T code /SAPAPO/SCH_GCM - Edit Conditions for Configurable Process Scheduling
Configurable process scheduling (CPS): Configuration in ECC and SCM : Configuration In the ECC,
Transportation Scheduling should be active for the sales document type.
The path is IMG--> Sales and Distribution--> Basic Functions--> Delivery Scheduling and Transportation Scheduling--> Define Scheduling By Sales Document Type Fig 06 In SCM
CPS Configuration starts with defining activities in the Schema and later CPS works on the basic principle of Condition Technique.
1. Create Condition Table
2. Create Access Sequence 3. Assign Condition Table to Access Sequence 4. Create Condition Type. 5. Assign Access Sequence to Condition Type. 6. Create Procedure 7. Assign Condition Type to Procedure 8. Assign Procedure to Scheduling Schema and Activity Type 9. Create Condition Record.
IMG--> SCM Basis--> Configurable Process Scheduling--> Define Schema
Scheduling schema or procedure (eg. SCHEDL_SDD) is used within a process definition. The procedure is used to control the behavior of scheduling of a sales order or STO. There is no need of defining a new Z schema as standard SAP delivered schemas are good enough. Moreover SAP has hard coded Schemas in the scheduling programs