You are on page 1of 3

CURRICULAM VITAE

2. NAME : RAMESH MADKATTE

3. DATE OF BIRTH : 11th Jan 1986

4. NATIONALITY : Indian

5. PERSON ADDRESS : H.No 18/2/409 Sri Ram Nagar Colony Chidri road Bidar
TELEPHONE NO. : 09591237177,09964205643
LANDLINE NO. : 08482-236735
E-MAIL ADDRESS : ramesh.madkatte@gmail.com
madkatteramesh@gmail.com

6. EDUCATION :  M. Tech. (Structural Engg.) from MS Ramaiah Institute


of Technology, Bangalore, June 2010
 B.E. (Civil Engg.) from Guru Nanak Dev Engineering
College, Bidar , 2007

7. OTHER TRAINING / : Academic Project: Research oriented project on


PROJECTS composite beam under the guidance of Prof T. Valsa,
Experimental and theoretical study on flexture
behaviour of cold formed steel concrete composite
beams.
Channel section with and without shear connectors type of
composite beams where casted, RCC beams is also casted
having an equivalent moment carrying capacity by rigid
plastic analysis as that of composite channel load vs
deflection,load carrying capacity and ductility of the
composite index of the composite beam and conventional RCC
beams were studied. Experimental results were compared
with theoretical results and arrived at meaning full
conclusions.

Computer skills : STAAD Pro 2004, AutoCAD 2000

8. LANGUAGES & : English – Good, Hindi - Good , Kannada – Good, Marathi-Good


DEGREE
OF PROFICIENCY

9. MEMBERSHIP OF : Nil
PROFESSIONAL
SOCIETIES

10. COUNTRIES OF : India


WORK
EXPERIENCE
11. EMPLOYMENT
RECORD:

From Aug. 2007 To June 2008


EMPLOYER : Sobha Developers Ltd., Bangalore
POSITION HELD AND : Site Engineer
DESCRIPTION OF
DUTIES
Project:
Construction of 2 Basement + Ground + 15 storied
residential apartment with RCC structure and concrete
block masonry walls; Area of the project 2,82,000 sqft;
Cost of the project: INR 60 crore

(Site Engineer – Aug. 2007 to June 2008)

Involved in major activities such as marking, shuttering, and


reinforcement and concreting. His responsibilities also as
fallows
 Studying the structural, architectural drawing, for
preparing the bar bending schedule and for estimating
the shuttering quantities,
 To co-ordinate with an architect, RCC designers, & all
concerned consultants.
 Supervision of day-to-day construction activities of
building
 To take measurement of the running bills.
 To check the contractor bills, quantities of stock, etc.
 To take the stock of the material on the site & prepare
stock statement on weekly basis.
 To maintain the quality of the construction as per the
company norms.
 Planning for fast execution for work and maintaining the
quality of work.

Time spent on Project: 11 months

You might also like