Internal Project: Tube Rack Stress Analysis Report
Description
A Study was conducted using Inventor Professional FEA Simulation Package to analyse the load
The Plate rack assembly consists of IPB 160 (All Vertical column members and base (bottom).
For a conservative analysis the addition vertical supporting members for the main load bearing
beams (The main load bearing beam span is approximately 1500mm wide and this is supported
by additional vertical tubes which further subdivides the main beam to shorter spans ) are not
The actual material used for construction is A36 or higher grade steels with Yield Strength of
250MPa. Again, for a conservative approach in the analysis Mild steel was used for beams and
columns in both methods. Analysis methods were performed using a line load of 30Tonnes upon
individual load bearing beams. All the load bearing beam are typical with a span of 1500mm and
therefore the FEA was performed in one beam with fixed constraint at one end.
0|Page
Internal Project: Tube Rack Stress Analysis Report
Fig.1
Fig.2
1|Page
Internal Project: Tube Rack Stress Analysis Report
Fig.3
Von Mises stress in both loading cases < Yield Strength of the beam (450MPa)
Beam deflection in both loading cases < L/360 (4.17 mm)
FEA Method
Material Properties
2|Page
Internal Project: Tube Rack Stress Analysis Report
Gravity load also considered. (Yellow arrow on the end of beam in fig.4)
Fig.4
3|Page
Internal Project: Tube Rack Stress Analysis Report
(Fig.5)
Mesh Information
Study Results
4|Page
Internal Project: Tube Rack Stress Analysis Report
0N 0Nm
-27379.59658 N 0Nm
Result Summary
Volume 6.498e-003 m³
Mass 51.009 kg
5|Page
Internal Project: Tube Rack Stress Analysis Report
6|Page
Internal Project: Tube Rack Stress Analysis Report
Conclusion
A comparison of the loading results is shown below.
Von mises stress in both loading cases < Yield Strength of the beam
Beam deflection in both loading cases < L/360
Since both conditions are met the beam can be loaded up to the values shown above.
7|Page