PROJECT HANDOVER CHECK LIST
ISSUE DATE
REV
Address
2 DC cables
3 AJB
4 Inverters/PCU
5 DC Earthing
6 AC Earthing
8 LT / HT Panel
9 Transformers
10 Transformer Earthing
11 AC cables
12 CT / PT (LT / HT Panel)
Waranty Terms,Vendor
Contact Information of all 13 AB (Air Breakers) switch (Switch Yard)
8
Components installed in 14 CT / PT (Switch Yard)
Plant
15 Control Rooms Earthing details
16 Yard Earthing
17 ABT meters
21 Electrical Contractor
22 Civil Contractor
5 Battery
6 AC / DC DB
7 AJB
1 Modules
2 AJBs
3 Inverters/PCU
4 Battery
Test Certificate of all Major 5 DC Cables
10
Equipments
6 AC Cables
7 Transformers
CT/ PT Calibration / Test reports (wherever
8
applicable).
9 ABT meters Calibration / Test reports.
1 Modules
2 DC cables
3 AJB
4 Inverters/PCU
5 DC Earthing
6 AC Earthing
7 AC / DC DB
8 LT / HT Panel
9 Transformers
Technical specification 10 Transformer Earthing
12 documents of all Equipments
Installed in Plant 11 AC cables
12 CT / PT (LT / HT Panel)
14 CT / PT (Switch Yard)
16 Yard Earthing
17 ABT meters
Name:
1 Qualification:
Experience:
Name:
2 Qualification:
Experience:
13 Site O&M staff details
Name:
3 Qualification:
Experience:
Name:
4 Qualification:
Experience:
3 Multi Meter
4 PV Modules
6 Wrench set
7 Cutter
9 Testers
10 Plier
12 Strippers
13 Spares/tools/PPEs
13 DC Cables ( DC Side)
14 AC Side Cables.
15 MC4 connectors
19 Infrared Camera
20 9Volts Battery
PM Remarks:
Engg Remarks: