Seder Construction Co.

FIRE EXTINGUISHER MONTHLY INSPECTION

LOCATION: HOSPITAL PROJECT, MAKKAH MONTH: April DATE 17-04-2016

CAPACITY/ VALIDITY
FIRE SHIELDED VISUAL LOCK INSPACTION PRESSURE DISCHARGE DISCHARGE
TYPE LOCATION ( 12 REMARKS/ACTION
EXT. No. FROM SUN SEAL PIN TAG GUAGE HOSE NOZZLE
(eg. 7KG CO2) MONTHS)
01 6Kg CO2 HSE Depts. 1 √ √ √ √ × √ √ Service Required
02 6Kg CO2 Accounts Depts. 1 √ √ √ √ × √ √ Service Required
03 6Kg CO2 Doc Controller 1 √ √ √ √ × √ √ Service Required
04 6Kg CO2 Smoking Zone 1 √ √ √ √ × √ √ Service Required
05 10Kg Powder Civil n Architecture 1 √ √ √ × √ × √ Service Required
06 12Kg Powder Electro Mechanical Depts. 1 √ √ √ × √ × √ Service Required
07 10Kg Powder Inspector 1 √ √ √ × √ × √ Service Required
08 7.5KgPowder Project 1 √ √ √ × √ × √ Service Required
09 12Kg Powder DOC n Meeting 1 √ √ √ × √ × √ Service Required
10 6Kg CO2 Store 1 √ √ √ × × √ √ Service Required

Visual Seal : Check for cracking/denting in the case Pressure Gauge : Check that the gauge is green not red
Lock Pin Check : Check that the lead seal on the wire clip which
holds the pin on the handle in place is not broken Discharge Hose : Check for cracking/denting in the case

Inspection Tag : Check that the sticker indicating last checking Discharge Nozzle : check to see if it is cracked/ broken
a detail of the extinguisher is in place.

Inspected by: Waheed Ahmad