Professional Documents
Culture Documents
1. Optimisation of the eNB parameter values, with respect of KPIs from the
system performance evaluation agreement towards the customer, and
those reported to upper managerial layers.
2. Follow-up of outstanding faults that can impact the aforementioned KPIs.
This includes
1. Specific UE issues
2. Specific core network issues
3. Internal eNB faults that can be determined from alarms/PM data/drive
testing analysis.
1. Upgrade to RL20: valid from March 8th 2011 in the nine “golden cluster” sites.
2. First parameter alignment with default “golden” parameters and/or some parameters
previously tuned for Gothenburg: valid from March 16th 2011.
3. Minor parameter change in the golden cluster, tweak for TP during drive testing associated
to system performance evaluation (SPE), maxNrSymPdcch 32 (fine insofar that the
network has very light load)
4. Link parameters changed in the golden cluster, valid from 25th/March (nCqiDtx,t310,…)
5. PRACH parameters + HO correction valid from 30th/March in the golden cluster
6. Network-wide alignment with golden recommendations, valid from April 6th.
7. Network-wide PRACH parameters tested in the golden cluster, valid from April 6th.
8. Link+PRACH parameters changed in a test cluster, valid from April 7th (nCqiDtx,t310,…)
9. Additional testing for feedback to GMC: valid from April 20th, Lindholmen: taCmdMaxRetry
10->3 and Brunnsparken: taOffScheMarg 40->20
1. Discussion about default values for “vendor file” parameters, and how to deploy
the parameter values currently modified in the golden cluster, to the rest of the
network.
2. Discussion about the root cause of the radio link drops, which cause bad KPIs
with the default parameters.
3. Discussion about alignment of RL20 default values with recommended values
for RL10, agreed during the maintenance phase.
4. Troubleshooting for the outstanding problems affecting the KPIs.
1. RRC setup failures due to missing messages from the UE.
2. RRC drops due to missing messages from EPC.
3. FSP crashes.
5. Monitoring of the KPIs.
6. Troubleshooting of miscellaneous issues:
1. Occasional problems in the NetAct result in missing data in the Oracle
database. The data is still available in the iOMS.
2. Three sites crashed after vendor-configurable parameter updates.
Sporadic Additional
drops in drops in
Götaplatsen Svenska
Mässan, to
be checked
enb_rel_rnl Succ. eRAB setup Total eRAB releases
18 04 2011 36 155 158
19 04 2011 27 298 301
20 04 2011 133 544 546
21 04 2011 52 464 470
22 04 2011 33 186 186
23 04 2011 38 137 136
24 04 2011 32 149 150
Traffic has been somewhat
lower last week (about 18%
less eRAB setups compared to
For internal use only
7 © Nokia Siemens Networks / the previous week)
Parameter changes: test of taCmdMaxRetry 103
and taOffScheMarg 4020
Vendor file Lindholmen: large
parameters Lindholmen (100468): variability in the
changed. Large taCmdMaxRetry 103 drops, no evident
decrease in nr of Brunnsparken: change.
drops taOffScheMarg 4020 Brunnsparken:
60
situation may have
50
improved, but
there are too few
40 drops to be
certain,.
30
100443
20 100468
10
0
07 04 2011
08 04 2011
09 04 2011
10 04 2011
11 04 2011
12 04 2011
13 04 2011
14 04 2011
15 04 2011
16 04 2011
17 04 2011
18 04 2011
19 04 2011
20 04 2011
21 04 2011
22 04 2011
23 04 2011
24 04 2011
25 04 2011
26 04 2011
27 04 2011
28 04 2011
60
Rough agreement between
50
the MCS distribution / TP
40 distribution (maximum TP per
Usage [%]
0
0 5 10 15 20 25 30
MCS
UL TP v/s
RSRP per
MCS