Field Timeline
7/1/2018
End of installation of
Platform/Facilities and
5/31/2013
5/31/2017 - 7/1/2018 Opening 1st well
Beginning
Time for
of the
Drilling and Completion
simulation 7/31/2018
5/31/2043
5/31/2013 - 5/31/2017 Opening 2nd well
End of the
Production
7/1/2018 - 5/31/2043 simulation
History
Period Production Forecast
5/31/2013 5/31/2043
The economic data provided in Tables 3, 11 and 12 in UNISIM-I-D.pdf file are expected mean
values to be incurred in the mandatory dates presented in Figure A1.