Hazard 1-2
Hazard 1-2
Assess Primitive
Problem
Detailed Design,
Equipment sizing, Cap.
Cost Estimation,
Profitability Analysis,
Optimization
1
9/26/2009
Procurement,
Research Conceptual Preliminary Detailed
Construction,
Concept Design Design Design
Operation
Available Information
Chemistry + PFD + P&ID + Mech designs + Plot plans
MSDS info Equipment list Process control Instrument specs Isometrics
Vessel designs Metallurgy As built specs
Reactor models Detailed H&WB
Offsites
HS&E Analysis
•Process FMEA •HAZOP •Quantitative •As built
•MSDS Review •HAZAN •Emergency Risk Analysis HAZOP
•Major Hazard Review •PP Analysis Procedures •Fault Tree •Operator
•Effluent Summary Analysis training
2
9/26/2009
3
9/26/2009
4
9/26/2009
Deflagration
Combustion zone propagates at (subsonic) flame speed, usually < 30 m/s
Pressure wave generated usually < 10 bar
Principal heating mechanism is combustion
Detonation
Combustion zone propagates at supersonic velocity, 2000 – 3000 m/s
Pressure wave up to 20 bar
Principal heating mechanism is shock compression
Usually requires confinement or a high-intensity source
Deflagration can turn into detonation when propagating along a pipe
Expansion factor
Measure of the increase in volume resulting from combustion
E = (molar density of reagents)/(molar density of products)
Maximum value of E is for adiabatic combustion
Flame speed
The rate of propogation of a flame front through a flammable mixture, with
respect to a fixed observer
5
9/26/2009
6
9/26/2009
7
9/26/2009
From
Daniel R. Lewin
Department of Chemical Engineering
Technion
Technion,, Haifa, Israel
8
9/26/2009
9
9/26/2009
10
9/26/2009
4. Prevention.
How can we prevent the accident occurring, or
make it less probable or protect people from
the consequences?
7. Prevention ?
Perhaps our method of prevention has
disadvantages, and better methods can be
suggested. We should answer this question
before a table is made and a glass ordered.
11
9/26/2009
Select Line
Move on to next NO
Is more flow possible?
Deviation
Yes
Yes
12
9/26/2009
Yes
NO
What change in plan Will the operator know that there
will tell him? is more flow?
Yes
NO
Is the cost of change justified?
Yes
Consider other
Yes causes of more flow
Agree changes
Agree who is responsible for
actions
13
9/26/2009
14
9/26/2009
FI
37ᵒC
J1: Transfer pumps
36 psig
(one working, one spare)
Hydrocarbons from
intermediate storage Drain and N2 purge
15
9/26/2009
16
9/26/2009
17
9/26/2009
18
9/26/2009
19
9/26/2009
COMMISSIONING MANAGER
INSTRUMENT DESIGN ENGINEER
DESIGN ENGINEER
20