You are on page 1of 7

Project : Shuweihat S3 IPP

Owner

Owner´s Engineer

Consortium

Orginator

Ursprung/Original Ursprung-Nr./Original-No. Urspr.-PKZ-Nr.


Orig.-PC

Projekt/Project PKZ/PC

Shuweihat S3 IPP AE1172


Datum Name Maßstab DCC &EPA010
Date Scale Type
Gezeich. Benennung/Title Inhaltskennzeichen
Drawn
2012-01-04 A.Exner Contents Code
Bearb.
Coord.
2012-01-04 B.Winter Equipment list including KKS no.
Geprüft
Checked
2012-01-04 T.Wunderlin 7120
Abtlg. Zähl-Nr
Dept.
BU HV Systems Reg. No. 026117
Dienstst./Dept. UNID Index/Rev. Version
BRUGG CABLES 00
Ang.-Var./Offer-Var. Var./Opt Blatt-Nr./Page-No.
AE1172-&EPA010-7120-026117 1/7

00 2014-09-30 EA TWU AS BUILT


A 2012-01-04 EA TWU First Issue
Index Datum Bearb. Geprüft
Änderungshinweis / Details of Revision
Rev. Date Coord. Checked

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents
Daewoo E&C and communication thereof to others without express authorization are prohibited. Offenders will be held
liable for payment of damages. All rights created by patent grant or registration of a utility model or design
patent are reserved.
Equipment list including KKS no.

Shuweihat S3 IPP - Unit 71 (Gas Turbine)


No. Equipment Description Drawing number KKS number

1 Cable XDRCU-PBT 1x630DB mm2 400/220 kV (red phase) AE1172-&ETB010-7120-026124 71ACA04BW001


2 Cable XDRCU-PBT 1x630DB mm2 400/220 kV (yellow phase) AE1172-&ETB010-7120-026124 71ACA04BW002
3 Cable XDRCU-PBT 1x630DB mm2 400/220 kV (blue phase) AE1172-&ETB010-7120-026124 71ACA04BW003
4 Outdoor sealing end TE 1.420-01 (red phase) AE1172-&ETB010-7120-026126 71ACA03BW001
5 Outdoor sealing end TE 1.420-01 (yellow phase) AE1172-&ETB010-7120-026126 71ACA03BW002
6 Outdoor sealing end TE 1.420-01 (blue phase) AE1172-&ETB010-7120-026126 71ACA03BW003
7 SF6-sealing end TF 1.420-11 (red phase) AE1172-&ETB010-7120-026129 71ACA05BW001
8 SF6-sealing end TF 1.420-11 (yellow phase) AE1172-&ETB010-7120-026129 71ACA05BW002
9 SF6-sealing end TF 1.420-11 (blue phase) AE1172-&ETB010-7120-026129 71ACA05BW003
10 Oil expansion tank AG 5.0 (red phase) AE1172-&ETB010-7120-026131 71ACA05BB001
11 Oil expansion tank AG 5.0 (yellow phase) AE1172-&ETB010-7120-026131 71ACA05BB002
12 Oil expansion tank AG 5.0 (blue phase) AE1172-&ETB010-7120-026131 71ACA05BB003
13 Disconnecting link box three pole (all phases) AE1172-&ETB010-7120-026133 71ACA05GD001
14 Disconnecting link box single pole IP 65 (red phase) AE1172-&ETB010-7120-026136 71ACA03GD001
15 Disconnecting link box single pole IP 65 (red phase) AE1172-&ETB010-7120-026136 71ACA03GD002
16 Disconnecting link box single pole IP 65 (red phase) AE1172-&ETB010-7120-026136 71ACA03GD003
17 Steel support for Outdoor sealing end (red phase) 71ACA03GZ001
18 Steel support for Outdoor sealing end (yellow phase) 71ACA03GZ002
19 Steel support for Outdoor sealing end (blue phase) 71ACA03GZ003
20 Steel support for SF6 sealing end (all phases) 71ACA05GZ001

Issued Checked Released


Issue Date Initials Date Initials Date Initials
Revision 0 20.12.2011 ea 20.12.2011 twu 20.12.2011 ea
Revision 1
© Brugg Kabel AG
Master Drawing List (Rev. 0) Page 2 (6)

Shuweihat S3 IPP - Unit 72 (Gas Turbine)


No. Equipment Description Drawing number KKS number

1 Cable XDRCU-PBT 1x630DB mm2 400/220 kV (red phase) AE1172-&ETB010-7120-026124 72ACA04BW001


2 Cable XDRCU-PBT 1x630DB mm2 400/220 kV (yellow phase) AE1172-&ETB010-7120-026124 72ACA04BW002
3 Cable XDRCU-PBT 1x630DB mm2 400/220 kV (blue phase) AE1172-&ETB010-7120-026124 72ACA04BW003
4 Outdoor sealing end TE 1.420-01 (red phase) AE1172-&ETB010-7120-026126 72ACA03BW001
5 Outdoor sealing end TE 1.420-01 (yellow phase) AE1172-&ETB010-7120-026126 72ACA03BW002
6 Outdoor sealing end TE 1.420-01 (blue phase) AE1172-&ETB010-7120-026126 72ACA03BW003
7 SF6-sealing end TF 1.420-11 (red phase) AE1172-&ETB010-7120-026129 72ACA05BW001
8 SF6-sealing end TF 1.420-11 (yellow phase) AE1172-&ETB010-7120-026129 72ACA05BW002
9 SF6-sealing end TF 1.420-11 (blue phase) AE1172-&ETB010-7120-026129 72ACA05BW003
10 Oil expansion tank AG 5.0 (red phase) AE1172-&ETB010-7120-026131 72ACA05BB001
11 Oil expansion tank AG 5.0 (yellow phase) AE1172-&ETB010-7120-026131 72ACA05BB002
12 Oil expansion tank AG 5.0 (blue phase) AE1172-&ETB010-7120-026131 72ACA05BB003
13 Disconnecting link box three pole (all phases) AE1172-&ETB010-7120-026133 72ACA05GD001
14 Disconnecting link box single pole IP 65 (red phase) AE1172-&ETB010-7120-026136 72ACA03GD001
15 Disconnecting link box single pole IP 65 (red phase) AE1172-&ETB010-7120-026136 72ACA03GD002
16 Disconnecting link box single pole IP 65 (red phase) AE1172-&ETB010-7120-026136 72ACA03GD003
17 Steel support for Outdoor sealing end (red phase) 72ACA03GZ001
18 Steel support for Outdoor sealing end (yellow phase) 72ACA03GZ002
19 Steel support for Outdoor sealing end (blue phase) 72ACA03GZ003
20 Steel support for SF6 sealing end (all phases) 72ACA05GZ001

© Brugg Kabel AG Projekt Nr.: 921135


Abt. HV-P Revision: Rev. 2
Master Drawing List (Rev. 0) Page 3 (6)

Shuweihat S3 IPP - Unit 70 (Steam Turbine)


No. Equipment Description Drawing number KKS number

1 Cable XDRCU-PBT 1x630DB mm2 400/220 kV (red phase) AE1172-&ETB010-7120-026124 70ACA04BW001


2 Cable XDRCU-PBT 1x630DB mm2 400/220 kV (yellow phase) AE1172-&ETB010-7120-026124 70ACA04BW002
3 Cable XDRCU-PBT 1x630DB mm2 400/220 kV (blue phase) AE1172-&ETB010-7120-026124 70ACA04BW003
4 Outdoor sealing end TE 1.420-01 (red phase) AE1172-&ETB010-7120-026126 70ACA03BW001
5 Outdoor sealing end TE 1.420-01 (yellow phase) AE1172-&ETB010-7120-026126 70ACA03BW002
6 Outdoor sealing end TE 1.420-01 (blue phase) AE1172-&ETB010-7120-026126 70ACA03BW003
7 SF6-sealing end TF 1.420-11 (red phase) AE1172-&ETB010-7120-026129 70ACA05BW001
8 SF6-sealing end TF 1.420-11 (yellow phase) AE1172-&ETB010-7120-026129 70ACA05BW002
9 SF6-sealing end TF 1.420-11 (blue phase) AE1172-&ETB010-7120-026129 70ACA05BW003
10 Oil expansion tank AG 5.0 (red phase) AE1172-&ETB010-7120-026131 70ACA05BB001
11 Oil expansion tank AG 5.0 (yellow phase) AE1172-&ETB010-7120-026131 70ACA05BB002
12 Oil expansion tank AG 5.0 (blue phase) AE1172-&ETB010-7120-026131 70ACA05BB003
13 Disconnecting link box three pole (all phases) AE1172-&ETB010-7120-026133 70ACA05GD001
14 Disconnecting link box single pole IP 65 (red phase) AE1172-&ETB010-7120-026136 70ACA03GD001
15 Disconnecting link box single pole IP 65 (red phase) AE1172-&ETB010-7120-026136 70ACA03GD002
16 Disconnecting link box single pole IP 65 (red phase) AE1172-&ETB010-7120-026136 70ACA03GD003
17 Steel support for Outdoor sealing end (red phase) 70ACA03GZ001
18 Steel support for Outdoor sealing end (yellow phase) 70ACA03GZ002
19 Steel support for Outdoor sealing end (blue phase) 70ACA03GZ003
20 Steel support for SF6 sealing end (all phases) 70ACA05GZ001

© Brugg Kabel AG Projekt Nr.: 921135


Abt. HV-P Revision: Rev. 2
Master Drawing List (Rev. 0) Page 4 (6)

Shuweihat S3 IPP - Unit 81 (Gas Turbine)


No. Equipment Description Drawing number KKS number

1 Cable XDRCU-PBT 1x630DB mm2 400/220 kV (red phase) AE1172-&ETB010-7120-026124 81ACA04BW001


2 Cable XDRCU-PBT 1x630DB mm2 400/220 kV (yellow phase) AE1172-&ETB010-7120-026124 81ACA04BW002
3 Cable XDRCU-PBT 1x630DB mm2 400/220 kV (blue phase) AE1172-&ETB010-7120-026124 81ACA04BW003
4 Outdoor sealing end TE 1.420-01 (red phase) AE1172-&ETB010-7120-026126 81ACA03BW001
5 Outdoor sealing end TE 1.420-01 (yellow phase) AE1172-&ETB010-7120-026126 81ACA03BW002
6 Outdoor sealing end TE 1.420-01 (blue phase) AE1172-&ETB010-7120-026126 81ACA03BW003
7 SF6-sealing end TF 1.420-11 (red phase) AE1172-&ETB010-7120-026129 81ACA05BW001
8 SF6-sealing end TF 1.420-11 (yellow phase) AE1172-&ETB010-7120-026129 81ACA05BW002
9 SF6-sealing end TF 1.420-11 (blue phase) AE1172-&ETB010-7120-026129 81ACA05BW003
10 Oil expansion tank AG 5.0 (red phase) AE1172-&ETB010-7120-026131 81ACA05BB001
11 Oil expansion tank AG 5.0 (yellow phase) AE1172-&ETB010-7120-026131 81ACA05BB002
12 Oil expansion tank AG 5.0 (blue phase) AE1172-&ETB010-7120-026131 81ACA05BB003
13 Disconnecting link box three pole (all phases) AE1172-&ETB010-7120-026133 81ACA05GD001
14 Disconnecting link box single pole IP 65 (red phase) AE1172-&ETB010-7120-026136 81ACA03GD001
15 Disconnecting link box single pole IP 65 (red phase) AE1172-&ETB010-7120-026136 81ACA03GD002
16 Disconnecting link box single pole IP 65 (red phase) AE1172-&ETB010-7120-026136 81ACA03GD003
17 Steel support for Outdoor sealing end (red phase) 81ACA03GZ001
18 Steel support for Outdoor sealing end (yellow phase) 81ACA03GZ002
19 Steel support for Outdoor sealing end (blue phase) 81ACA03GZ003
20 Steel support for SF6 sealing end (all phases) 81ACA05GZ001

© Brugg Kabel AG Projekt Nr.: 921135


Abt. HV-P Revision: Rev. 2
Master Drawing List (Rev. 0) Page 5 (6)

Shuweihat S3 IPP - Unit 82 (Gas Turbine)


No. Equipment Description Drawing number KKS number

1 Cable XDRCU-PBT 1x630DB mm2 400/220 kV (red phase) AE1172-&ETB010-7120-026124 82ACA04BW001


2 Cable XDRCU-PBT 1x630DB mm2 400/220 kV (yellow phase) AE1172-&ETB010-7120-026124 82ACA04BW002
3 Cable XDRCU-PBT 1x630DB mm2 400/220 kV (blue phase) AE1172-&ETB010-7120-026124 82ACA04BW003
4 Outdoor sealing end TE 1.420-01 (red phase) AE1172-&ETB010-7120-026126 82ACA03BW001
5 Outdoor sealing end TE 1.420-01 (yellow phase) AE1172-&ETB010-7120-026126 82ACA03BW002
6 Outdoor sealing end TE 1.420-01 (blue phase) AE1172-&ETB010-7120-026126 82ACA03BW003
7 SF6-sealing end TF 1.420-11 (red phase) AE1172-&ETB010-7120-026129 82ACA05BW001
8 SF6-sealing end TF 1.420-11 (yellow phase) AE1172-&ETB010-7120-026129 82ACA05BW002
9 SF6-sealing end TF 1.420-11 (blue phase) AE1172-&ETB010-7120-026129 82ACA05BW003
10 Oil expansion tank AG 5.0 (red phase) AE1172-&ETB010-7120-026131 82ACA05BB001
11 Oil expansion tank AG 5.0 (yellow phase) AE1172-&ETB010-7120-026131 82ACA05BB002
12 Oil expansion tank AG 5.0 (blue phase) AE1172-&ETB010-7120-026131 82ACA05BB003
13 Disconnecting link box three pole (all phases) AE1172-&ETB010-7120-026133 82ACA05GD001
14 Disconnecting link box single pole IP 65 (red phase) AE1172-&ETB010-7120-026136 82ACA03GD001
15 Disconnecting link box single pole IP 65 (red phase) AE1172-&ETB010-7120-026136 82ACA03GD002
16 Disconnecting link box single pole IP 65 (red phase) AE1172-&ETB010-7120-026136 82ACA03GD003
17 Steel support for Outdoor sealing end (red phase) 82ACA03GZ001
18 Steel support for Outdoor sealing end (yellow phase) 82ACA03GZ002
19 Steel support for Outdoor sealing end (blue phase) 82ACA03GZ003
20 Steel support for SF6 sealing end (all phases) 82ACA05GZ001

© Brugg Kabel AG Projekt Nr.: 921135


Abt. HV-P Revision: Rev. 2
Master Drawing List (Rev. 0) Page 6 (6)

Shuweihat S3 IPP - Unit 80 (Steam Turbine)


No. Equipment Description Drawing number KKS number

1 Cable XDRCU-PBT 1x630DB mm2 400/220 kV (red phase) AE1172-&ETB010-7120-026124 80ACA04BW001


2 Cable XDRCU-PBT 1x630DB mm2 400/220 kV (yellow phase) AE1172-&ETB010-7120-026124 80ACA04BW002
3 Cable XDRCU-PBT 1x630DB mm2 400/220 kV (blue phase) AE1172-&ETB010-7120-026124 80ACA04BW003
4 Outdoor sealing end TE 1.420-01 (red phase) AE1172-&ETB010-7120-026126 80ACA03BW001
5 Outdoor sealing end TE 1.420-01 (yellow phase) AE1172-&ETB010-7120-026126 80ACA03BW002
6 Outdoor sealing end TE 1.420-01 (blue phase) AE1172-&ETB010-7120-026126 80ACA03BW003
7 SF6-sealing end TF 1.420-11 (red phase) AE1172-&ETB010-7120-026129 80ACA05BW001
8 SF6-sealing end TF 1.420-11 (yellow phase) AE1172-&ETB010-7120-026129 80ACA05BW002
9 SF6-sealing end TF 1.420-11 (blue phase) AE1172-&ETB010-7120-026129 80ACA05BW003
10 Oil expansion tank AG 5.0 (red phase) AE1172-&ETB010-7120-026131 80ACA05BB001
11 Oil expansion tank AG 5.0 (yellow phase) AE1172-&ETB010-7120-026131 80ACA05BB002
12 Oil expansion tank AG 5.0 (blue phase) AE1172-&ETB010-7120-026131 80ACA05BB003
13 Disconnecting link box three pole (all phases) AE1172-&ETB010-7120-026133 80ACA05GD001
14 Disconnecting link box single pole IP 65 (red phase) AE1172-&ETB010-7120-026136 80ACA03GD001
15 Disconnecting link box single pole IP 65 (red phase) AE1172-&ETB010-7120-026136 80ACA03GD002
16 Disconnecting link box single pole IP 65 (red phase) AE1172-&ETB010-7120-026136 80ACA03GD003
17 Steel support for Outdoor sealing end (red phase) 80ACA03GZ001
18 Steel support for Outdoor sealing end (yellow phase) 80ACA03GZ002
19 Steel support for Outdoor sealing end (blue phase) 80ACA03GZ003
20 Steel support for SF6 sealing end (all phases) 80ACA05GZ001

© Brugg Kabel AG Projekt Nr.: 921135


Abt. HV-P Revision: Rev. 2