SF6 Generator Circuit Breaker System
1 Administrative Information.............................................................................................................................. 1
2 Recommendations and Findings.................................................................................................................... 4
3 Acceptance and Signatures............................................................................................................................ 5
4 Local Customer Representaton and Manpower............................................................................................6
5 Situation on Site............................................................................................................................................... 7
6 Work Carried Out............................................................................................................................................. 8
7 Site Specific Data............................................................................................................................................. 9
8 GCB System Technical Data........................................................................................................................... 9
9 Counter Readings............................................................................................................................................ 9
10 Local Control Cubicle.................................................................................................................................... 10
11 Main Circuit Breaker System......................................................................................................................... 11
12 External Connections.................................................................................................................................... 14
13 Circuit Breaker Measurements and Tests.................................................................................................... 16
14 Completion of Work....................................................................................................................................... 19
15 Measurement Results.................................................................................................................................... 20

1 ADMINISTRATIVE INFORMATION

1.1 Assignment Details

Job Type Diagnostics

If ‘Other’ is specified for Job Type _____

ABB Order Number 16656

GCB System Type HECS-80M, HMB-4.5

Serial Number 1HC210629518

Plant Name Shuweihat S3 PP

Unit Name 71BAC

Customer Shuweihat Asia Power Company PJSC

Country United Arab Emirates

©   Copyright 2023 ABB Switzerland Ltd.. All rights reserved.

1 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

1.2 Product Information


First energisation date _____
HEC 9 L2 Serial number _____
HEC 9 L3 Serial number _____

1.3 Product Orientation


Phase L1 local designation C
Phase L2 local designation B
Phase L3 local designation A
Location of phase L1 Far side of LCC

1.4 Field Service Engineer


KAUSHALKUMAR
FSE Name FS ID Number FS 376
VYAS
Arrival date 2021-11-07 Departure date 2021-11-11
Start of works 2021-11-09 Completion of works 2021-11-11

1.5 Supplementary Reports

If any supplementary reports have been completed, then please indicate which ones are linked to this report. Not all reports may be
applicable.

GMS600 Report ☐
Enhanced Interlocking Report ☐
Phase Reversal Disconnector Report1 ☐
Direct Disconnector Report1 ☐
Braking Switch Report 1

Drive Overhaul Report ☐

2 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

Before starting any work on site, verify that you are familiar with all the relevant safety instructions for on-site work,
specifically EN 50110-1, clauses 6.2. and 6.3.

The GCB installation shall

a) not be in use,
b) not planned to be in use,
c) not be energised,
d) be secured against unintentional re-energisation and
e) be earthed (should a risk assessment require this)

until the completion of all relevant activities.

Two standards exist for component naming and may be used interchangeably:

DIN EN 81346-2 DIN 40719-2 Switching Element


QA1 Q0 Circuit Breaker
QB6 Q6 Braking Switch
QB9 Q9 Disconnector
QC91 Q81 Earthing Switch, Generator Side
QC92 Q82 Earthing Switch, Transformer Side
QB91 Q91 Starting Switch, Generator Side
QB92 Q92 Starting Switch, Transformer Side

Check Box Explanations

Generally, a cross indicates a deviation, a failure, warning or not applicable. A tick indicates a pass or acceptance.

For each item, the some, or all, of following options are available.

Applicable (Tick or Cross) A tick indicates that this item is applicable. A cross indicates that it is not.

L1 or System, L2, L3 (Tick or Empty) A tick indicates that this item meets all requirements. An empty box indicates that it does not.
For components that are common to the system, then only L1 contains a checkbox. Otherwise, a checkbox is
available for all three phases.

Fail, Warning or Remark (Cross or Empty) A cross indicates that this item requires additional attention, which shall be documented in
Section 2

This report shall be signed by the customer, or the representative of the customer, and the ABB Certified Field Service Engineer and
submitted to ABB at:

Post ABB Power Grids Switzerland Ltd. E-mail gcb_service@ch.abb.com


High Voltage Products, Dept. PGHV-Z
Brown Boveri Strasse 5
8050 Zurich
Switzerland

3 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

2 RECOMMENDATIONS AND FINDINGS

Any item, or items, within this report that have been flagged as failed, or otherwise require attention (denoted by ❎ in the Fail,
Warning or Remark column), are documented within this section, together with an explanation as to why a pass was not recorded.
It is recommended that these items be completed and closed out as appropriate.

 Due to Heavy Fault flowing through the GCB system during Three phase short
circuit on 4th Aug 2021,Client approached OEM for Further Inspection and OEM
has suggested to perform Midlife inspection.
 After Midlife inspection, GCB has 78% Remaining electrical life. Based on the
test carried out, no abnormality observed. GCB is ready for further operation.
 After inspection of GCB , Field service engineer has review the available spares
parts list and recommended to procure following Critical Spares & consumables. 
1) Hydraulic oil 
2) Bevel Gear
3) Manual Hydraulic Spring charging kit
4) Hydraulic mechanism complete set ( HMB 4.5)
5) Electrical Overhauling Kit of complete GCB system

4 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

3 ACCEPTANCE AND SIGNATURES

3.1 Disclaimer

The GCB System has passed all the tests that are required by ABB. Upon signing this document, the customer is
deemed to have acknowledged and accepted that
a) ABB is not responsible for any supplies or services related to the flexible connections between the GCB and the IPB
when not supplied or performed by ABB,
b) if ABB has supplied the interface drawings and any other related information for the flexible connections between the
GCB and the IPB, then ABB’s responsibility is limited to the correctness of such drawings and information,
c) the prescribed maintenance procedures according to the operation and maintenance manuals shall be undertaken and
that attention shall be given to the number of load-current breaking operations and the environmental conditions that
the breaker is exposed to,
d) the total permissible run time of the drive pump motor within half an hour is limited to three minutes, including during
installation and maintenance and,
e) all remedial actions as described under Section 2 shall be implemented before applying voltage to the GCB.

3.2 Tested Connection Zone (IEC 61936-1, Chapter 5.6)

The customer understands that, according to IEC 61936-1, Chapter 5.6, which states “Information on mounting and
service conditions of type tested equipment supplied by the manufacturer shall be observed on site”, any deviations from
the information provided on the dimension drawing supplied with the GCB may result in injury to persons, damage to
equipment, or both.

3.3 Electrical Interlocking

The customer understands that all electrical interlocking systems must be activated to prevent unintended operation,
either from local or remote commands, of any component of the GCB system.

3.4 Acceptance Signatures

3.4.1 Place and Date

Place SHUWEIHAT ASIA POWER COMPANY PJSC Date 2021-11-11

3.4.2 For ABB

Name Kaushalkumar vyas


Signatures and/or
stamps
FS ID FS - 376

3.4.3 For the Customer, or the Representative

Mayur Gupta - Lead Electrical Engineer


Signatures and/or
Name, or names
stamps
_____

If this report has been signed by a third party, then this report shall be handed over to the customer prior to energisation.

5 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

4 LOCAL CUSTOMER REPRESENTATON AND MANPOWER

4.1 Customer Representatives

Name Mayur Gupta


Company SAPCO
Position Lead Electrical Engineer

Name Sarjil Bharucha


Company SAPCO
Position Electrical Engineer

Name Jignesh Patel


Company SAPCO
Position Technician

Name _____
Company _____
Position _____

4.2 Customer Manpower Provided

Name _____
Company _____
Position _____

Name _____
Company _____
Position _____

Name _____
Company _____
Position _____

Name _____
Company _____
Position _____

6 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

5 SITUATION ON SITE

The overall experience on site during the time-period over which the work on the GCB was performed is recorded within this section.

 Shut down taken by customer for the Maintenance inspection


works of the GCB.
 Earthing switch Q81 and Q82 was closed, and manual earthing
also provided Generator and transformer side.

7 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

6 WORK CARRIED OUT

The main work items carried out on the GCB are listed within this section, together with any issues that may have arisen and were
resolved. The discussion is limited to the defined scope of the work that was performed during the specified time-period.

 Visual inspection carried out of GCB system.


 Clean GCB complete system.
 Checked all Local-Remote electrical operation of the complete GCB
System (Q0, Q9, Q81, Q82, Q91).
 Checked Manual (hand Crank) Operation for Q9, Q81, Q82 and Q91.
 Checked all interlocking between Q0, Q9, Q81, Q82 and Q91.
 Timing and DRM measurement carried out and Results attached.
 SF6 Gas analysis checked.
 Contact Resistance measurement carried out with Customer Test
Equipment. (Note: - CRM measurement is not part of Maintenance
inspection)
 GCB Maintenance Inspection works done as per Maintenance
Inspection report.

8 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

7 SITE SPECIFIC DATA

7.1 Documentation
Wiring diagram 1HC0086813 Revision 00
Dimension drawing 1HC0086693 Revision AB
Factory test report 1HC21074578 Revision AF

8 GCB SYSTEM TECHNICAL DATA2 Units Value

Rated voltage, IEC Ur kV 23.0


Rated frequency, IEC fr Hz 50
Rated nominal current, IEC Ir kA 10.5
Rated short-circuit current, IEEE, Isc kA 80
Rated filling density of SF6, IEC kg/m³ 40.3
Rated auxiliary voltage – Trip 1 and Close, IEC Ua1 Vdc 220
Rated auxiliary voltage – Trip 2, IEC Ua2 Vdc 220
Rated auxiliary voltage – operating mechanism pump drive motor, Um1 Vdc 220
Rated auxiliary voltage – slow-running drives, Um2 Vac 415

9 COUNTER READINGS

L1 or L1 or
9.1 Main Counters3 System
L2 L3
System
L2 L3

Date of readings (Initial and Final) 2021-11-09 2021-11-11


Close-Open operations 0 688 _____ 719 _____ _____
Pump operations 0 1409 _____ 1459 _____ _____

L1 or L1 or
9.2 Auxiliary Counters Applicable
System
L2 L3
System
L2 L3

SFC Starting switch operations4 ❌ _____ _____


Back to Back starting switch operations 2
❌ _____ _____

L1 or L1 or
9.3 Running Hours Applicable
System
L2 L3
System
L2 L3

Cooling system running hours ❌ _____ _____ _____ _____ _____ _____
SADHE Compressor running hours ❌ _____ _____

9 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

10 LOCAL CONTROL CUBICLE

Fail,
L1 or
10.1 General Installation Applicable
System
L2 L3 Warning or
Remark

10.1.1 Cabinet and Frame

Visual checks ✔ ✔ ☐
Electrically isolated from the pole frame ✔ ✔ ☐
Single earth connection to the power plant grounding system 5
✔ ✔ ☐

10.1.2 External Connections

Alarm and warning signals connected according to wiring diagram ✔ ✔ ☐

10.1.3 Power Supplies

AC Auxiliary voltage available ✔ ✔ ☐


DC Auxiliary voltage available ✔ ✔ ☐

10.1.4 Functional Tests

Displays and warning lamps ✔ ✔ ☐


Correct operation of hygrotherm control and heaters ✔ ✔ ☐

10.1.5 Control Cubicle (Only for non-ABB scope of supply)

Operation counter installed ❌ ☐ ☐


Pump running hours counter installed ❌ ☐ ☐
SF6 alarm controls installed ❌ ☐ ☐
SF6 blocking controls installed ❌ ☐ ☐

10 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

11 MAIN CIRCUIT BREAKER SYSTEM

Fail,
L1 or
11.1 General Installation Applicable
System
L2 L3 Warning or
Remark

11.1.1 Pole Frames

Visual checks ✔ ✔ ✔ ✔ ☐
Transport support brackets have been removed6 ❌ ☐ ☐ ☐ ☐
Single earth connection to the power plant grounding system 7
✔ ✔ ✔ ✔ ☐

11.1.2 Module Enclosures

Visual checks ✔ ✔ ✔ ✔ ☐
IPB’s correctly attached to the enclosures 1
❌ ☐ ☐ ☐ ☐

Fail,
L1 or
11.2 Circuit Breakers Applicable
System
L2 L3 Warning or
Remark

11.2.1 Circuit Breakers, Q0 (QA1)

Visual checks ✔ ✔ ☐ ☐ ☐
Functional checks ✔ ✔ ☐ ☐ ☐
Ablation indicator visual checks 8
❌ ☐ ☐ ☐ ☐

11 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

Fail,
L1 or
11.3 Auxiliary Switches Applicable
System
L2 L3 Warning or
Remark

11.3.1 Disconnectors, Q9 (QB9)9

Visual check ✔ ✔ ✔ ✔ ☐
Functional check ✔ ✔ ✔ ✔ ☐
Contact element alignment10 ❌ ☐ ☐ ☐ ☐
Electrical braking functional check2 ❌ ☐ ☐ ☐ ☐
Operation of key locking ✔ ✔ ✔ ✔ ☐
Operation of electrical interlocking ✔ ✔ ✔ ✔ ☐

11.3.2 Earthing Switches, Transformer Side, Q82 (QC92)1

Visual check ✔ ✔ ✔ ✔ ☐
Functional check ✔ ✔ ✔ ✔ ☐
Contact element alignment 2
❌ ☐ ☐ ☐ ☐
Electrical braking functional check2 ❌ ☐ ☐ ☐ ☐
Operation of key locking ✔ ✔ ✔ ✔ ☐
Operation of electrical interlocking ✔ ✔ ✔ ✔ ☐

11.3.3 Earthing Switches, Generator Side, Q81 (QC91)

Installed configuration11 Standard ☐


Visual check ✔ ✔ ✔ ✔ ☐
Functional check ✔ ✔ ✔ ✔ ☐
Contact element alignment 2
❌ ☐ ☐ ☐ ☐
Electrical braking functional check2 ❌ ☐ ☐ ☐ ☐
Operation of key locking ✔ ✔ ✔ ✔ ☐
Operation of electrical interlocking ✔ ✔ ✔ ✔ ☐

11.3.4 SFC Starting Switches, Q91 (QB91)

Visual check ✔ ✔ ✔ ✔ ☐
Functional check ✔ ✔ ✔ ✔ ☐
Contact element alignment2 ❌ ☐ ☐ ☐ ☐
Electrical braking functional check2 ❌ ☐ ☐ ☐ ☐
Operation of key locking ✔ ✔ ✔ ✔ ☐
Operation of electrical interlocking ✔ ✔ ✔ ✔ ☐

12 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

Fail,
L1 or
11.4 Instrumentation Applicable
System
L2 L3 Warning or
Remark

11.4.1 Voltage Transformers

Visual installation check ✔ ✔ ✔ ✔ ☐


All high voltage connections correctly fitted ✔ ✔ ✔ ✔ ☐
Continuity check on VT primary and secondary windings ✔ ✔ ✔ ✔ ☐
All earthing bolts on N terminal correctly fitted 12 ✔ ✔ ✔ ✔ ☐

11.4.2 Current Transformers

Visual installation check ❌ ☐ ☐ ☐ ☐

11.4.3 Surge Arrestors

Visual installation check ❌ ☐ ☐ ☐ ☐


All high voltage connections correctly fitted ❌ ☐ ☐ ☐ ☐

11.4.4 Surge Capacitors

Visual installation check ✔ ✔ ✔ ✔ ☐


All high voltage connections correctly fitted ✔ ✔ ✔ ✔ ☐
Short circuit safety wires removed ✔ ✔ ✔ ✔ ☐

11.4.5 Density Switches

Visual check ✔ ✔ ✔ ✔ ☐
Functional check ✔ ✔ ✔ ✔ ☐

13 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

Fail,
L1 or
11.5 Auxiliary Systems Applicable
System
L2 L3 Warning or
Remark

11.5.1 Cooling Systems

Visual check ❌ ☐ ☐ ☐ ☐
Functional check ❌ ☐ ☐ ☐ ☐
Rotation direction of circulation fans check ❌ ☐ ☐ ☐ ☐
Redundancy check ❌ ☐ ☐ ☐ ☐
Heat pipes visual check13 ❌ ☐ ☐ ☐ ☐

11.5.2 AHMA/HMB/HMC Operating Mechanisms14

Visual check ✔ ✔ ✔ ✔ ☐
Operating linkage visual check ✔ ✔ ✔ ✔ ☐
Close position interlock activated15 ✔ ✔ ✔ ✔ ☐
Oil levels ✔ ✔ ✔ ✔ ☐
Motor brush length ✔ ✔ ✔ ✔ ☐
Covers free from signs of oil leakages ✔ ✔ ✔ ✔ ☐
Low Pressure tank vented ✔ ✔ ✔ ✔ ☐

11.5.3 SADHE Operating Mechanisms

Compressor visual check ❌ ☐ ☐


Distance S2 of PN10815 damping device 16
❌ ☐ ☐
Drive visual check ❌ ☐ ☐

Fail,
12 EXTERNAL CONNECTIONS Applicable
L1 or
System
L2 L3 Warning or
Remark

12.1.1 Starting Switch Q91 Cable

Visual check ✔ ✔ ✔ ✔ ☐
Tightening torque check ✔ ✔ ✔ ✔ ☐
Cable screens check, connected only at supply side ✔ ✔ ✔ ✔ ☐

12.1.2 Flexible Connections, Generator Side

Installed according to dimension drawing ✔ ✔ ✔ ✔ ☐


Visual check ✔ ✔ ✔ ✔ ☐
Tightening torque check 17
✔ ✔ ✔ ✔ ☐
Support rings installed ✔ ✔ ✔ ✔ ☐

12.1.3 Flexible Connections, Transformer Side

Installed according to dimension drawing ✔ ✔ ✔ ✔ ☐


Visual check ✔ ✔ ✔ ✔ ☐
Tightening torque check1 ✔ ✔ ✔ ✔ ☐
Support rings installed ✔ ✔ ✔ ✔ ☐

14 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

Fail,
L1 or
12.2 SF6 Gas18 Units Applicable
System
L2 L3 Warning or
Remark

12.2.1 Gas Specific Data

Ambient temperature during gas filling operation °C ✔ 34 ☐


Density gauge indication at black dot (green range) ✔ ✔ ☐ ☐ ☐
Gas pressure kPa ❌ _____ _____ _____ ☐
Mass of gas used for filling 19
kg ❌ _____ _____ _____ ☐
Mass of gas used for replenishment _____ ❌ _____ _____ _____ ☐

12.2.2 Gas Quality Assurance

Gas leakage test ✔ ✔ ☐ ☐ ☐


Gas tank identification number ❌ _____ ☐
Gas quality assurance method ✔ Dew point measurement ☐
Gas tank re-sealed ❌ ☐ ☐

12.2.3 Gas Analysis20

Concentration % ✔ 99.9 _____ _____ ☐


Dew point at 100 kPa and 20°C °C ✔ -23.7 _____ _____ ☐
Decomposition products µl/l ✔ 0 _____ _____ ☐

15 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

13 CIRCUIT BREAKER MEASUREMENTS AND TESTS

Fail,
L1 or
13.1 Customer Controls — Disconnection System
L2 L3 Warning or
Remark

Number of disconnected wires from customer controls 5


Number of jumpers set for testing 6

Fail,
L1 or
13.2 Timing References Units Standard Value
System
L2 L3 Warning or
Remark

13.2.1 Reference Sources

Source of the reference data (FAT or last electrical overhaul) Last Electrical Overhaul

13.2.2 Circuit Breaker Timing Reference Values

1st Close ms 37 ±5 33.8 33.8 32.8


2nd Close ms 37 ±5 33.93 33.93 32.93
1st Open (trip 1) ms 34 ±5 35 35.5 35.5
2nd Open (trip 1) ms 34 ±5 34.9 35.3 35.2
1 Open (trip 2)
st
ms 34 ±5 34.8 35.3 35.1
2nd Open (trip 2) ms 34 ±5 34.6 35.3 35.1
Close – Open ms 58 ±5 58.4 58.9 60

13.2.3 Operating Mechanism Timing Reference Values

Recharge time, after open operation s 25 ±4 _____ _____ _____


Recharge time, after close operation s 19 ±3 _____ _____ _____

16 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

Fail,
L1 or
13.3 Circuit Breaker Timing Test Results Units Applicable
System
L2 L3 Warning or
Remark

13.3.1 Environmental Conditions

Ambient Temperature °C ✔ 34 ☐

13.3.2 Timing Measurements

1st Close ms ✔ 33.9 34.6 34.4 ☐


2 Close
nd
ms ✔ 33.8 34.6 34.4 ☐
1st Open (trip 1) ms ✔ 35.9 35.7 35.7 ☐
2 Open (trip 1)
nd
ms ✔ 35.7 35.4 35.2 ☐
1st Open (trip 2) ms ✔ 35.7 35.3 35.1 ☐
2 Open (trip 2)
nd
ms ✔ 36 35.7 35.8 ☐
Close - Open ms ✔ 62.5 61.5 61.4 ☐

13.3.3 Timing Assessments

Deviations in respect of the FAT data21 ✔ ✔ ☐

13.3.4 HEC 9 Specific Timing Assessments

Maximum time difference between poles, close ms ❌ _____ ☐


Maximum time difference between poles, open, trip coil 1 ms ❌ _____ ☐
Maximum time difference between poles, open, trip coil 2 ms ❌ _____ ☐
Phase discrepancy, pole disabled during close ms ❌ ☐ ☐ ☐ ☐
Phase discrepancy, pole disabled during open, trip coil 1 ms ❌ ☐ ☐ ☐ ☐

17 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

Fail,
L1 or
13.4 Operating Mechanism Test Results Units Applicable
System
L2 L3 Warning or
Remark

13.4.1 AHMA/HMB/HMC Operating Mechanism Tests

Energy storage for specified rating (CO or CO-CO) CO-CO ✔ ✔ ✔ ✔ ☐


Recharge time, after open operation s ✔ 22 _____ _____ ☐
Recharge time, after close operation s ✔ 18 _____ _____ ☐

13.4.2 SADHE Operating Mechanism and Compressor Tests

Compressor refilling time, after close-open operation s ❌ _____ ☐


Pressure drop in air receiver, after close operation _____ ❌ _____ ☐
Pressure drop in air receiver, after open operation _____ ❌ _____ ☐
Pressure drop in air receiver, after close-open operation _____ ❌ _____ ☐
Pressure drop after 24 hours, without operation _____ ❌ _____ ☐

Fail,
L1 or
13.5 Resistance Measurements Units Applicable
System
L2 L3 Warning or
Remark

13.5.1 Dynamic Resistance Measurements (DRM) 22

Remaining electrical lifetime — from switched currents log23 % ❌ _____ ☐


Remaining electrical lifetime — according to ablation indicator 24
% ❌ _____ _____ _____ ☐
Remaining electrical lifetime — according to tulip geometry 25
% ❌ _____ ☐
Remaining contact overlap, maximum % ✔ 100 ☐
Remaining contact overlap, minimum % ✔ 78 ☐

13.5.2 Static Resistance Measurements (SRM)26

Measurement results  ✔ 1 1 1 ☐

Fail,
L1 or
13.6 Functional Tests Applicable
System
L2 L3 Warning or
Remark

13.6.1 System Tests

Anti-pumping test ✔ ✔ ☐

Fail,
L1 or
13.7 Customer Controls — Reconnection System
L2 L3 Warning or
Remark

Number of reconnected wires from customer controls 5


Number of jumpers removed after testing 6

18 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

14 COMPLETION OF WORK

All temporary links and connections removed ✔


All customer connections replaced ✔
Local control cubicle cleaned of all debris27 ✔
Operation mode set to REMOTE ✔
All relevant MCB’s are closed ✔
All operation and interlock keys present and in place ✔
Additional reports completed ✔

19 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

15 MEASUREMENT RESULTS

DRM Measurement :-

DRM-OPEN Pole A 6 (L3 Phase) 11/09/2021

20 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

DRM-OPEN Pole B 5 (L2 Phase) 11/09/2021

DRM-OPEN Pole C 4 (L1 Phase) 11/09/2021

21 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

Close 1st recording at nominal voltage pump stop 11/9/2021

Parameter Unit Result Pass/Fail Nominal Minimum Maximum


Close time A ms 33.900 Pass 37.0 32.0 42.0
Close time B ms 34.600 Pass 37.0 32.0 42.0
Close time C ms 34.400 Pass 37.0 32.0 42.0
Diff A-B-C ms 0.700 Pass 0.0 0.0 2.0
Cls speed m/s 4.95 Pass 5.2 4.9 5.5

Close 2nd recording at nominal voltage pump stop 11/9/2021

Parameter Unit Result Pass/Fail Nominal Minimum Maximum


Close time A ms 33.800 Pass 37.0 32.0 42.0
Close time B ms 34.600 Pass 37.0 32.0 42.0
Close time C ms 34.400 Pass 37.0 32.0 42.0
Diff A-B-C ms 0.800 Pass 0.0 0.0 2.0
Cls speed m/s 4.95 Pass 5.2 4.9 5.5

22 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

Open-1 1st. recording at nominal voltage pump stop 11/9/2021

Parameter Unit Result Pass/Fail Nominal Minimum Maximum


Open time A ms 35.900 Pass 34.0 29.0 39.0
Open time B ms 35.700 Pass 34.0 29.0 39.0
Open time C ms 35.700 Pass 34.0 29.0 39.0
Diff A-B-C ms 0.200 Pass 0.0 0.0 2.0
Opn speed m/s 7.60 Pass 7.9 7.6 8.2

Open-1 2nd recording at nominal voltage pump stop 11/9/2021

Parameter Unit Result Pass/Fail Nominal Minimum Maximum


Open time A ms 35.700 Pass 34.0 29.0 39.0
Open time B ms 35.400 Pass 34.0 29.0 39.0
Open time C ms 35.200 Pass 34.0 29.0 39.0
Diff A-B-C ms 0.500 Pass 0.0 0.0 2.0
Opn speed m/s 7.60 Pass 7.9 7.6 8.2

23 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

Open-2 1st. recording at nominal voltage pump stop 11/9/2021

Parameter Unit Result Pass/Fail Nominal Minimum Maximum


Open time A ms 35.700 Pass 34.0 29.0 39.0
Open time B ms 35.300 Pass 34.0 29.0 39.0
Open time C ms 35.100 Pass 34.0 29.0 39.0
Diff A-B-C ms 0.600 Pass 0.0 0.0 2.0
Opn speed m/s 7.63 Pass 7.9 7.6 8.2

Open-2 2nd recording at nominal voltage pump stop 11/9/2021

Parameter Unit Result Pass/Fail Nominal Minimum Maximum


Open time A ms 36.000 Pass 34.0 29.0 39.0
Open time B ms 35.700 Pass 34.0 29.0 39.0
Open time C ms 35.800 Pass 34.0 29.0 39.0
Diff A-B-C ms 0.300 Pass 0.0 0.0 2.0
Opn speed m/s 7.60 Pass 7.9 7.6 8.2

24 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

Close-Open recording at nominal voltage pump stop 11/9/2021

Parameter Unit Result Pass/Fail Nominal Minimum Maximum


CO time A ms 62.500 Pass 58.0 53.0 63.0
CO time B ms 61.500 Pass 58.0 53.0 63.0
CO time C ms 61.400 Pass 58.0 53.0 63.0
Cls df ABC ms 0.700 Pass 0.0 0.0 2.0
Opn df ABC ms 0.500 n.a 0.0 0.0 2.0
Cls speed m/s 4.94 Pass 5.2 4.9 5.5
Opn speed m/s 7.40 Pass 7.6 7.0 8.2

25 / 27
Document type Version Document part Document number

ANW AA E02 1HC0158002

26 / 27
1
Only for HECPS (Pumped Storage Applications)
2
Standards referred to are IEC 62271, IEC 62271-102, IEEE C37-013
3
For HEC 9, values are required for all three phases. For all other products, only enter system values.
4
Only for HECPS
5
A dedicated earth point is provided. Multiple earth connections are not permitted.
6
After welding of the IPB enclosures and not valid for HVR.
7
A dedicated earth point is provided. Multiple earth connections are not permitted.
8
Only applicable for HVR and HVS products
9
Not applicable for Pumped-Storage applications
10
Only applicable for HVS products
11
This switch may be configured as a standard earth switch, or as part of the short-circuit connection
12
Not for Watt-Sud VT’s, as these have an internal link from N to the earthed baseplate
13
Only valid for HECS products that are fitted with heat pipes
14
For HEC 9, there are three separate operating mechanisms. All other products have one common operating mechanism.
15
Not valid for HMC drive
16
Only valid for SADHE piston exchange
17
Only applicable for the connections at the GCB side. The IPB connections are not in the GCB scope.
18
For HVR, HVS, HEC 9 and HEC 10, gas data are individual for all three phases. For all other products, a system value shall be used.
19
Only for first commissioning
20
Only if specifically ordered in advance
21
2 ms for HEC 9, 5 ms for all other products
22
Only to be conducted following an overhaul or for diagnostics testing. It shall not be conducted for commissioning or for maintenance
activities.
23
Only applicable if the data is available from a logbook
24
Only applicable for HVR and HVS
25
Only applicable for HEC 7 - 10
26
Only to be conducted following an overhaul.
27
Do NOT use compressed air to clean debris from the LCC, as there is a risk that conductive debris is blown up and deposited into