EPCCS OPTIMISATION DE LA CAPACITE DE

STOCKAGE A LA SONARA
INT-19-0819

READY FOR COMMISSIONING SUMMARY

Rév :00 Doc N°: INT-19-0819-TX-PP-031 Date:24/06/2021 Page: 1 / 1

READY FOR COMMISSIONING SUMMARY

System
Sub-system
Discipline

Description :

SUMMARY
1 READY FOR COMMISSIONING CERTIFICATE

2 WALK DOWN OPERABILITY

3 CONSOLIDATED PUNCH LIST

4 MC ACCEPTANCE CERTIFICATE (COPY)

5 SUB-SYSTEM DESCRIPTION

5.1 Breakdown P&ID (red mark-up "as built")

5.2 Breakdown Single line diagram

5.3 Equipment List (highlighted)

5.4 Line List (highlighted)

5.5 Instrument list

5.6 Loops Diagram

6 VENDORS / MANUFACTURERS GENERAL ARRANGEMENT (PLAN "TQC")

6.1 Mechanical

6.2 Piping

6.3 Electricité/ Instrumentation

7 VENDORS / MANUFACTURERS DATASHEETS FOR EACH EQUIPMENT / ITEM / INSTRUMENT

7.1 Mechanical

7.2 Electricity/ Instrumentation


EPCCS OPTIMISATION DE LA CAPACITE DE
STOCKAGE A LA SONARA
INT-19-0819

READY FOR COMMISSIONING SUMMARY

Rév :00 Doc N°: INT-19-0819-TX-PP-031 Date:24/06/2021 Page: 2 / 1

SUMMARY
8 VENDORS / MANUFACTURERS DATABOOKS

8.1 Fat Reports (Si nécessaire)

8.2 Worksites intervention reports

9 SPECIFIC PROCEDURES (Flushing, blowing, drying, cleaning, reinstatement)

10 PRECOMMISSIONING RECORD SHEETS BY DISCIPLINE

11 MODIFICATION

12 CONSTRUCTORS DECLARATION OF CONFORMITY

13 CERTIFICATES ISSUED BY THIRD PARTY (if needed)