You are on page 1of 1

Scheduling :

T code /SAPAPO/SCH_GCM - Edit Conditions for Configurable Process Scheduling


Configurable process scheduling (CPS): Configuration in ECC and SCM :
Configuration
In the ECC,

Transportation Scheduling should be active for the sales document type.


The path is IMG--> Sales and Distribution--> Basic Functions--> Delivery Scheduling and
Transportation Scheduling--> Define Scheduling By Sales Document Type
Fig 06
In SCM

CPS Configuration starts with defining activities in the Schema and later CPS works on the
basic principle of Condition Technique.

1. Create Condition Table


2. Create Access Sequence
3. Assign Condition Table to Access Sequence
4. Create Condition Type.
5. Assign Access Sequence to Condition Type.
6. Create Procedure
7. Assign Condition Type to Procedure
8. Assign Procedure to Scheduling Schema and Activity Type
9. Create Condition Record.

IMG--> SCM Basis--> Configurable Process Scheduling--> Define Schema


Scheduling schema or procedure (eg. SCHEDL_SDD) is used within a process definition. The
procedure is used to control the behavior of scheduling of a sales order or STO.
There is no need of defining a new Z schema as standard SAP delivered schemas are good
enough.
Moreover SAP has hard coded Schemas in the scheduling programs

You might also like