0% found this document useful (0 votes)
105 views3 pages

Project Manager Resume: Rajib Bhattacharya

Rajib Bhattacharya has over 10 years of experience in project management and coordination roles. He currently works as a planning and project manager leading a team of 3 graduate and 2 diploma engineers. His responsibilities include developmental activities like training on Primavera and SAP, project management, planning, scheduling, cost control, resource planning and construction planning. He has managed projects in various industries including power plants, pollution control systems, gas treatment facilities and more.

Uploaded by

Bonvik Dutta
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
105 views3 pages

Project Manager Resume: Rajib Bhattacharya

Rajib Bhattacharya has over 10 years of experience in project management and coordination roles. He currently works as a planning and project manager leading a team of 3 graduate and 2 diploma engineers. His responsibilities include developmental activities like training on Primavera and SAP, project management, planning, scheduling, cost control, resource planning and construction planning. He has managed projects in various industries including power plants, pollution control systems, gas treatment facilities and more.

Uploaded by

Bonvik Dutta
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

Rajib Bhattacharya

B.E (Mechanical Engg. )


Address :
35/U/1, Middle Road
Santoshpur, Flat No A2
Kolkata- 700075, WB
M : 09830408586 / 09830408586
E-mail ID: rajib_jgec@rediffmail.com

Experience in reverse chronological order:


1. Current job : McNally Bharat Engg. Company Ltd.
Experience : Project Management, Project Co-ordination, Single point
contact with Client and Consultant, Cost Control.
(Nov’2008 onwards)
2. Previous Organization: Alstom Prpjects
Experience : Two years in Project Management, Project Co-
ordination,
Single point contact with Client and Consultant, Cost
Control. (Since 2007 to 2008)
3. Previous Organization: Synergy
Experience : One and Half year in Engineering and Project Co
ordination (Since 2005 to 2007)

Current profile:
I am working as a planning and project manager. My group consists of three Graduate
engineers & two diploma engineer.
The major activities in my current job involve:
1. Developmental activities and roles :
A. I am the system administrator of Primavera enterprise version. I hold
periodic review and training sessions for the project management & procurement
professionals to increase the awareness of Primavera and to induce the working knowledge
of Primavera.
B. I am the main coordinators for PS and MM modules of SAP R3/4.6. I hold
periodic review and training sessions for the project management & procurement
professionals to increase the awareness of SAP. Currently I have developed and
implemented the methodology for project time control, inventory management, and
manpower management through SAP.
2. Project management : Co-ordination among different functionalities like engineering,
Procurement, Inspection, logistics, construction.
3. Project Planning & Scheduling: Planning for timely execution of the project, Monitoring
the schedule, generation of “S” curves and raising alarm for critical activities and
milestones.
4. Supply management : Making delivery schedule, follow-up with vendors and
Coordination with logistics department for supply of materials on time as per
delivery schedule.
5. Drawing & Document control : Making of drawing & document rolling plan and
continuous monitoring of the flow of drawing & documents for timely execution of
the project.
6. Cost control : Planning of cash flow for the project, Monitoring and analysis of cash flow,
Raising alarm in well advance in case of negative cash flow.
7. Resource planning : Planning for critical machineries ( Like heavy cranes, grading
equipment) for construction phase and planning for manpower deployment in
Engineering, procurement & project management functionalities and optimization
of resources from cost point of view.
8. Construction Planning : Planning for time schedule of civil construction and mechanical
erection and planning for the deployment of resources for both construction works.
9. Supporting activities : Supporting the marketing team of the unit for bidding of new
projects in respect of time and cost planning.
10. Vendor Load planning: Tracking loading for major fabricators ( Vendors ) and supporting
procurement department for placement of orders.

Major Projects handled:


1. 2X300 MW coal based power plant for Reliance Power Ltd. in India. (Currently
executing)
2. Installation of pollution control systems and product recovery systems (Hot & Wet
ESP, Bag filter and Reverse air bag house) for Hindustan Zinc Limited, Kuwait National
Petroleum Company, Jaypee Cement, Sterlite Industries Limited, Grasim Cement,
Koncola Copper ( Kenya ) etc.
3. Gas Treatment Center and Anode Bake Fume treatment center for HINDALCO,
BALCO & NALCO.
4. Dense Phase Soda ash Drying plant for Tata Chemicals
5. Cryogenic fuel preparation plant for ISRO
6. Supply, Installation, of HRSG for AESK (Shrilanka).

Skills developed :

1. Certification from “Primavera Inc.” on project planning & Thorough Knowledge and
hand on expertise of Primavera (Version 6) & MS-Projects.
2. Thorough Knowledge and hand on expertise of MM & PS module of SAP R3/4.6.
3. Materials & Inventory management through SAP.
4. Cash flow analysis & ‘S’-curve generation for monitoring different aspects of a project.
5. Knowledge of processes and documentations involved for various statutory requirements.

Academic Records & Profesional educations :


1. 1st Class with Honors in Mechanical Engineering ( 76% ) from Jadavpur University,
Kolkata in 2002.
2. Currently pursuing “Cost and Work Accountant” ( ICWA) degree.
3. Certification from “Primavera Inc.” as a qualified project planner.
4. 1st Division with star marks in Science ( 85% ) in 12th standard in 1998.
5. 1st Division with star marks ( 88% ) in 10th standard in 1996 from Hooghly collegiate
School, WB.

Other Academic achievements:

1. Ranked among the top ten students in the university level in graduation standard.
2. Ranked among the first 50 students in the state level in both 10th & 12th standard.
3. Selected in Regional Mathematical Olympiad in 1997.
4. Awarded 2nd prize in a national level application software development competition held
by IIT-Roorkee in 2002.

Extra Curricular Activities :

1. Scouting (Completed upto Rajyapal Award and participated in national integration camp)
2. Playing Guitter & Mouth Organ
3. Programmed twice in all India Radio on recitation.
4. Playing Table tennis.

Personal Information :

Date of Birth : 2nd November, 1979


Father’s Name : Mr. Pravat Kumar Misra
Physical Standard : Normal
E-mail ID : rudraprasadmisra@gmail.com
State of Domicile : West Bengal
Marital Status : Married
Contact : 09370543495

You might also like