PLC Building
1 Expansion building Floor area 5/20/2023
2 CMM Room 7/1/2023
3 Expansion Building - Header line completion 7/5/2023
4 Chiller Platform 12/4/2023
5 Chiller platform - Reworks 1/20/2023
6 Injection Moulding 1,2 & 3 5/15/2023
7 CTO Approval 9/27/2023
PLC Inline
1 Drum round line 12/5/2023
2 Tub welding 3/19/2023 Done during Shutdown
3 Single Press/Drum line Foundation 3/19/2023
4 Assembly line Drain points 3/12/2023
5 Conveyor Platform 7/1/2023