Application for Wastewater Discharge Permit

Availability of Service:
Monday to Friday 8:00am to 5:00pm with no noon break

Project Qualified for the Service:


Wastewater Treatment Facilities

Documentary Requirements:
Application Form, Engineer’s Report (for new), Copy of results of water sampling, PCO Accreditation, Copy of ECC
(if there is), Self-monitoring Report (SMR)

Duration: 30 working days

Step Applicant/ Duration of Person in


Service Provider Fee Document Needed
No. Client Activity Charge
1 Proceed to the
Provide guidance to the
Officer of the Officer of
Clearance Permitting 2 minutes None None
Day for proper the day
Division (CPD)
guidance
2 Present Ensure documents Application Form
documents for presented are complete with attached
validation of Engineer’s Report
requirements (for new
applicants), Copy
Prepare Order of Payment
of results of water
30 CPD Staff None
minutes
sampling, PCO
Accreditation,
Copy of ECC (if
there is), Self-
monitoring Report
(SMR)
3 Pay the Issue Official Receipt of 10 minutes Cashier Annual Fee:
Administrative Payment (based on
Fee Volumetric rate
of Discharge)
w/o heavy
metals/ with
heavy metals
0m3 - 10m3
P2,000.00/
P2,500.00
>10m3-30m3: Duly signed Order of
P2,200.00/ Payment
P2,800.00
>30m3-100m3:
P2,500.00
P3,100.00
>100m3-150m3:
P2,700.00/
P3,300.00
>150m3:
P3,300.00
P3,900.00
4 Proceed to Receive the application 5 minutes Receiving None None
Receiving Clerk officially Clerk
and have the
application
received by the Refer to the Regional
office Director

Regional Director refer the 1 day Regional None None


application to the Chief- Director
CPD for appropriate action

Chief-CPD refer the 1 hour Chief, None None


application to the Chief, Clearance
Discharge Permit and Permitting
Permit to Operate (DPPO) Division
Section

Chief, DPPO Section refers


the application to Case
Handler

Case Handler will process


the application, conduct
on-site inspection and
water sampling, and
request for additional
requirement if necessary 15 to Case None None
20 days Handler/Ch
ief-CPD
Case Handler prepares
Integrated Compliance
Inspection Report and
prepares the Discharge
Permit with corresponding
transmittal letter.
5 Affixes A two (2) original copies of
signature to the Permit reproduced by the
Permit Case Handler for signature

Case handler and DPPO


Chief initialize the Permit
and endorsed to Chief CPD

Chief, CPD affixes his


signature and endorses to
None
Regional Director

2 to Case None
Regional Director affixes 3 days Handler/Re
his signature cords
Officer

Records Section attaches


unique bar code to the
approved Permit and
releases the original to the
applicant / proponent