LEGENDS:

√ √ √ √ √ √

y
nl
O
√ √ √

es
os
rp
Pu
√ √ √ √

√ √ √

g
in
dd NOTE:

· Equipment Design, Specifications and Technical Data Sheets as


per NTDC / MEPCO requirements is the sole responsibility of the
bi
EPC Bidder.
· Provision of future bays shall be considered in busbar protection
module in present scope of work.
r
Fo

√ √ √ √

2 Revised after client meeting 20-04-22 RT SB NA


1 Revised for corrections 23-03-22 RT SB NA
Rev: Description Date: Drawn Checked Approved

CLIENT:
DEFENCE HOUSING AUTHORITY (DHA) MULTAN
CONSULTANT:
OMS (PRIVATE) LIMITED
PROJECT TITLE:
50MW 132/11KV DHA MULTAN GIS SUBSTATION-4
SINGLE LINE DIAGRAM
(FOR TENDER PURPOSE ONLY)
Drawn: KH Checked: RT Approved: NA Sheet: 1 of 1
Date: 07/03/2022 Scale: Not to Scale (NTS) Rev: 1
File Ref/Title: Drawing No:
DHAMULTAN-SLD DHAMULTAN-GIS-SLD-01