You are on page 1of 1

1.

NOTES :-
1. ALL CIVIL WORK INCLUDING CONCRETE ENCASEMENT BY MAIN CONTRACTOR
2. ALL SETTING OUT WITH SURVEY COORDINATES FOR FLOOR DRAIN , AREA DRAIN,TRENCH DRAIN
MAMHOLE,GREASE INTERCEPTOR.PETROL INTERCEPTOR,DRAIN PIPE &INVERT LEVEL BY MAIN CONTRACTOR
3. ALL SETTING OUT WITH SURVEY COORDINATES FOR FLOOR DRAIN , AREA DRAIN,TRENCH DRAIN

You might also like