VARIOUS DPWH PROPOSED PROJECTS

STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)


1 BAY DEDUCTION CONCEPT

TWO (2) STOREY TWELVE (12)


CLASSROOM SCHOOL BUILDING

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
63000
4500 9000 9000 9000 9000 9000 9000 4500
600 2100 1800 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1800 2100 600
1100 1000

4100

A
1200
1075

1175

1632
1674

2000
1987
1750

HDCP
HDCP
3150

3150
HE 1575
1250

SHE
1950

2818 CLASSROOM 1 CLASSROOM 2 CLASSROOM 3 CLASSROOM 4 CLASSROOM 5 CLASSROOM 6 2825


6600

7000
LANDING LANDING
4950

5167
9500
3850

3850
2575

STO.

B UP
1325
4100 UP
2500

2100

2500
1700 1500 1500 1500 1500 1500

C
UP UP
1575

1400

1200

1200
1200 3600 3600 1200

1 BAY TO BE REMOVED

TWO (2) STOREY TEN (10) CLASSROOM


SCHOOL BUILDING

1 2 3 4 5 6 7 8 9 10 11 12 13
54000
4500 9000 9000 9000 9000 9000 4500
600 2100 1800 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1800 2100 600
1100 1000

4100

A
1200
1075

1175

1632
1674

2000
1987
1750

HDCP
HDCP
3150

3150
HE 1575
1250

SHE
1950

2818 CLASSROOM 1 CLASSROOM 3 CLASSROOM 4 CLASSROOM 5 CLASSROOM 6 2825


6600

7000
LANDING LANDING
4950

5167
9500
3850

3850
2575

STO.

B UP
1325
4100 UP
2500

2100

2500

1700 1500 1500 1500 1500 1500

C
UP UP
1575

1400

1200

1200

1200 3600 3600 1200

NOTE: SAME WITH TWO (2) STOREY SIX (6) CLASSROOM SCHOOL BUILDING
TO TWO (2) STOREY FOUR (4) CLASSROOM SCHOOL BUILDING

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)

SUMMARY OF DEDUCTIONS (1 BAY)


ID DESCRIPTION UNIT QUANTITY REMARKS
COLUMN FOOTING
F-1 COLUMN FOOTING-1 EACH 2.00
F-2 COLUMN FOOTING-2 EACH 2.00
F-3 COLUMN FOOTING-3 EACH 2.00
COLUMN
C-1 COLUMN-1 EACH 2.00
C-2 COLUMN-2 EACH 2.00
C-3 COLUMN-3 EACH 2.00
STIFF STIFFENER EACH 2.00
FOOTING TIE BEAM
TG-1 FOOTING TIE BEAM-1 EACH 2.00
TG-2 FOOTING TIE BEAM-2 EACH 2.00
TG-3 FOOTING TIE BEAM-3 EACH 6.00
SLAB ON GRADE
SOF SLAB ON FILL M2 9.0 x 9.50
FLOOR BEAM
G1 - EACH 2.00
G2 - EACH 2.00
G3 - EACH 2.00
G6 - EACH 2.00
G7 - EACH 2.00
B1 - EACH 2.00
SECOND FLOOR SLAB
S1 SECOND FLOOR SLAB-1 EACH 4.00
S2 SECOND FLOOR SLAB-2 EACH 2.00
SUNBREAKER
SUNBREAKER EACH 2.00
ROOF BEAM
RG1 ROOF BEAM-1 (4.10M) EACH 6.00
RG1 ROOF BEAM-1 (2.10M) EACH 2.00
RG2 ROOF BEAM-2 EACH 2.00
DOORS, WINDOWS AND OTHER
D1 DOOR-1 EACH 4.00
W1 WINDOW-1 EACH 4.00
W2 WINDOW-2 EACH 4.00
BLACKBOARD - EACH 2.00

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)
INDIVIDUAL PROGRAM OF WORK
(1 BAY DEDUCTION)
SCOPE OF WORK UNITS QUANTITY REMARKS
I. Mobilization l.s.
II. Temporary Facilities l.s.
III. Safety and Health
Item SPL-1 Personal Protective Equipment (PPE) md
Item SPL-2 Safety and Health md
Item SPL-3 Signages and Barricades sets
IV. Earthworks
Item 803 (1) Excavation of Column Footing & Wall Footing m3 37.31
Item 804 (1) a Backfilling of Excavated Materials m3 23.38
Item 804 (3) Gravel Bedding @ CF, WF, TG, SOF m3 12.14
Item 804 (1) b Embankment m3 47.81
V. Termite Control Works
Item 1000 (1) Soil Poisoning liter 40.29
VI. Concrete Works
Item 900 (1) c1 R.C. for Stair m3 0.00
Item 404 (1) a Rein. Steel for Stair kg. 0.00
Item 900 (1) c1 R.C. Sun Breaker m3 0.68
Item 404 (1) a Rein. Steel for Sun Breaker kg. 68.52
Item 900 (1) c2 R.C. for Column Footing & WF m3 8.16
Item 404 (1) a Rein. Steel for Column Footing & WF kg. 630.70
Item 900 (1) c2 R.C. for SOF, Corridor and Ramp m3 8.98
Item 404 (1) a Rein. Steel for SOF, Corridor and Ramp kg. 271.07
Item 900 (1) c3 R.C. for Footing Tie Beam m3 6.30
Item 404 (1) a Rein. Steel for Footing Tie Beam kg. 1253.50
Item 900 (1) c4 R.C. for Column, PC & Stiffener m3 8.39
Item 404 (1) a Rein. Steel for Column, PC & Stiffener kg. 3628.98
3
Item 900 (1) c5 R.C. for Second Floor Slab m 7.48
Item 404 (1) a Rein. Steel for Second Floor Slab kg. 920.39
Item 900 (1) c5 R.C. for Floor Beam m3 5.35
Item 404 (1) a Rein. Steel for Floor Beam kg. 1278.19
3
Item 900 (1) c5 R.C. for Water Tank Deck m 0.00
Item 404 (1) a Rein. Steel for Water Tank Deck kg. 0.00
3
Item 900 (1) c6 R.C. for RG and LRB m 3.95
Item 404 (1) a Rein. Steel for RG and LRB kg. 854.81
VII. Masonry Works
2
Item 1046 (2) a1 Masonry Units (100mm Wall) m 17.43
Item 1046 (2) a2 Masonry Units (150mm Wall) m2 119.24
VIII. Fabricated Materials and Hardwares
(0.90 x 2.40m) Mahogany Panel Door with
Item 1010 (2) b complete hardware & accessories (D-1) m2 8.64
- cylinder type lockset
50x150mm thk Mahogany Door Jamb with Fixed
Item 1010 (1) sets 4.00
Clear Glass Transom (D-1)
(0.90 x 2.10m) Hollow Core Flush Type Swing
Door with Marine Plywood Facing Inside and
2
Item 1010 (2) a Ordinary Outside with Stainless Steel Kicking m 0.00
Plate with complete hardware & accessories
(D-2)
Item 1010 (1) 50x150mm thk Mahogany Door Jamb (D-2) sets 0.00
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)

SCOPE OF WORK UNITS QUANTITY REMARKS


(0.80 x 2.10m) Hollow Core Flush Type Swing
Door with Marine Plywood Facing Inside and 2
Item 1010 (2) a m 0.00
Ordinary Outside and with complete hardware &
accessories (D-3)
Item 1010 (1) 50x100mm thk Concrete Door Jamb (D-3) sets 0.00
(0.70 x 2.10) Hollow Core Flush Type Swing Door
2
Item 1010 (2) a with complete hardware & accessories m 0.00
(D-4)

Item 1010 (1) 50x100mm Concrete Door Jamb (D-4) sets 0.00
(0.60 x 1.20) Bar Door complete with hardware &
Item 1010 (2) a
accessories (BD-1) m2 0.00

50x100mm Hollow Core Flush Type Door Jamb


Item 1010 (1) sets 0.00
(BD-1)
(3.6 x 1.7m) Steel Casement Window
Item 1005 (6) l.s. 4.00
6mm thk Clear Glass (W-1)
(1.60 x 1.70m) Jalousie Windows with Clear Glass
Blades on Standard Jalouplus Casing on
Item 1009 (1) a
50x150mm Concrete Jamb Complete with m2 10.88
Hardware and Accessories (W-2)
(1.90x 0.635m) Jalousie Windows with Clear
Glass Blades on Standard Jalouplus Casing on
Item 1009 (1) a
50x150mm Mahogany Jamb Complete with m2 0.00
Hardware and Accessories (W-3)
(1.60 x 0.635m) Jalousie Windows with 5mm thk
Clear Glass Blades on Standard Jalouplus Casing
Item 1009 (1) a on 50x150mm Mahogany Jamb Complete with m2 0.00
Hardware and Accessories
(W-3a)
(0.60 x 0.635m) Jalousie Windows with Clear
Glass Blades on Standard Jalouplus Casing on
Item 1009 (1) a
50x150mm thk Mahogany Jamb Complete with m2 0.00
Hardware and Accessories (W-4)
Item SPL-4 Blackboard sets 2
Item SPL-5 Fire Escape l.s. 0
Item SPL-6 Rail Guard l.s. 0
IX. Finishing Works
2
Item 1018 (1) 200x200mm Vitrified Glazed Tiles Wall Finish m 0.00
2
Item 1018 (2) 200x200mm Vitrified Unglazed Tiles Floor Finish m 0.00
Item 1021 (1) a Plain Cement Finish with floor hardener non-skid m2 160.82
Item 1021 (5) Non-skid Cement Floor Finish w/ 6mm groove lines m2 0.00
Item 1027 (1) Plain Cement Plaster Finish m2 530.61
X. Carpentry Works
2
Item 1003 Carpentry for Ceiling with Insulation m 95.08
XI. Roof and Framing Works
Item 403 (5) Steel Trusses and Lateral Struts kg. 1350.47
Item 403 (5) Purlins and Channel Beam kg. 1232.06
Item 403 (5) Purlins (Ceiling Support) kg. 281.40
Item 403 (5) Angular Base Plate kg. 0.00
Item 403 (5) Sag Rod kg. 45.49
Item 404 (1) a Cross-Bracing kg. 100.49
2
Item 1013 (1) Pre-painted Metal Sheets (0.50mm) m 119.28
SPL 905 Turn Buckle ea. 8.00
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)

SCOPE OF WORK UNITS QUANTITY REMARKS


XII. Painting Works
Item 1032 (1) a Masonry Painting m2 607.05
Item 1032 (1) b Wooden Painting m2 28.78
2
Item 1032 (1) c Metal Painting m 12.59
XIII. Electrical Works
Item 1100 Conduits, Boxes and Fittings l.s. w/ backup
Item 1101 Wires and Wiring Devices l.s. w/ backup
Item 1102 Panel Board and Cabinets l.s. w/ backup
Item 1103 Lighting Fixtures l.s. w/ backup
Item 1208 Fire Alarm System l.s. w/ backup
XIV. Plumbing / Sanitary Works
Item 1001 Sewer Line Works l.s. w/ backup
Item 1001 (9) Downspout/ Storm Drainage l.s. w/ backup
Item 1002 Cold Waterline Works l.s. w/ backup
Item 1002 Sanitary Fixtures l.s. w/ backup
Item SPL-7 Septic Tank l.s. w/ backup
Item SPL-8 Catch Basin unit w/ backup
XV. Mechanical Works
Item SPL-9 Fire Protection System l.s. w/ backup

NOTE: THE QUANTITIES OF VARIOUS WORK ITEMS INVOLVED ARE SUBJECT TO DECREASE
OR INCREASE DEPENDING ON THE ACTUAL CONSTRUCTION
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)
EARTHWORKS AND TERMITE CONTROL WORKS

SUMMARY
ITEM ID DESCRIPTION UNITS QUANTITY REMARKS
3
Item 803 (1) Excavation of Column Footing & WF m 37.31
3
Item 804 (1) a Backfilling of Excavated Materials m 23.38
3
Item 804 (1) b Embankment m 47.81
3
Item 804 (3) Gravel Bedding @ CF, WF, GT, SOF m 12.14
Item 1000 (1) Soil Poisoning liter 40.29

A. Item 803 (1) Excavation of Column Footing & WF

ID DESCRIPTION LENGTH WIDTH DEPTH VOLUME NUMBER TOTAL VOLUME


C1-F1 COLUMN FOOTING 1 1.40 1.40 1.60 3.14 2 6.27
C2-F2 COLUMN FOOTING 2 2.30 2.30 1.60 8.46 2 16.93
C3-F3 COLUMN FOOTING 3 2.10 2.10 1.60 7.06 2 14.11
WF-1 WALL FOOTING-1 10.35 0.40 0.50 2.07 0 0.00
TOTAL= 37.31

SUMMARY: Excavation of Column Footing & WF 37.31 cu. m

B. Item 804 (1) a Bacfilling of Excavated Materials

ID DESCRIPTION LENGTH WIDTH HEIGHT VOLUME NUMBER TOTAL VOLUME


C1 COLUMN-1 0.40 0.40 1.15 0.18 2 0.37
C2 COLUMN -2 0.40 0.40 1.15 0.18 2 0.37
C3 COLUMN -3 0.40 0.40 1.15 0.18 2 0.37
F1 COLUMN FOOTING-1 1.40 1.40 0.45 0.88 2 1.76
F2 COLUMN FOOTING-2 2.30 2.30 0.45 2.38 2 4.76
F3 COLUMN FOOTING-3 2.10 2.10 0.45 1.98 2 3.97
WF-1 WALL FOOTING-1 10.35 0.40 0.2 0.83 0 0.00
WALL RAMP WALL 10.35 0.15 0.2 0.31 0 0.00
TOTAL= 11.60

VOLUME VOLUME VOLUME


ID DESCRIPTION TOTAL VOLUME
EXCAVATION STRUCTURE GRAVEL
C1 COLUMN-1 6.27 2.13 0.39 3.75
C2 COLUMN -2 16.93 5.13 1.06 10.74
C3 COLUMN -3 14.11 4.34 0.88 8.89
WF-1 WALL FOOTING-1 0.00 0.00 0.00 0.00
TOTAL= 23.38

SUMMARY: Backfilling of Excavated Materials 23.38 cu. m

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)
C. Item 804 (3) Gravel Bedding @ CF, WF, TG, SOF

ID DESCRIPTION LENGTH WIDTH GRAVEL VOLUME NUMBER TOTAL VOLUME


F-1 COLUMN FOOTING-1 1.40 1.40 0.10 0.20 2 0.39
F-2 COLUMN FOOTING-2 2.30 2.30 0.10 0.53 2 1.06
F-3 COLUMN FOOTING-3 2.10 2.10 0.10 0.44 2 0.88
WF-1 WALL FOOTING-1 10.35 0.40 0.10 0.41 0 0.00
TG-1 FOOTING TIE BEAM-1 2.10 0.30 0.10 0.06 2 0.13
TG-2 FOOTING TIE BEAM-2 6.60 0.30 0.10 0.20 2 0.40
TG-3 FOOTING TIE BEAM-3 4.10 0.30 0.10 0.12 6 0.74
RAMP 5.15 1.40 0.10 0.72 0 0.00
SLAB ON FILL 9.00 9.50 0.10 8.55 1 8.55
STAIR ON GRADE 8.60 0.50 0.10 0.43 0 0.00
TOTAL= 12.14

SUMMARY: Gravel Bedding @ CF, WF, TG, SOF 12.14 cu. m

D. Item 804 (1) b Embankment

AREA: 9.65 9.00 86.85 m2 0.63 = 54.72

ID DESCRIPTION LENGTH WIDTH HEIGHT VOLUME NUMBER TOTAL VOLUME


C1 COLUMN-1 0.40 0.40 0.63 0.10 2 0.20
C2 COLUMN -2 0.40 0.40 0.63 0.10 2 0.20
F-3 COLUMN -3 0.40 0.40 0.63 0.10 2 0.20
TOTAL= 0.60

ID DESCRIPTION LENGTH WIDTH HEIGHT VOLUME NUMBER TOTAL VOLUME


TG-1 FOOTING TIE BEAM-1 2.10 0.30 0.50 0.32 2 0.63
TG-2 FOOTING TIE BEAM-2 6.60 0.30 0.50 0.99 2 1.98
TG-3 FOOTING TIE BEAM-3 4.10 0.30 0.50 0.62 6 3.69
TOTAL= 6.30

STRUCTURE LENGTH WIDTH HEIGHT ADD VOLUME


RAMP 5.154 1.40 0.15 0.00 0.00
TOTAL 0.00

SUMMARY: Embankment 47.81 cu. m

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)
E. Item 1000 (1) Soil Poisoning

ID DESCRIPTION LENGTH WIDTH SIDE N TOTAL AREA


COLUMN FOOTING-1 1.40 1.40 1 2 3.92
F-1
COLUMN FOOTING-1 1.60 1.40 4 2 17.92
COLUMN FOOTING-2 2.30 2.30 1 2 10.58
F-2
COLUMN FOOTING-2 1.60 2.30 4 2 29.44
COLUMN FOOTING-3 2.10 2.10 1 2 8.82
F-3
COLUMN FOOTING-3 1.60 2.10 4 2 26.88
WF-1 WALL FOOTING-1 10.35 0.40 1 0 0.00
TG-1 FOOTING TIE BEAM-1 2.50 0.40 1 2 2.00
TG-2 FOOTING TIE BEAM-2 7.00 0.40 1 2 5.60
TG-3 FOOTING TIE BEAM-3 4.50 0.40 1 6 10.80
SLAB AREA 9.00 9.50 1 1 85.50
RAMP 5.15 1.40 1 0 0.00
STAIR ON GRADE 8.60 0.50 1 0 0.00
TOTAL= 201.46

SUMMARY: Soil Poisoning 201.46 sq.m.

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)

CONCRETE WORKS

SUMMARY
ITEM ID DESCRIPTION UNITS QUANTITY REMARKS
3
Item 900 (1) c1 R.C. for Stairs m 0.00
Item 404 (1) a Rein. Steel for Stair kgs. 0.00
3
Item 900 (1) c1 R.C. for Sun Breaker m 0.68
Item 404 (1) a Rein. Steel for Sun Breaker kgs. 68.52
3
Item 900 (1) c2 R.C. for Column Footing & WF m 8.16
Item 404 (1) a Rein. Steel for Column Footing & WF kgs. 630.70
Item 900 (1) c2 R.C. for SOF, Corridor & Ramp m3 8.98
Item 404 (1) a Rein. Steel for SOF, Corridor & Ramp kgs. 271.07
3
Item 900 (1) c3 R.C. for Footing Tie Beam m 6.30
Item 404 (1) a Rein. Steel for Footing Tie Beam kgs. 1253.50
3
Item 900 (1) c4 R.C. for Column, PC & Stiffener m 8.39
Item 404 (1) a Rein. Steel for Column, PC & Stiffener kgs. 3628.98
3
Item 900 (1) c5 R.C. for Second Floor Slab m 7.48
Item 404 (1) a Rein Steel for Second Floor Slab kgs. 920.39
Item 900 (1) c5 R.C. for Floor Beam m3 5.35
Item 404 (1) a Rein. Steel for Floor Beam kgs. 1278.19
3
Item 900 (1) c5 R.C. for Water Tank Deck m 0.00
Item 404 (1) a Rein. Steel for Water Tank Deck kgs. 0.00
Item 900 (1) c6 R.C. for RG & LRB m3 3.95
Item 404 (1) a Rein. Steel for RG & LRB kgs. 854.81

A. Item 900 (1) c2 R.C. for Column Footing and WF

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)

ID DESCRIPTION LENGTH WIDTH HEIGHT VOLUME NUMBER TOTAL VOLUME


F-1 COLUMN FOOTING-1 1.40 1.40 0.35 0.69 2 1.37
F-2 COLUMN FOOTING-2 2.30 2.30 0.35 1.85 2 3.70
F-3 COLUMN FOOTING-3 2.10 2.10 0.35 1.54 2 3.09
WF-1 WALL FOOTING-1 20.70 0.40 0.20 1.66 0 0.00
WF-2 WALL FOOTING-2 32.20 0.45 0.15 2.17 0 0.00
TOTAL= 8.16

SUMMARY: R.C. for Column Footing and WF 8.16 cu. m

Item 404 (1) a Rein Steel for Column Footing and WF

ID DESCRIPTION PCS LENGTH WT/M NUMBER TOTAL WEIGHT


Mn. Bar(20 mm Ø) 7 1.68 2.466 2 58.00
F-1
Mn. Bar(20 mm Ø) 7 1.68 2.466 2 58.00
Mn. Bar(20 mm Ø) 11 2.58 2.466 2 139.97
F-2
Mn. Bar(20 mm Ø) 11 2.58 2.466 2 139.97
Mn. Bar(20 mm Ø) 10 2.38 2.466 2 117.38
F-3
Mn. Bar(20 mm Ø) 10 2.38 2.466 2 117.38
Ties(12mm Ø) 53 0.50 0.888 0 0.00
WF-1
Main Bars(12mm Ø) 3 20.70 0.888 0 0.00
Ties(12mm Ø) 82 1.32 0.888 0 0.00
WF-2
Main Bars(12mm Ø) 3 32.20 0.888 0 0.00
TOTAL= 630.70

SUMMARY: Rein Steel for Column Footing WF 630.70 kgs.

B. Item 900 (1) c3 R.C. for Footing Tie Beam

ID DESCRIPTION LENGTH WIDTH HEIGHT NUMBER TOTAL VOLUME


TG-1 FOOTING TIE BEAM-1 2.10 0.30 0.50 2.00 0.63
TG-2 FOOTING TIE BEAM-2 6.60 0.30 0.50 2.00 1.98
TG-3 FOOTING TIE BEAM-3 4.10 0.30 0.50 6.00 3.69
TOTAL= 6.30

SUMMARY: R.C. for Footing Tie Beam 6.30 cu. m

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)

Item 404 (1) a Rein. Steel for Footing Tie Beam

ID DESCRIPTION PCS LENGTH WT/M NUMBER TOTAL WEIGHT


Top Bar(20 mm Ø) 3 3.020 2.466 2 44.68
Bottom Bar(20 mm Ø) 3 3.020 2.466 2 44.68
TG-1,,2units Web(12 mm Ø) 2 2.660 0.888 2 9.45
Mid(20 mm Ø) 1 1.233 2.466 2 6.08
Stirrups(10 mm Ø) 19 1.480 0.616 2 34.64
Top Bar(20 mm Ø) 3 7.520 2.466 2 111.27
Bottom Bar(20 mm Ø) 3 7.520 2.466 2 111.27
TG-2,2units Extra Top 1(20 mm Ø) 1 2.633 2.466 2 12.99
Extra Top 2(20 mm Ø) 1 3.153 2.466 2 15.55
Web(12 mm Ø) 2 7.160 0.888 2 25.43
Stirrups(10 mm Ø) 49 1.480 0.616 2 89.34
Top Bar(20 mm Ø) 3 5.020 2.466 0 0.00
TG-3 (Ends),0units Bottom Bar(20 mm Ø) 3 5.020 2.466 0 0.00
Web(12 mm Ø) 2 4.660 0.888 0 0.00
Stirrups(10 mm Ø) 29 1.480 0.616 0 0.00
Top Bar(20 mm Ø) 3 4.500 2.466 6 199.75
Bottom Bar(20 mm Ø) 3 4.500 2.466 6 199.75
TG-3 (Mids),6units Splice Allowance(20 mm Ø) 72 0.800 2.466 1 142.04
Web(12 mm Ø) 2 4.500 0.888 6 47.95
Stirrups(10 mm Ø) 29 1.480 0.616 6 158.63
TOTAL= 1253.50

SUMMARY: Rein Steel for Footing Tie Beam 1253.50 kgs.

C. Item 900 (1) c4 R.C. for Column, PC and Stiffener

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)

ID DESCRIPTION LENGTH WIDTH HEIGHT VOLUME NUMBER TOTAL VOLUME


C-1 COLUMN -1 0.40 0.40 8.48 1.36 2 2.71
C-2 COLUMN -2 0.40 0.40 8.48 1.36 2 2.71
C-3 COLUMN -3 0.40 0.40 8.48 1.36 2 2.71
PC-1 POSTING COLUMN-1 0.30 0.25 1.45 0.11 0 0.00
STIFF STIFFENER 0.15 0.30 2.80 0.13 2 0.25
TOTAL= 8.39

SUMMARY: R.C. for Column, PC and Stiffener 8.39 cu. m

Item 404 (1) a Rein. Steel for Column, PC & Stiffener

ID BAR PCS LENGTH WT/M N TOTAL WEIGHT


Vertical Bars 1(20 mm Ø) 8 10.990 2.466 2 433.62
Column 1 Ties 1(10 mm Ø) 91 1.480 0.616 2 165.93
Ties 21(10 mm Ø) 91 1.105 0.616 2 123.88
Vertical Bars1(25 mm Ø) 14 6.760 3.854 2 729.49
Vertical Bars2(25 mm Ø) 12 4.410 3.854 2 407.91
Column 2 GrdTies11(10 mm Ø) 91 1.480 0.616 2 165.93
GrdTies21(10 mm Ø) 124 1.134 0.616 2 173.24
GrdTies31(10 mm Ø) 56 1.240 0.616 2 85.55
Vertical Bars11(25 mm Ø) 12 6.760 3.854 2 625.27
Vertical Bars2(25 mm Ø) 8 4.410 3.854 2 271.94
Column 3 Ties11(10 mm Ø) 91 1.480 0.616 2 165.93
Ties21(10 mm Ø) 114 1.134 0.616 2 159.27
Ties31(10 mm Ø) 34 1.105 0.616 2 46.29
Vertical Bars1(12 mm Ø) 4 3.250 0.888 0 0.00
PC-1
Ties1(10 mm Ø) 18 0.780 0.616 0 0.00
Vertical Ground Floor1(12 mm Ø) 4 7.276 0.888 2 51.69
Stiffener
Ties1(10 mm Ø) 24 0.780 0.616 2 23.06
TOTAL= 3628.98

SUMMARY: Rein Steel for Column, PC & Stiffener 3628.98 kgs.

D. Item 900 (1) c6 R.C. for RG and Lintel Roof Beam

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)

ID DESCRIPTION LENGTH WIDTH HEIGHT N TOTAL VOLUME


ROOF BEAM -1 (Long) 4.10 0.20 0.40 6 1.97
RG-1
ROOF BEAM -1 (Short) 2.10 0.20 0.40 2 0.34
RG-2 ROOF BEAM -2 6.60 0.25 0.50 2 1.65
LRB-1 LINTEL ROOF BEAM 8.00 0.20 0.25 0 0.00
TOTAL= 3.95

SUMMARY: R.C. for RG and Lintel Roof Beam 3.95 cu. m

Item 404 (1) a Rein. Steel for RG and LRB

ID BAR PCS LENGTH WT/M N TOTAL WEIGHT


Top Bar(20 mm Ø) 2 3.02 2.466 2 29.79
RG-1, 2.5m (2units) Bottom Bar(20 mm Ø) 2 3.02 2.466 2 29.79
Stirrups(10 mm Ø) 19 1.18 0.616 2 27.62
0.00
RG-1, 4.5m (6units), Top Bar(20 mm Ø) 2 5.02 2.466 0
ends Bottom Bar(20 mm Ø) 2 5.02 2.466 0 0.00
Stirrups(10 mm Ø) 29 1.18 0.616 0 0.00
Top Bar(20 mm Ø) 2 4.50 2.466 6 133.16
RG-1, 4.5m Bot Bar(20 mm Ø) 2 4.50 2.466 6 133.16
(36units), mids Splice Allowance(20 mm Ø) 48 0.80 2.466 0.20 18.94
Stirrups(10 mm Ø) 29 1.18 0.616 6 126.48
Top Bar(20 mm Ø) 2 7.52 2.466 2 74.18
BotBar(20 mm Ø) 3 7.52 2.466 2 111.27
RG-2, 7.0m (2units) Web(12 mm Ø) 2 7.16 0.888 2 25.43
Extra Top 1(20 mm Ø) 3 2.50 2.466 2 36.99
Extra Top 2 (End)(20 mm Ø) 2 3.02 2.466 2 29.79
Stirrups(10 mm Ø) 46 1.38 0.616 2 78.21
Top Bar(16 mm Ø) 2 7.59 1.579 0 0.00
LRB Bot Bar(16 mm Ø) 2 7.59 1.579 0 0.00
Stirs(10 mm Ø) 41 0.78 0.616 0 0.00
TOTAL= 854.81

SUMMARY: Rein Steel for RG and LRB 854.81 kgs.

E. Item 900 (1) c2 R.C. for SOF, Corridor and Ramp

ID DESCRIPTION LENGTH WIDTH THK VOLUME NUMBER TOTAL VOLUME


SOF SLAB ON FILL 9.00 9.50 0.10 8.55 1 8.55
RAMP RAMP 5.18 1.40 0.13 0.91 0 0.00
THK SLAB 18.00 0.25 0.10 0.45 1 0.45
LESS COLUMNS= 0.02
TOTAL= 8.98

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)

SUMMARY: R.C. for SOF, Corridor and Ramp 8.98 cu. m

Item 404 (1) a Rein. Steel for SOF, Corridor and Ramp

ID BAR PCS LENGTH WT/M N TOTAL WEIGHT


Short Direction(10 mm Ø) 25 9.00 0.616 1 138.60
SOF (63.0 x 9.5)
Long Direction(10 mm Ø) 23 9.35 0.616 1 132.47
Trans(10 mm Ø) 6 5.72 0.616 0 0.00
RAMP
Ramp Long(10 mm Ø) 21 1.32 0.616 0 0.00
TOTAL= 271.07

SUMMARY: Rein Steel for SOF, Corridor and Ramp 271.07 kgs.

F. Item 900 (1) c5 R.C. for Second Floor Slab

ID DESCRIPTION LENGTH WIDTH THK N TOTAL VOLUME


Suspended Slab 9.00 9.50 0.10 1 8.55
Less: Stairwell 3.85 2.80 0.10 0 0.00
Columns 0.40 0.40 0.10 1 0.02
Beam Top Area 1.05
TOTAL= 7.48
DEDUCTIONS
ID DESCRIPTION LENGTH WIDTH THK N TOTAL VOLUME
G3 +G1 4.10 0.25 0.10 2 0.21
BEAM B1+G2 4.10 0.25 0.10 4 0.41
G6+G7 8.70 0.25 0.10 2 0.44
TOTAL= 1.05

SUMMARY: R.C. for Second Floor Slab 7.48 cu. m

Item 404 (1) a Rein. Steel for Second Floor Slab

ID BAR PCS LENGTH WT/M N TOTAL WEIGHT


Bottom along 4.50m(10 mm Ø) 16 3.50 0.616 4 137.98
Top(10 mm Ø) 48 1.77 0.616 4 208.95
S-1
Bottom along 3.50m(10 mm Ø) 13 4.50 0.616 4 144.14
Top(10 mm Ø) 38 2.10 0.616 4 196.63

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)

Bottom along 4.50m(10 mm Ø) 16 3.50 0.616 2 68.99


Top(10 mm Ø) 32 1.43 0.616 2 56.51
S-2 (4.5x2.5m)
Bottom along 2.50m(10 mm Ø) 10 4.50 0.616 2 55.44
Top(10 mm Ø) 20 2.10 0.616 2 51.74
Bottom along 4.50m(10 mm Ø) 16 3.50 0.616 0 0.00
Top(10 mm Ø) 32 1.63 0.616 0 0.00
S-2 (4.5x3.1m)
Bottom along 3.10m(10 mm Ø) 12 4.50 0.616 0 0.00
Top(10 mm Ø) 24 2.10 0.616 0 0.00
Bottom along 4.50m 16 3.50 0.616 0 0.00
Top(10 mm Ø) 32 1.10 0.616 0 0.00
S-2 (4.5x1.5m)
Bottom along 1.50m(10 mm Ø) 6 4.50 0.616 0 0.00
Top(10 mm Ø) 12 2.10 0.616 0 0.00
TOTAL= 920.39

SUMMARY: Rein Steel for Second Floor Slab 920.39 kgs.

G. Item 900 (1) c5 R.C. for Floor Beam

ID DESCRIPTION LENGTH WIDTH HEIGHT N TOTAL VOLUME


G1 - 4.10 0.25 0.40 2 0.82
G2 - 4.10 0.25 0.40 2 0.82
G3 - 4.10 0.25 0.40 2 0.82
G3a - 4.10 0.25 0.40 0 0.00
G4 - 2.10 0.25 0.40 0 0.00
G5 - 6.60 0.25 0.50 0 0.00
G6 - 2.10 0.25 0.40 2 0.42
G7 - 6.60 0.25 0.50 2 1.65
B1 - 4.10 0.25 0.40 2 0.82
B2 - 3.75 0.20 0.40 0 0.00
STB-1 - 4.50 0.20 0.40 0 0.00
STB-2 - 3.00 0.20 0.40 0 0.00
CB-1 - 0.00 0.25 0.40 0 0.00
TOTAL= 5.35

SUMMARY: R.C. for Floor Beam 5.35 cu. m

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)

Item 404 (1) a Rein. Steel for Floor Beam

ID BAR PCS LENGTH WT/M N TOTAL WEIGHT


Top Bar(20 mm Ø) 2 5.02 2.466 0 0.00
G-15 (End Beams), Bottom Bar(20 mm Ø) 2 5.02 2.466 0 0.00
0units Extra Top 1(20 mm Ø) 1 1.67 2.466 0 0.00
Extra Top 2(20 mm Ø) 1 2.19 2.466 0 0.00
Stirrups(10 mm Ø) 31 1.18 0.616 0 0.00
Top Bar(20 mm Ø) 2 4.50 2.466 2 44.39
Bottom Bar(20 mm Ø) 2 4.50 2.466 2 44.39
G-1(Mid Beams), Splice Allowance(20 mm Ø) 48 0.80 2.466 0.20 18.94
2units Extra Top (20 mm Ø) 2 1.67 2.466 2 16.44
Extra Bottom(20 mm Ø) 1 2.66 2.466 2 13.12
Stirrups(10 mm Ø) 31 1.18 0.616 2 45.07
Top Bar(20 mm Ø) 2 5.02 2.466 0 0.00
Bottom Bar(20 mm Ø) 2 5.02 2.466 0 0.00
G-2 (End Beams), Extra Top 1(20 mm Ø) 2 1.67 2.466 0 0.00
0units Extra Top 2 (end)(20 mm Ø) 2 2.19 2.466 0 0.00
Extra Bottom (Midspan)(20 mm Ø) 1 2.66 2.466 0 0.00
Stirrups(10 mm Ø) 31 1.18 0.616 0 0.00
Top Bar(20 mm Ø) 2 4.50 2.466 2 44.39
Bottom Bar(20 mm Ø) 2 4.50 2.466 2 44.39
G-2(Mids), 2units Splice Allowance(20 mm Ø) 48 0.80 2.466 0.20 18.94
Extra Top (Support)(20 mm Ø) 4 1.67 2.466 2 32.88
Extra Bottom (Midspan)(20 mm Ø) 1 2.66 2.466 2 13.12
Stirrups(10 mm Ø) 31 1.18 0.616 2 45.07
Top Bar(20 mm Ø) 2 4.50 2.466 2 44.39
Bottom Bar(20 mm Ø) 2 4.50 2.466 2 44.39
G-3(Mids), 2units Splice Allowance(20 mm Ø) 48 0.80 2.466 0.20 18.94
Extra Top (Support)(20 mm Ø) 4 1.67 2.466 2 32.88
Extra Bottom (Midspan)(20 mm Ø) 1 2.66 2.466 2 13.12
Stirrups(10 mm Ø) 31 1.18 0.616 2 45.07
Top Bar(20 mm Ø) 2 5.02 2.466 0 0.00
Bottom Bar(20 mm Ø) 2 5.02 2.466 0 0.00
G-3a(End Beams), Web Bar(12 mm Ø) 4 4.66 0.888 0 0.00
0units Extra Top 1 (20 mm Ø) 1 1.67 2.466 0 0.00
Extra Top 2(Support)(20 mm Ø) 1 2.19 2.466 0 0.00
Stirrups(10 mm Ø) 25 1.18 0.616 0 0.00
Top Bar(20 mm Ø) 2 3.02 2.466 0 0.00
Bottom Bar(20 mm Ø) 2 3.02 2.466 0 0.00
G-4, 0units Extra Top 1(20 mm Ø) 3 1.13 2.466 0 0.00
Extra Top 2 (Support)(20 mm Ø) 1 0.40 2.466 0 0.00
Stirrups(10 mm Ø) 20 1.18 0.616 0 0.00

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)

Top Bar(20 mm Ø) 2 7.52 2.466 0 0.00


Bottom Bar(20 mm Ø) 3 7.52 2.466 0 0.00
Web Bar(12 mm Ø) 2 7.16 0.888 0 0.00
G-5, 0units Extra Top 1(20 mm Ø) 3 2.50 2.466 0 0.00
Extra Top 2 (end)(20 mm Ø) 3 3.02 2.466 0 0.00
Extra Bottom (Midspan)(20 mm Ø) 1 4.16 2.466 0 0.00
Stirrups(10 mm Ø) 44 1.38 0.616 0 0.00
Top Bar(20 mm Ø) 2 3.02 2.466 2 29.79
Bottom Bar(20 mm Ø) 2 3.02 2.466 2 29.79
G-6, 2units Extra Top (20 mm Ø) 3 1.13 2.466 2 16.77
Extra Bottom (Support)(20 mm Ø) 1 0.40 2.466 2 1.97
Stirrups(10 mm Ø) 20 1.18 0.616 2 29.08
Top Bar(20 mm Ø) 2 7.52 2.466 2 74.18
Bottom Bar(20 mm Ø) 3 7.52 2.466 2 111.27
Web Bar(12 mm Ø) 2 7.16 0.888 2 25.43
G-7, 2units Extra Top 1(20 mm Ø) 4 2.50 2.466 2 49.32
Extra Top 2 (end)(20 mm Ø) 4 3.02 2.466 2 59.58
Extra Bottom (Midspan)(20 mm Ø) 3 4.16 2.466 2 61.55
Stirrups(10 mm Ø) 46 1.38 0.616 2 78.21
Top Bar(20 mm Ø) 2 5.02 2.466 0 0.00
Bottom Bar(20 mm Ø) 2 5.02 2.466 0 0.00
B-1, 0units Extra Top 1(20 mm Ø) 2 1.67 2.466 0 0.00
Extra Top 2 (Support) 2 2.19 2.466 0 0.00
Stirrups(10 mm Ø) 29 1.18 0.616 0 0.00
Top Bar(16 mm Ø) 2 4.50 1.579 2 28.42
Bottom Bar(16 mm Ø) 2 4.50 1.579 2 28.42
B-1, 2units Extra Top (Support)(16 mm Ø) 4 1.67 1.579 2 21.05
Extra Bottom (Midspan)(16 mm Ø) 1 2.66 1.579 2 8.40
Stirrups(10 mm Ø) 31 1.18 0.616 2 45.07
Top Bar(16 mm Ø) 2 4.78 1.579 0 0.00
B-2,stair section, Bottom Bar(16 mm Ø) 2 4.78 1.579 0 0.00
0units Extra Bottom (Midspan)(16 mm Ø) 2 2.40 1.579 0 0.00
Stirrups(10 mm Ø) 32 1.18 0.616 0 0.00
0.00
CB-1,stair section, Top Bar(16 mm Ø) 4 4.88 1.579 0
0units Bottom Bar(16 mm Ø) 2 4.88 1.579 0 0.00
Stirrups(10 mm Ø) 32 1.18 0.616 0 0.00
Top Bar(16 mm Ø) 2 5.38 1.579 0 0.00
STB-1,stair section, Bottom Bar(16 mm Ø) 2 5.38 1.579 0 0.00
0units Extra Bottom (Midspan)(16 mm Ø) 2 2.16 1.579 0 0.00
Stirrups(10 mm Ø) 32 1.08 0.616 0 0.00
Top Bar(16 mm Ø) 2 3.88 1.579 0 0.00
STB-2,stair section, Bottom Bar(16 mm Ø) 2 3.88 1.579 0 0.00
0units Extra Bottom (Midspan)(16 mm Ø) 2 2.56 1.579 0 0.00
Stirrups(10 mm Ø) 24 1.18 0.616 0 0.00
TOTAL= 1278.19

SUMMARY: Rein. Steel for Floor Beam 1278.19 kgs.

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)

H. Item 900 (1) c1 R.C. for Stair

ID DESCRIPTION LENGTH WIDTH THK N TOTAL VOLUME


Stringer 6.15 1.50 0.20 0 0.00
Nosing 1.50 1.00 0.03 0 0.00
STAIR
Landing 1.23 3.00 0.20 0 0.00
DC-1 5.50 0.20 0.20 0 0.00
TOTAL= 0.00

ID DESCRIPTION LENGTH WIDTH THK N TOTAL VOLUME


Footing 8.60 0.40 0.13 0.00 0.00
STAIR ON GRADE
Steps/Stringer 8.60 1.00 0.08 0.00 0.00
TOTAL= 0.00

SUMMARY: R.C. for Stairs 0.00 cu. m

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)

Item 404 (1) a Rein. Steel for Stair

ID BAR PCS LENGTH WT/M N TOTAL WEIGHT


Main (Bot)Fdn to landing(16 mm Ø) 11 4.95 1.579 0 0.00
Main (Bot)Landing to 2nd(16 mm Ø) 11 3.04 1.579 0 0.00
Main (Top)Fdn to landing(16 mm Ø) 11 4.95 1.579 0 0.00
Stringer(incl.landing)
Main (Top)Landing to 2nd(16 mm Ø) 11 3.64 1.579 0 0.00
Landing(transverse)(12 mm Ø) 8 3.21 0.888 0 0.00
Transverse(main)(12 mm Ø) 38 1.42 0.888 0 0.00
Nosing (10 mm Ø) 114 0.64 0.616 0 0.00
Nosing Bars
Transverse(12 mm Ø) 19 5.00 0.888 0 0.00
Main Bars(10 mm Ø) 3 1.42 0.616 0 0.00
Stair Footing,2 units
Ties(10 mm Ø) 6 1.20 0.616 0 0.00
Footing(12 mm Ø) 6 0.41 0.888 0 0.00
DC-1,2 units Vertical Bars(16 mm Ø) 4 6.65 1.579 0 0.00
Ties(10 mm Ø) 58 0.68 0.616 0 0.00
Main Bars(10 mm Ø) 4 8.52 0.616 0 0.00
Nosing Bars(10 mm Ø) 36 0.60 0.616 0 0.00
Stair on Grade
Long(10 mm Ø) 36 1.16 0.616 0 0.00
Footing ties(10 mm Ø) 36 0.82 0.616 0 0.00
TOTAL= 0.00

SUMMARY: Rein. Steel for Stairs 0.00 kgs.

I. Item 900 (1) c1 R.C. for Sun Breaker

0.20
0.10

0.55

ID DESCRIPTION LENGTH WIDTH HEIGHT N TOTAL VOLUME


SUN BREAKER 4.10 0.55 0.15 2 0.68
TOTAL= 0.68

SUMMARY: R.C. for Sun Breaker 0.68 cu. m

Item 404 (1) a Rein. Steel for Sun Breaker

ID BAR PCS LENGTH WT/M N TOTAL WEIGHT


Main(10 mm Ø) 6 4.10 0.616 2 30.31
Tie 1(10 mm Ø) 18 0.79 0.616 2 17.59
Tie 2(10 mm Ø) 18 0.93 0.616 2 20.62
TOTAL= 68.52

SUMMARY: Rein Steel for Sun Breaker 68.52 kgs.

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)
MASONRY WORKS

SUMMARY
ITEM DESCRIPTION UNIT QUANTITY
Item 1046 (2) a1 Masonry Units (100mm Wall) m2 #REF!
Item 1046 (2) a2 Masonry Units (150mm Wall) m2 116.76

GFL UP TO FLOOR
FTB UP
GRID DESCRIPTION SHAPE LENGTH FLOOR BEAMS UP AREA 150 100
TO GFL
BEAMS TO RB
6 INTERIOR WALL RECTANGLE 6.60 0.325 2.80 2.80 39.11 39.11 0.00
A EXTERIOR WALL RECTANGLE 8.20 0.325 2.80 2.80 48.59 48.59 0.00
B INTERIOR WALL RECTANGLE 8.20 0.325 2.80 2.80 48.59 48.59 0.00
C CORRIDOR RECTANGLE 8.20 0.325 0.90 0.00 10.05 0.00 10.05
C-1 CORRIDOR RECTANGLE 8.20 0.000 0.00 0.90 7.38 0.00 7.38
TOTAL: 153.70 136.28 17.43
LESS OPENINGS: #REF! 116.76 #REF!

SUMMARY: Masonry Units (150mm Wall) 116.76 sq. m


Masonry Units (100mm Wall) #REF! sq. m

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)
FABRICATED MATERIALS AND HARDWARES

TOTAL
ID DESCRIPTION SETS AREA
AREA
MAHOGANY PANEL DOOR ON 50 x 150mm THK.
MAHOGANY JAMB WITH FIXED CLEAR GLASS
D-1 TRANSOM COMPLETE WITH HARDWARE AND 4 2.40 x 0.90 m. 8.64
ACCESSORIES CYLINDER TYPE LOCKSET

HOLLOW CORE FLUSH TYPE SWING DOOR WITH


MARINE PLYWOOD FACING INSIDE AND ORDINARY
D-2 OUTSIDE COMPLETE WITH HARDWARE AND 0 2.10 x 0.90 m. 0.00
ACCESSORIES PROVIDE KICK PLATE AND LEVER
TYPE LOCKSET

HOLLOW CORE FLUSH TYPE SWING DOOR WITH


MARINE PLYWOOD FACING INSIDE AND ORDINARY
D-3 OUTSIDE COMPLETE WITH HARDWARE AND 0 2.10 x 0.80 m. 0.00
ACCESSORIES CYLINDER DOOR KNOBS

SWING DOOR ON 50 x 100 mm thk CONCRETE DOOR


D-4 JAMB COMPLETE WITH HARDWARE ACCESSORIES 0 1.20 x 0.70 m. 0.00
AND DOOR BOLT

BAR DOOR ON 50 X 100 MM THK HOLLOW CORE


BD-1 FLUSH TYPE DOOR JAMB COMPLETE WITH 0 1.20 x 0.60 m. 0.00
HARDWARE AND ACCESSORIES

JALOUSIE WINDOWS WITH CLEAR GLASS BLADES


ON STANDARD JALOUPLUS CASING AND FIXED
W-1 CLEAR GLASS TRANSOM ON 50 x 150 MAHOGANY 4 3.60 x 1.70 m. 24.48
JAMB COMPLETE WITH HARDWARE AND
ACCESSORIES

JALOUSIE WINDOWS WITH CLEAR GLASS BLADES


ON STANDARD JALOUPLUS CASING AND FIXED
W-2 CLEAR GLASS TRANSOM ON 50 x 150 MAHOGANY 4 1.60 x 1.70 m. 10.88
JAMB COMPLETE WITH HARDWARE AND
ACCESSORIES

JALOUSIE WINDOWS WITH CLEAR GLASS BLADES


ON STANDARD JALOUPLUS CASING ON 50 x 150
W-3 MAHOGANY JAMB COMPLETE WITH HARDWARE 0 1.90 x 0.64 m. 0.000
AND ACCESSORIES

JALOUSIE WINDOWS WITH CLEAR GLASS BLADES


ON STANDARD JALOUPLUS CASING ON 50 x 150
W-4 MAHOGANY JAMB COMPLETE WITH HARDWARE 0 0.60 x 0.64 m. 0.000
AND ACCESSORIES

SPL-4 BLACK BOARD 2 4.88 x 1.30 m. 12.69


SPL-5 FIRE ESCAPE 0
SPL-6 RAIL GUARD 0

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)

FINISHING WORKS

SUMMARY
ITEM ID DESCRIPTION UNITS QUANTITY
Item 1018 (1) 200x200mm Vitrified Glazed Tiles Wall Finish m2 0.00
Item 1018 (2) 200x200mm Vitrified Unglazed Tiles Floor Finish m2 0.00
Item 1021 (1) a Plain Cement Finish with Floor Hardener non-skid m2 160.82
Item 1021 (5) Non-Skid Cement Floor Finish w/ 6mm groove lines m2 0.00
2
Item 1027 (1) Plain Cement Plaster Finish m 530.61

A. NON SKID PLAIN CEMENT FLOOR FINISH


DESCRIPTION LENGTH WIDTH LESS (WALLS)
LESS (TOILET) AREA
GROUND FLOOR 9.00 9.50 5.09 80.41
SECOND FLOOR 9.00 9.50 5.09 80.41

SUMMARY: Plain Cement Finish with Floor Hardener non-skid 160.82 sq. m

B. NON SKID PLAIN CEMENT FLOOR ROUGH FINISH WITH GROOVES


DESCRIPTION LENGTH WIDTH NUMBER AREA
RAMP 3.61 1.40 0.00 0.00
LANDING 1.55 1.40 0.00 0.00

SUMMARY: Non-Skid Cement Floor Finish w/ 6mm groove lines 0.00 sq. m

C. 200 x 200 VITRIFIED FLOOR TILES (UNGLAZED)

SUMMARY: 200x200mm Vitrified Unglazed Tiles Floor Finish 0.00 sq. m

D. 200 x 200 VITRIFIED WALL TILES (GLAZED)

SUMMARY: 200x200mm Vitrified Glazed Tiles Wall Finish 0.00 sq. m

E. PLAIN CEMENT PLASTER


DESCRIPTION ID LENGTH WIDTH DEDUCT N AREA
C-1 6.725 0.40 0.30 2 17.49
COLUMNS C-2 6.725 0.40 0.30 2 17.49
C-3 6.725 0.40 0.20 2 20.80
POSTING COLUMNS PC-1 2.50 0.30 0 0.00
FLOOR BEAMS 45.20
ROOF BEAMS 36.84
LINTEL ROOF BEAMS LRB-1 5.37 0.25 0 0.00
WALLS 307.40
CONCRETE SLAB 9.00 9.50 12.55 1 72.95
SUN BREAKERS 4.10 1.46 0.24 2 12.45
TOTAL: 530.61

SUMMARY: Plain Cement Plaster Finish 530.61 sq. m

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)

F. RAIL GUARD
DESCRIPTION IDLENGTH WIDTH DEDUCT N TOTAL
RAMP 0.000 0 0.00
GROUND 8.200 1 8.20
CORRIDOR
2ND 8.200 1 8.20
STAIRS 0.000 0 0.00

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)

PAINTING WORKS

SUMMARY
ITEM ID DESCRIPTION UNITS QUANTITY
Item 1032 (1) a Masonry Painting m2 607.05
2
Item 1032 (1) b Wooden Painting m 28.78
2
Item 1032 (1) c Metal Painting m 12.59

A. MASONRY PAINTING
DESCRIPTION ID LENGTH WIDTH DEDUCT/ADD N AREA
COLUMNS 55.77
POSTING COLUMNS 0.00
FLOOR BEAMS 45.20
ROOF BEAMS 36.84
"SEE PLASTER"
LINTEL ROOF BEAMS 0.00
WALLS 307.40
CONCRETE SLAB 72.95
SUN BREAKERS 12.45
CEILING 9.00 9.50 9.06 1 76.44
TOTAL: 607.05
SUMMARY: Masonry Painting 607.05 sq. m

B. WOODEN PAINTING
DESCRIPTION ID LENGTH WIDTH SIDES N AREA
D-1 2.40 0.90 2 4 17.28
D-2 2.10 0.90 2 0 0.00
DOORS D-3 2.10 0.80 2 0 0.00
D-4 1.20 0.60 2 0 0.00
D-5 2.10 0.70 2 0 0.00
D-1 5.70 0.25 - 4 5.70
D-2 5.10 0.25 - 0 0.00
DOOR JAMBS D-3 5.00 0.25 - 0 0.00
D-4 3.00 0.25 - 0 0.00
D-5 4.90 0.25 - 0 0.00
W-1 0.00 0.00 - 4 0.00
W-2 5.80 0.25 - 4 5.80
WINDOW JAMBS
W-3 5.07 0.25 - 0 0.00
W-4 2.47 0.25 - 0 0.00
TOTAL: 28.78
SUMMARY: Wooden Painting 28.78 sq. m

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)

C. METAL PAINTING
DESCRIPTION STRUCTURE LENGTH CIRCUM N AREA
RAMP 0.00 0.20 0 0.00
8.20 0.31 1 2.58
CORRIDOR
RAIL GUARD 6.16 0.10 1 0.62
0.00 0.31 0 0.00
STAIRS
0.00 0.08 0 0.00
13.20 0.09 4 4.75
Steel Casement W1
26.40 0.04 4 4.65
TOTAL: 12.59
SUMMARY: Metal Painting 12.59 sq. m

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)

CARPENTRY WORKS

SUMMARY
ITEM ID DESCRIPTION UNITS QUANTITY REMARKS
Item 1003 Carpentry Ceiling Works m2 95.08

Item to be
Calculations
Estimated
1003 Carpentry Ceiling Works

a) Ext. Ceiling; 16.82 Sq. m.

@ Left Eaves ;
A1= 6.52 x 1.00 x 0.60 = 3.91 Sq.m.
@ Center ;
A2= 1.00 x 1.00 x 9.00 = 9.00 Sq.m.
@ Right Eaves ;
A1= 6.52 x 1.00 x 0.60 = 3.91 Sq.m.
b) Int. Ceiling ; 78.26 Sq.m.
@ Center ;
A1= 9.10 x 8.60 = 78.26 Sq.m.

Total Area = 95.08 Sq.m.

c) 0.30mm x 11.75m Ceiling Ventilation;


No. = 4 Pcs.

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)
ROOF AND FRAMING WORKS

SUMMARY
ITEM DESCRIPTION UNIT QUANTITY REMARK
Item 403 (5) Steel Trusses and Lateral Struts kg 1350.47
Item 403 (5) Purlins and Channel Beam kg 1232.06
Item 403 (5) Purlins (Ceiling Support) kg 281.40
Item 403 (5) Angular Base Plate kg 0.00
Item 403 (5) Sag Rod kg 45.49
Item 404 (1) a Cross Bracing kg 100.49
Item 1013 (1) Pre-Painted Metal Sheets (0.50mm Total Coated) l.s. 119.28
SPL 905 Turn Buckle ea 8.00

Item to be
Calculations Remarks
Estimated

Item 1013 Pre-Painted Metal Sheet

NOTE: DISREGARD QUANTITY FOR TEK SCREWS. USE J-BOLTS= 597 pcs

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)
Item to be
Calculations
Estimated

Item 403 (a) Steel Truss


Total
Weight / Weight per
Member Mark No. & Size Length / cut Total Length No. of Units Weight
meter Truss
(Kgs.)
@ Main Truss (T-1) ;
TC 4 - L 75 x 75 x 6mm 6.540 26.160 6.870 179.719 2 359.44
BC 2 - L 75 x 75 x 6mm 9.560 19.120 6.870 131.354 2 262.71
V-1 2 - L 65 x 65 x 6mm 2.373 4.746 5.910 28.049 2 56.10
V-2 4 - L 50 x 50 x 6mm 1.787 7.148 4.470 31.952 2 63.90
V-3 4 - L 50 x 50 x 6mm 1.200 4.800 4.470 21.456 2 42.91
V-4 4 - L 50 x 50 x 6mm 0.639 2.556 4.470 11.425 2 22.85
D-1 4 - L 65 x 65 x 6mm 2.618 10.472 5.910 61.890 2 123.78
D-2 4 - L 50 x 50 x 6mm 2.040 8.160 4.470 36.475 2 72.95
D-3 4 - L 50 x 50 x 6mm 1.573 6.292 4.470 28.125 2 56.25
Eave Brackets 4 - L 65 x 65 x 6mm 0.619 2.476 5.910 14.633 2 29.27
4 - L 65 x 65 x 6mm 0.328 1.312 5.910 7.754 2 15.51
2 Sets of Truss 552.832 1,105.66
@ Gusset Plate;
T-1 1 - 6mm thk. Gusset Plate Area= 0.200 9.414 2 18.83
1 - 6mm thk. Gusset Plate 0.038 1.789 2 3.58
4 - 6mm thk. Gusset Plate 0.108 20.334 2 40.67
2 - 6mm thk. Gusset Plate 0.044 4.142 2 8.28
6 - 6mm thk. Gusset Plate 0.063 17.792 2 35.58
< 2 - 6mm thk. Gusset Plate 0.089 8.378 2 16.76
Eaves 2 - 6mm thk. Gusset Plate 0.188 17.698 2 35.40
@ Filler Plate @ midspan of members;
TC 10 - 6mm thk. Filler Plate Area= 0.007 3.088 2 6.18
BC 11 - 6mm thk. Filler Plate 0.007 3.397 2 6.79
Vert. & Diag.
12 6mm thk. Filler Plate 0.003 1.771 2 3.54
Members
-
Total 2 Sets of Truss 87.805 175.610
@ Steel Base Plate;
350 x 350 x 12mm thk.
Main Truss 3 - (1 - Truss only) 34.60 2 69.19
Steel Base Plate
16mm dia. X 350mm Long
12 - Anchor Bolts w/ Nut & 2 24 Pcs.
Washer
12mm dia. X 250mm Long
Bracket 4 - Anchor Bolts w/ Nut & 2 8 Pcs.
Washer

Total 2 Sets of Truss


Summary:
Main Truss = 1,105.66
Gusset Plate = 175.61
Steel Base Plate = 69.19
Total weight = 1,350.47 Kgs.

6/8/2017 4:34 PM
1 BAY DEDUCTION_2-storey_June 2017
VARIOUS DPWH PROPOSED PROJECTS
STANDARD TWO-STOREY SCHOOL BUILDING (1 BAY DEDUCTION)
Item 403 (b) Purlins
No. of Bay = 1 Provided by Purlins
Weight / Total Weight
Description No. & Size Length / cut Total Length Remarks
meter (Kgs.)

Purlins 28 - LC 150 x 65 x 20 x 2mm 9.00 252.00 4.76 1,199.52


Ceiling Support 3 - LC 100 x 50 x 12 x 2mm 9.00 27.00 3.35 90.45
Ceiling Support 6 - LC 100 x 50 x 12 x 2mm 9.50 57.00 3.35 190.95
G.I. Clip 56 - L 40 x 40 x 5 x 500mm - - 2.97 -
Clip Angle 56 - L 50 x 50 x 6 x 100mm 0.13 7.28 4.47 32.54
Steel Plate, 150 x 150 x
- 6mm (Splice PL -
Connector)

Total Weight of Purlins 1,513.46

Item 403 (c) Angular Base Plate No. of End = 0 Provided by L Base PL

Weight /
Location No. & Size Length / cut Total Length Total Weight Remarks
meter

L 100 x 100 x 6mm


@ Top of LRB-1 0 - Angular Base Plate @ 6.54 - 9.26 -
LRB
-
12mmØ x 150mm Long
0 - Vert. & Hor. Anchor Bolt w/
Nuts and Washer
Total of Angular Base Plate (Top of LTB-1) 26.16 - 4.99

Item 404 (a) Sag Rod


No. of Bay = 1 Provided by Sag rod
Weight / Total Weight
Location No. & Size Length / cut Total Length Remarks
meter (Kgs.)

Plain Round Bar 12mmØ


Sag rod 96 - Steel Sag Rod w/ nut & 0.50 48.00 0.888 42.62
washer
Plain Round Bar 12mmØ
8 - Steel Sag Rod w/ nut & 0.33 2.62 0.888 2.33
washer
Plain Round Bar 12mmØ
2 - Steel Sag Rod w/ nut & 0.30 0.60 0.888 0.53
washer

Total Weight of Sag Rod 51.22 45.49

Item 404 (b) Cross Bracing


No. of Bay = 1 Provided by X-Bracing
Weight / Total Weight
Location No. & Size Length / cut Total Length Remarks
meter (Kgs.)

Plain Round Bar 16mmØ


Cross Bracing 8 - 7.95 63.60 1.58 100.49
Steel Cross bracing

Steel Plate, 6 - 150 x 200 x


Buckle Plate - Kgs. -
12mm Buckle Plate

Total Weight of Cross Bracing 63.60 100.49

SPL 905 - Turn Buckle


No. of Bay = 1 Provided by Turn Buckle
8 - 16mm dia. Turn buckle @ one end only

6/8/2017 4:34 PM