4.2c
k = 1.690
Ib 4 = (k x bw x h3)/12
= 5281902687 mm4
= 528190.2687 cm4
Is 4 = 1/12 x b x h3
1152000000 mm4
Ln = Lx-bw
= 4000 mm 157.48 inch
Sn = Ly -bw
4000 mm 157.48 inch
β = Ln/ Sn
= 1 1
fy = 400 mpa 58015.09 lb/inch2
αm = 9.222
Keliling = 2 x (Ln + Sn)
= 16000 629.92 inch
βs = Keliling/Ln
4 4
ℎ= 𝐿𝑛(0,8+𝑓𝑦/1400)/(36+9𝛽)
h min = 96.50793651
1. Design Dimensi Balok
Rumus
h = L/16
b = 1/2 s.d 2/3 h
Tipe
1. Balok Induk
h
b
�=(𝟏+ (𝒃_𝑬/𝒃_𝒘 −𝟏)(𝒕/𝒉)[𝟒−� (�/�)+𝟒 (�/�)^𝟐+(�_�/
t min 〖 = (Ln(0,8+0,2 fy/40000)/(36−2,5(1−βs)(1+Ln/Sn)+5α_m.Ln/Sn) 〗
t 〖 = (Ln(0,8+0,2 fy/40000)/36 〗
#REF!
#REF!
BU 1
Digunakan, H balok = 600 mm
B balok min = 1/2 x H
= 1/2 x 600
= 300 mm
B balok max = 2/3 H
= 2/3 x 600
= 400
Digunakan. B balok = 300 mm
BA 1
Digunakan, H balok = 500 mm
B balok min = 1/2 x H
= 1/2 x 500
= 250 mm
B balok max = 2/3 H
= 2/3 x 500
= 333.33333
Digunakan. B balok = 300 mm
Asumsi Awal
H = 120 mm
Lx = 4000
Ly = 8000
Keterangan :
1 = BU 1
2 = BU 1
3 = BU 1
4 = BA 1
780
120
480
300 480
Balok 2
780
120
480
300 480
Balok 3
1260
120
480
Balok 4
1060
120
380
α1 = Ib 1 / Ip 1
= 8.9002438
α2 = Ib 2 / Ip 2
= 8.9002438
α3 = Ib 3 / Ip 3
= 10.126901
α4 = Ib 4 / Ip 4
= 2.6655637
αm = (α1+α2+α3+α4) / 4
= 7.6482381
αm > 2
Ln = Ly - 2 x (1/2 B Balok)
= 7700 mm
β = Ly / Lx
= 2
Untuk αm lebih besar dari 2, ketebalan pelat minimum tidak boleh kurang dari
h = (𝐿𝑛(0.8+𝑓𝑦/1400)
)/(36+9𝛽)
h = (3700(0.8+𝑓𝑦/140
0))/(36+9𝛽)
= 154.81481 mm
2. Preliminary Pelat Lantai
1
2 4
Asumsi Awal
H = 120 mm
Lx = 4000
Ly = 4000
Keterangan :
1 = BU 1
2 = BU 1
3 = BA 1
4 = BA 1
780
120
480
300 480
120
480
300 480
Balok 3
1060
120
380
Balok 4
1060
120
380
α1 = Ib 1 / Ip 1
= 8.900244
α2 = Ib 2 / Ip 2
= 8.900244
α3 = Ib 3 / Ip 3
= 5.331127
α4 = Ib 4 / Ip 4
= 5.331127
αm = (α1+α2+α3+α4) / 4
= 7.115686
αm > 2
Ln = Ly - 2 x (1/2 B Balok)
= 3700 mm
β = Ly / Lx
= 1
Untuk αm lebih besar dari 2, ketebalan pelat minimum tidak boleh kurang dari
h = (𝐿𝑛(0.8+𝑓𝑦/1400)
)/(36+9𝛽)
h = (3700(0.8+𝑓𝑦/140
0))/(36+9𝛽)
= 89.26984 mm
Digunakan,
H = 120 mm
1/12 x b x h3 1/12 x b x h3
>
3500 8000
1/12 x h4 5400000000
>
3500 8000
h4 > 28350000000
h > 410.335 mm
L Kolom = 4000 mm
I Kolom I Balok
>
L Kolom L Balok
1/12 x b x h3 1/12 x b x h3
>
4000 8000
1/12 x h4 5400000000
>
4000 8000
h4 > 32400000000
h > 424.264 mm
L Kolom = 7500 mm
I Kolom I Balok
>
L Kolom L Balok
1/12 x b x h3 1/12 x b x h3
>
7500 8000
1/12 x h4 5400000000
>
7500 8000
h4 > 60750000000
h > 496.463 mm
Digunakan,
H = 700 mm
B = 600 mm