Project : The Sevens

Training Manual – HVAC SYSTEMS

Bilt Middle East LLC


BILT MIDDLE EAST LLC PO Box No. 2393, Dubai UAE
1
Project : The Sevens HVAC SYSTEMS

HVAC System (User Training)


The project comprises of Player’s Club House & Grand Stand. The Chilled water is supplied through
pre-insulated HDPE pipes laid underground from the Chiller Yard comprising of three chillers each
of 362 Tons.

Three Nos. Air- Cooled Chiller And Chilled water pipe network,

Four Primary Chilled Water Pumps of constant flow type

Three Secondary variable speed Pump

Four Tertiary Pump of Variable flow type – 2 Each for Club house and Grand Stand

Six Nos. Fresh Air Handling Units Located at AHU rooms in that one FAHU dedicated to
Clubhouse kitchen make up.

Six nos return air AHU are serving to Banquet hall / Bar

Fan coil units for Changing rooms/Toilet/ Offices/ corridor etc.

Toilets are ventilated by central exhaust connected to FAHUs.

Bilt Middle East LLC


BILT MIDDLE EAST LLC PO Box No. 2393, Dubai UAE
2
Project : The Sevens HVAC SYSTEMS

HVAC System (User Training)

The LV Room in the Service Yard , the Fire Fighting Pump Room and Du GSM room in club
house are been provided with split units which supply conditioned air to the rooms.

EK server room is maintained by dedicated CCU unit which is having dual coil. This unit will
Run with chilled water as well as refrigerant gas..

---------- END --------