BLOCK 5 - AL SHAHEEN

FIELD Development
GALLAF BATCH 2 PROJECT

PARTIAL TIE-IN DOSSIER

SYSTEM NO. : 98

SYSTEM DESC. :e

SUB-SYSTEM NO. : CDA_VARI_9803

SUB-SYSTEM DESC. : to CD Test Separator (PTS) TIE-IN

LOCATION :C

PLATFORM : CE

Volume 1 of 1
BLOCK 5 - AL SHAHEEN
FIELD Development
GALLAF BATCH 2 PROJECT

TIE-IN DOSSIER

SYSTEM NO. : 93

SYSTEM DESC. : STRUCT.CONDITION MONITORING & CORROSION


PROTECTION
SUB-SYSTEM NO. : EHA_VARI_9301

SUB-SYSTEM DESC. : Cathodic Protection

LOCATION :E

PLATFORM : EH

Volume 1 of 1
TIE-IN DOSSIER

SYSTEM NO. : 75

SYSTEM DESC. : CABLES AND TRAYS

SUB-SYSTEM NO. : EHA_VARI_7501

SUB-SYSTEM DESC. : Multicore Cables - JBs

LOCATION :E

PLATFORM : EH

Volume 1 of 1
TIE-IN DOSSIER

SYSTEM NO. : 75

SYSTEM DESC. : CABLES AND TRAYS

SUB-SYSTEM NO. : EHA_VARI_7502

SUB-SYSTEM DESC. : Cables Ladders and Trays

LOCATION :E

PLATFORM : EH

Volume 1 of 1
BLOCK 5 - AL SHAHEEN FIELD BLOCK 5 - AL SHAHEEN FIELD
Development Development
GALLAF BATCH 2 PROJECT GALLAF BATCH 2 PROJECT

TIE-IN DOSSIER TIE-IN DOSSIER

SYSTEM NO. SYSTEM NO.

99 99
SYSTEM DESCRIPTION SYSTEM DESCRIPTION

TIE-IN E&I TIE-IN E&I

SUB-SYSTEM NO. SUB-SYSTEM NO.

9901 9902
SUB-SYSTEM DESC. SUB-SYSTEM DESC.

EIECTRICAL POWER (11KV)TIE ALTERNATIVE ELECTRIAL


IN POWER (400 V)TIE IN

Location : C LOCATION:C
PLATFORM:CD Platform :CD

Volume 1 of 1 Volume 1 of 1
BLOCK 5 - AL SHAHEEN FIELD BLOCK 5 - AL SHAHEEN FIELD
Development Development
GALLAF BATCH 2 PROJECT GALLAF BATCH 2 PROJECT

TIE-IN DOSSIER TIE-IN DOSSIER

SYSTEM NO. SYSTEM NO.

75 75
SYSTEM DESCRIPTION SYSTEM DESCRIPTION

CABLES AND TRAYS CABLES AND TRAYS

SUB-SYSTEM NO. SUB-SYSTEM NO.

EHA_VARI_7501 EHA_VARI_7502
SUB-SYSTEM DESC. SUB-SYSTEM DESC.

Multicore Cables - JBs Cables Ladders and Trays

Location : E Location : E
Platform : EH Platform : EH

Volume 1 of 1 Volume 1 of 1
1.0 SUB-SYSTEM DEFINITION

2.0 RFC AND AOC CERTIFICATES

3.0 CONSOLIDATED PUNCHLIST


TABLE OF CONTENTS

4.0 SUB-SYSTEM LIMIT DRAWINGS

5.0 PROGRESS SUMMARY

8.0 LIST OF MODIFICATION

9.3 PRESERVATION STATUS


INDUSTRIAL WATER INDUSTRIAL WATER
MANAGEMENT PROJECT MANAGEMENT PROJECT
PRECOMMISSIONING DOSSIER

PRECOMMISSIONING DOSSIER
#REF!

#REF!

#REF! #REF!
#REF! #REF!

SUBSYSTEM SUBSYSTEM

#REF! #REF!

#REF! #REF!
BLOCK 5 - AL SHAHEEN FIELD DEVELOPMENT
GALLAF BATCH 2 PROJECT
TIE-IN PIPING DOSSIER INDEX

SUB-SYSTEM NO.: EHA_VARI_7702 PLATFORM : EH CONTRACT NO. GLF- WHP02-EPCIC4 TICK AS APPROPRIATE

ONSHORE
DESCRIPTION: Temporary Equipment Offshore
OFFSHORE

1.0 SUB-SYSTEM DEFINITION 8.0 LIST OF MODIFICATION

8.1 LIST OF MODIFICATION RECORD SHEETS

2.0 RFC AND AOC CERTIFICATES

3.0 CONSOLIDATED PUNCHLIST 9.0 MISCELLANEOUS DOCUMENTS

( Detail By Discipline ) 9.1 "AS COMMISSIONED" BLIND LIST

9.2 FLANGE MANAGEMENT REPORTS

4.0 SUB-SYSTEM LIMIT DRAWINGS 9.3 PRESERVATION STATUS

( P&ID's, SLD & Layout Drawings ) 9.4 SUBSYSTEM WALKDOWN REPORTS

9.5 COM & SU SPARE PART & SPECIAL TOOLS

5.0 PROGRESS SUMMARY 9.6 RED LINE MARK-UP DRAWINGS

6.0 PIPING (RFC)

6.1 PIPING STATUS INDEX

6.2 PIPING TEST PACK DRAWING LIMITS

6.3 PIPING CHECK SHEETS

6.4 TEST PACKS

7.0 PIPING (AOC)

7.1 TECHNICAL DATABASE

7.2 PVP LEAK TEST

7.3 PVP INERTING/DRYING OUT

7.4 PVP FIRST FILLING

REMARKS:

Notes:
1. All Documents in this Dossier shall be Originals Unless Otherwise Specified. All drawings should be marked up “As Pre-Commissioned or As Commissioned”
2. Tick ( ) for OK & Write ( N/A ) If not applicable.
BLOCK 5 - AL SHAHEEN FIELD DEVELOPMENT
GALLAF BATCH 2 PROJECT
TIE-IN E&I DOSSIER INDEX

SUB-SYSTEM NO.: EHA_SASY_0601 PLATFORM : EH CONTRACT NO. GLF- WHP02-EPCIC4 TICK AS APPROPRIATE

ONSHORE
DESCRIPTION: Life Rafts (Incl. SART)
OFFSHORE

1.0 SUB-SYSTEM DEFINITION 8.0 TELECOM (RFC)

8.1 TELECOM STATUS INDEX

2.0 RFC AND AOC CERTIFICATES 8.2 TELECOM REF. DWG "As-Pre-commissioned"

( INTERCON. DIA., PANEL & G.A. DWG, ETC.)

3.0 CONSOLIDATED PUNCHLIST 8.3 TELECOM CHECK SHEETS

( Detail By Discipline ) 8.4 TELECOM TEST SHEETS

4.0 SUB-SYSTEM LIMIT DRAWINGS 9.0 ELECTRICAL (AOC)

( P&ID's, SLD & Layout Drawings ) 9.1 TECHNICAL DATABASE

9.2 FUNCTIONAL TEST SHEETS

5.0 PROGRESS SUMMARY 9.3 RED LNE MARK-UP REFERENCE DRAWINGS

9.4 DISTRIBUTION BOARD DIAGRAM

6.0 ELECTRICAL (RFC)

6.1 ELECTRICAL STATUS INDEX 10.0 INSTRUMENT (AOC)

6.2 ELECTRICAL REF. DWG "As-Precommissioned" 10.1 TECHNICAL DATABASE

( SLD, DB & G.A. DWG, INTERCON. DIA., ETC.) 10.2 FUNCTIONAL TEST SHEETS

6.3 ELECTRICAL CHECK SHEETS 10.3 RED LNE MARK-UP REFERENCE DRAWINGS

6.4 ELECTRICAL TEST SHEETS

11.0 TELECOM (AOC)

7.0 INSTRUMENT (RFC) 11.1 TECHNICAL DATABASE

7.1 INSTRUMENT STATUS INDEX 11.2 FUNCTIONAL TEST SHEETS

7.2 INSTRUMENT REF. DWG "As-Precommissioned" 11.3 RED LNE MARK-UP REFERENCE DRAWINGS

( ICSS DWG., ESD, F&G, C&E DIAGRAMS, ETC.)

7.3 INSTRUMENT CHECK SHEETS 12.0 MISCELLANEOUS DOCUMENTS

7.4 INSTRUMENT TEST SHEETS 12.1 SAT REPORT (If applicable)

12.2 COMM & SU SPARE PARTS & SPECIAL TOOLS

12.3 LIST OF MODIFICATION

12.4 RED LINE MARK-UP VENDOR DRAWINGS

REMARKS:

Notes:
1. All Documents in this Dossier shall be Originals Unless Otherwise Specified. All drawings should be marked up “As Pre-Commissioned or As Commissioned”
2. Tick ( ) for OK & Write ( N/A ) If not applicable.
Ready For Commissioning Certificate
(RFCC)
Contract No: GLF-WHP02-EPCIC4

SUBSYTEM N° EHA_VARI_7702

SUBSYTEM Name Temporary Equipment Offshore

1 Persuant to COMPANY standards SD-NOC-EC-600, SD-NOC-EC-601, SD-NOC-EC-602, exhibit "A" Work unit 5.5, 7.2 & 7.3, Exhibit "A"

appendix A9 , CONTRACTOR hereby certifies that the following sub-system of the GALLAF BATCH#2 PROJECT are mechanically complete and

have been tested and Pre-commissioned in accordance with the requirements of the CONTRACT and are therefore in readiness for

commencement of the associated commissioning activities, in accordance with the requirements of the CONTRACT, with the exception of

the outstanding items listed on the attached punch list. It is being understood that CONTRACTOR acknowledges and agrees that it is obliged to

complete all of the outstanding items within respective period stated upon the punch list.
2 Issuance of this READY FOR COMMISSIONING CERTIFICATE shall not relieve CONTRACTOR from its warranty obligations and other
provisions of the CONTRACT which expressly or by their nature survive the said Certificate.

NUMBER OF PUNCH LIST ITEMS B :


NUMBER OF PUNCH LIST ITEMS C :

TOTAL NUMBER OF PL ITEMS :

COMMENTS

Issued by Agreed by Approved by Approved by


Contractor CONSTRUCTION Contractor Company Company
COMMISSIONING CONSTRUCTION COMMISSIONING

Name

Position

Date

Signature
ACHIEVEMENT OF COMMISSIONING CERTIFICATE
(AOCC)
Contract No: GLF-WHP02-EPCI4

SUBSYTEM N° EHA_VARI_7702

SUBSYTEM Name Temporary Equipment Offshore

1 Persuant to COMPANY standards SD-NOC-EC-600, SD-NOC-EC-601, SD-NOC-EC-602,, CONTRACTOR hereby certifies that the following

sub-system of the GALLAF BATCH 2 PROJECT are mechanically complete and have been tested and pre-commissioned and commissioned

in accordance with the requirements of the AGREEMENT and are therefore in readiness for commencement of the associated start-up

activities, in accordance with the requirements of the CONTRACT, with the exception of the outstanding items listed upon the attached punch

list. It is being understood that CONTRACTOR acknowledges and agrees that it is obliged to complete all of the outstanding items within

respective period stated upon the punch list.

2 Issuance of this ACHIEVEMENT OF COMMISSIONING CERTIFICATE shall not relieve CONTRACTOR from its warranty obligations and
other provisions of the CONTRACT which expressly or by their nature survive the said certificate.

NUMBER OF PL ITEMS C :

COMMENTS

Agreed by Contractor Approved by Company Approved by Company


COMMISSIONING COMMISSIONING OPERATIONS

Name

Position

Date
Signature
BLOCK 5 – AL SHAHEEN FIELD Development
Gallaf Batch #2 Project

Sub-System Definition
Alternate Electrical power (400 V) TIE IN

Introduction: The Sub-system (VARI_9902) Include the new 400V tier/cubicle FE01 that will
be integrated into existing 400V LV Emergency SWBD ASCDA-N-1805 and will be installed in the
fucture space in adjacent to panels 'FD'&'RD' at electrical substation on CD platform.

Equipment List:

Equipment:ASCDA-N-1805-FE01

Utility Requirement:
Auxilary UPS and No UPS control supply must be available

Detailed Drawing:
1) WHP02-RCE2-ASCYY-07-07001-0001 - C location Key Single Line Diagram
2) WHP02-SM01-ASCDA-07-00021-1001 - CD Equipment& Switchgear Room Layout
3) WHP02-SM01-ASCDA-07-00012-0003- CD SLD Emergency LV SWBD ASCDA -1805

Interface:
The new LV Panel will be integrated into existing Emergency LV SWBD ASCDA-N-1805 located on CD
WHP and interfaced with such as ICSS&SCADA.
Chemicals:
N/A

Safety/Special Considerations:
All Pre-Commissioning & Commissioning activities shall be performing in conformity with the following
documents:

CP-NOC-032 Permit to Work System


CP-NOC-014 HSE Risk Management Framework
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
N/A
Sub-system code Sub-system description
CDA_SASY_0604 Safety Equipments
CDA_VARI_6403 Bridge CA-CD
CDA_VARI_7402 Earthing System
CDA_VARI_7503 Cables - JBs/Trays/Ladders
CDA_VARI_7703 Temporary Equipment
CDA_VARI_9801 to CD/CA Inlet Separator (PHS) TIE-IN
CDA_VARI_9802 to CD Inlet Separator (PHS) TIE-IN
CDA_VARI_9803 to CD Test Separator (PTS) TIE-IN
CDA_VARI_9804 to CD Closed Drain Drum (DPS) TIE-IN
CDA_VARI_9805 to CD Inlet Separator (DPS) TIE-IN
CDA_VARI_9806 Lift Gas from CD TIE IN
CDA_VARI_9807 Sea Water Injection from CD TIE IN
CDA_VARI_9808 HP Flare Header TIE IN
CDA_VARI_9809 Purge Gas TIE IN
CDA_VARI_9810 CD Instrument Air Network TIE IN
CDA_VARI_9811 Utility Air TIE IN
CDA_VARI_9812 Diesel Supply TIE IN
CDA_VARI_9813 Service Water TIE IN
CDA_VARI_9814 Potable Water Tie IN
CDA_VARI_9815 Inert Gas TIE IN
CDA_VARI_9816 Breathing Air TIE IN
CDA_VARI_9817 CD Production Manifold Inlet Separator TIE-IN
CDA_VARI_9818 to/from Fire Water Network TIE IN
CDA_VARI_9819 Open Drain TIE IN
CDA_VARI_9820 WAG Injection from CD TIE IN (Future)
CDA_VARI_9821 Crude Export TIE IN
CDA_VARI_9901 Electrical Power (11 kV) TIE IN
CDA_VARI_9902 Alternate Electrical Power (400 V) TIE IN
CDA_VARI_9903 Instrument and F&G Devices TIE IN
CDA_VARI_9904 SCADA TIE IN
CDA_VARI_9905 F&G TIE IN
CDA_VARI_9906 ESD TIE IN
CDA_VARI_9907 Telecom TIE IN
CEA_AUSY_5001 Closed Drain Collection
CEA_AUSY_5002 Closed Drain Drum and Pumps
CEA_AUSY_5003 Open Drain Collection
CEA_AUSY_5004 Open Drain Tank and Pumps
CEA_AUSY_5201 Potable Water
CEA_AUSY_5202 Service Water
CEA_AUSY_5401 Instrument Air
CEA_AUSY_5402 Utility Air
CEA_AUSY_5403 Breathing Air
CEA_AUSY_5404 Air Compressor Package (Unit A)
CEA_AUSY_5405 Air Compressor Package (Unit B)
CEA_AUSY_5701 Diesel Fuel Network
CEA_AUSY_5901 HPU - Hydraulic Power Unit and Distribution
CEA_DASY_2001 SCADA (including FCW)
CEA_DASY_2002 SWCS System
CEA_DASY_2003 Switchboard & UPS Monitoring
CEA_DASY_2004 MOV System
CEA_DASY_2005 DHG - Downhole Gauge System

Page 83 of 111
CEA_GENE_YY01 Instrument Room
CEA_GENE_YY02 Electrical Room
CEA_GENE_YY03 Battery Room
CEA_LSPS_1201 HVAC System A (AHS, ACU, ACCU, Fan, Ducting)
CEA_LSPS_1202 HVAC System B (AHS, ACU, ACCU, Fan, Ducting)
CEA_LSPS_1203 HVAC Air Intake
CEA_LSPS_1204 HVAC Battery Room
CEA_LSPS_1205 HVAC Control Panel
CEA_LSPS_1401 PABX - Telephone
CEA_LSPS_1402 PA/GA System
CEA_LSPS_1403 Network Cabinet (Phone, Lan, Wifi)
CEA_LSPS_1404 VHF Crane Radio
CEA_LSPS_1405 Fiber Optic Cabling System
CEA_LSPS_1406 Structured Cabling System
CEA_LSPS_1500 Nav. Aids Control Panel (ASCEA-CP-1501) and Distribution
CEA_LSPS_1700 Portable Generator
CEA_LSPS_1801 400 VAC Main Normal LV Switchboard (ASCEA-N-1806) Bus A
CEA_LSPS_1802 400 VAC Main Normal LV Switchboard (ASCEA-N-1806) Bus B
CEA_LSPS_1803 MOV Distribution Board (ASCEA-LP-1807)
CEA_LSPS_1804 11/0.42 kV Transformer (ASCEA-TN-1806)
CEA_LSPS_1805 Lighting and Small Power Distr. Panel (ASCEA-LP-1804)
CEA_LSPS_1806 Lighting and Small Power Distr. Panel (ASCEA-LP-1805)
CEA_LSPS_1807 230 VAC UPS Units (ASCEA-AE-1909) and Distribution Panel (ASCE
CEA_LSPS_1808 Welding Sockets
CEA_LSPS_1809 Crane Auxiliary Supply & Motor Starter
CEA_LSPS_1810 Lighting and Small Power Bus A - Indoor Technical Rooms
CEA_LSPS_1811 Lighting and Small Power Bus B - Indoor Technical Rooms
CEA_LSPS_1812 Lighting and Small Power Bus A - Outdoor Main & Top Decks
CEA_LSPS_1813 Lighting and Small Power Bus B - Outdoor Main & Top Decks
CEA_LSPS_1814 Lighting and Small Power Bus A - Outdoor Mezzanine & Cellar Decks
CEA_LSPS_1815 Lighting and Small Power Bus B - Outdoor Mezzanine & Cellar Decks
CEA_LSPS_1901 230 VAC UPS Batteries
CEA_LSPS_1902 24 VDC UPS Nav. Aids Batteries
CEA_PROS_2901 Lift Gas Flow Line Production Well CE-01
CEA_PROS_2902 Lift Gas Flow Line Production Well CE-02
CEA_PROS_2903 Lift Gas Flow Line Clean up Well CE-03
CEA_PROS_2904 Lift Gas Flow Line Clean up Well CE-04 (Future)
CEA_PROS_2905 Lift Gas Flow Line Clean up Well CE-05
CEA_PROS_2906 Lift Gas Flow Line Clean up Well CE-06
CEA_PROS_2907 Lift Gas Flow Line Production Well CE-07
CEA_PROS_2908 Lift Gas Flow Line Production Well CE-08 (Future)
CEA_PROS_2909 Lift Gas Flow Line Production Well CE-09
CEA_PROS_2910 Lift Gas Flow Line Production Well CE-10
CEA_PROS_2911 Lift Gas Flow Line Clean up Well CE-11
CEA_PROS_2912 Lift Gas Flow Line Clean up Well CE-12
CEA_PROS_2913 Lift Gas Flow Line Production Well CE-13
CEA_PROS_2914 Lift Gas Flow Line Clean up Well CE-14
CEA_PROS_2915 Lift Gas Flow Line Production Well CE-15 (Future)
CEA_PROS_2916 Lift Gas Flow Line Clean up Well CE-16 (Future)
CEA_PROS_2917 Lift Gas Flow Line Production Well CE-17
CEA_PROS_2918 Lift Gas Flow Line Clean up Well CE-18 (Future)
CEA_PROS_2919 Lift Gas Flow Line Production Well CE-19 (Future)

Page 84 of 111
CEA_PROS_2920 Lift Gas Flow Line Clean up Well CE-20
CEA_PROS_2921 Lift Gas Flow Line Clean up Well CE-21
CEA_PROS_2922 Lift Gas Flow Line Production Well CE-22
CEA_PROS_2923 Lift Gas Flow Line Clean up Well CE-23
CEA_PROS_2924 Lift Gas Flow Line Production Well CE-24
CEA_PROS_3001 Production Well CE-01
CEA_PROS_3002 Production Well CE-02
CEA_PROS_3003 Water Injection Well CE-03
CEA_PROS_3004 Water Injection Well CE-04 (Future)
CEA_PROS_3005 Water Injection Well CE-05
CEA_PROS_3006 Water Injection Well CE-06
CEA_PROS_3007 Production Well CE-07
CEA_PROS_3008 Production Well CE-08 (Future)
CEA_PROS_3009 Production Well CE-09
CEA_PROS_3010 Production Well CE-10
CEA_PROS_3011 Water Injection Well CE-11
CEA_PROS_3012 Water Injection Well CE-12
CEA_PROS_3013 Production Well CE-13
CEA_PROS_3014 Water Injection Well CE-14
CEA_PROS_3015 Production Well CE-15 (Future)
CEA_PROS_3016 Water Injection Well CE-16 (Future)
CEA_PROS_3017 Production Well CE-17
CEA_PROS_3018 Water Injection Well CE-18 (Future)
CEA_PROS_3019 Production Well CE-19 (Future)
CEA_PROS_3020 Water Injection Well CE-20
CEA_PROS_3021 Water Injection Well CE-21
CEA_PROS_3022 Production Well CE-22
CEA_PROS_3023 Water Injection Well CE-23
CEA_PROS_3024 Production Well CE-24
CEA_PROS_3101 WHCP - Wellhead Control Panel
CEA_PROS_3301 Flow Line Production Well CE-01
CEA_PROS_3302 Flow Line Production Well CE-02
CEA_PROS_3303 Flow Line Clean up Well CE-03
CEA_PROS_3304 Flow Line Clean up Well CE-04 (Future)
CEA_PROS_3305 Flow Line Clean up Well CE-05
CEA_PROS_3306 Flow Line Clean up Well CE-06
CEA_PROS_3307 Flow Line Production Well CE-07
CEA_PROS_3308 Flow Line Production Well CE-08 (Future)
CEA_PROS_3309 Flow Line Production Well CE-09
CEA_PROS_3310 Flow Line Production Well CE-10
CEA_PROS_3311 Flow Line Clean up Well CE-11
CEA_PROS_3312 Flow Line Clean up Well CE-12
CEA_PROS_3313 Flow Line Production Well CE-13
CEA_PROS_3314 Flow Line Clean up Well CE-14
CEA_PROS_3315 Flow Line Production Well CE-15 (Future)
CEA_PROS_3316 Flow Line Clean up Well CE-16 (Future)
CEA_PROS_3317 Flow Line Production Well CE-17
CEA_PROS_3318 Flow Line Clean up Well CE-18 (Future)
CEA_PROS_3319 Flow Line Production Well CE-19 (Future)
CEA_PROS_3320 Flow Line Clean up Well CE-20
CEA_PROS_3321 Flow Line Clean up Well CE-21
CEA_PROS_3322 Flow Line Production Well CE-22

Page 85 of 111
CEA_PROS_3323 Flow Line Clean up Well CE-23
CEA_PROS_3324 Flow Line Production Well CE-24
CEA_PROS_3380 Production Manifold (EAST/WEST)
CEA_PROS_3381 Test Manifold (EAST/WEST) - MPFM
CEA_PROS_3382 Water Manifold (EAST/WEST)
CEA_PROS_3383 Lift Gas Manifold (EAST/WEST)
CEA_PROS_3503 Flow Line Water Injection Well CE-03
CEA_PROS_3504 Flow Line Water Injection Well CE-04 (Future)
CEA_PROS_3505 Flow Line Water Injection Well CE-05
CEA_PROS_3506 Flow Line Water Injection Well CE-06
CEA_PROS_3511 Flow Line Water Injection Well CE-11
CEA_PROS_3512 Flow Line Water Injection Well CE-12
CEA_PROS_3514 Flow Line Water Injection Well CE-14
CEA_PROS_3516 Flow Line Water Injection Well CE-16 (Future)
CEA_PROS_3518 Flow Line Water Injection Well CE-18 (Future)
CEA_PROS_3520 Flow Line Water Injection Well CE-20
CEA_PROS_3521 Flow Line Water Injection Well CE-21
CEA_PROS_3523 Flow Line Water Injection Well CE-23
CEA_PROS_3901 Downhole Corrosion Inhibitor Unit
CEA_PROS_3902 Topside Corrosion Inhibitor Unit
CEA_PROS_3903 Biocide Unit
CEA_PROS_3904 Demulsifier Unit
CEA_PROS_3905 Antifoam Unit
CEA_PROS_3906 Hypochlorite Unit
CEA_PROS_4001 Flare System
CEA_PROS_4701 Purge Gas
CEA_PROS_4702 WAG Gas (Future)
CEA_SASY_0101 F&G System
CEA_SASY_0102 F&G - Cellar Deck
CEA_SASY_0103 F&G - Mezzanine Deck
CEA_SASY_0104 F&G - Main Deck
CEA_SASY_0105 F&G - Top Deck
CEA_SASY_0106 F&G - E&I Rooms
CEA_SASY_0201 ESD - Emergency Shutdown System
CEA_SASY_0301 Fire Water Network
CEA_SASY_0302 Deluge Valve and Distribution
CEA_SASY_0303 Fire Water Pump
CEA_SASY_0401 Inergen System
CEA_SASY_0601 Life Rafts (Incl. SART)
CEA_SASY_0602 Portable Fire Fighting Equipments
CEA_SASY_0603 Safety Equipments
CEA_SASY_0801 Nitrogen System
CEA_VARI_6101 Pedestal Crane
CEA_VARI_6102 Monorails - Pad Eyes - Handling Devices
CEA_VARI_6401 Topside & Bridge
CEA_VARI_6402 Fire Water Pump Caisson
CEA_VARI_6501 Jacket
CEA_VARI_7401 Earthing System
CEA_VARI_7501 Multicore Cables - JBs
CEA_VARI_7502 Cables Ladders and Trays
CEA_VARI_7601 Insulation Cladding
CEA_VARI_7701 Temporary Equipment Onshore

Page 86 of 111
CEA_VARI_7702 Temporary Equipment Offshore
CEA_VARI_9301 Cathodic Protection
EGA_SASY_0604 Safety Equipments
EGA_VARI_6402 Topside
EGA_VARI_7402 Earthing System
EGA_VARI_7503 Cables - JBs/Trays/Ladders
EGA_VARI_7703 Temporary Equipment
EGA_VARI_9801 From WEST to ED Inlet Separator TIE IN (PHS)
EGA_VARI_9802 From EAST to ED Inlet Separator TIE IN (PHS)
EGA_VARI_9803 to EG Test Separator EAST TIE IN (PTS)
EGA_VARI_9804 to EG Drain Header
EGA_VARI_9805 to EG Closed Drain Header
EGA_VARI_9806 to EG Wet Gas Header (GPS)
EGA_VARI_9807 Lift Gas from ED TIE IN
EGA_VARI_9808 Sea Water Injection Header TIE IN
EGA_VARI_9809 HP Flare Header TIE IN
EGA_VARI_9810 Purge Gas TIE IN
EGA_VARI_9811 Instrument Air Network TIE IN
EGA_VARI_9812 Utility Air TIE IN
EGA_VARI_9813 Diesel Supply TIE IN
EGA_VARI_9814 Service Water TIE IN
EGA_VARI_9815 Potable Water TIE IN
EGA_VARI_9816 Inert Gas TIE IN
EGA_VARI_9817 Breathing Air TIE IN
EGA_VARI_9820 Fire Water Network TIE IN
EGA_VARI_9821 Open Drain TIE IN
EGA_VARI_9822 WAG Injection from EG TIE IN (Future)
EGA_VARI_9901 Electrical Power (3 kV) TIE IN
EGA_VARI_9902 Main Power (400 V) TIE IN
EGA_VARI_9903 Instrument and F&G Devices TIE IN
EGA_VARI_9904 SCADA TIE IN
EGA_VARI_9905 F&G TIE IN
EGA_VARI_9906 ESD TIE IN
EGA_VARI_9907 Telecom TIE IN
EHA_AUSY_5001 Closed Drain Collection
EHA_AUSY_5002 Closed Drain Drum and Pumps
EHA_AUSY_5003 Open Drain Collection
EHA_AUSY_5004 Open Drain Tank and Pumps
EHA_AUSY_5201 Potable Water
EHA_AUSY_5202 Service Water
EHA_AUSY_5401 Instrument Air
EHA_AUSY_5402 Utility Air
EHA_AUSY_5403 Breathing Air
EHA_AUSY_5701 Diesel Fuel Network
EHA_AUSY_5901 HPU - Hydraulic Power Unit and Distribution
EHA_DASY_2001 SCADA (including FCW)
EHA_DASY_2002 SWCS System
EHA_DASY_2003 Switchboard & UPS Monitoring
EHA_DASY_2004 MOV System
EHA_DASY_2005 DHG - Downhole Gauge System
EHA_GENE_YY01 Instrument Room
EHA_GENE_YY02 Electrical Room

Page 87 of 111
EHA_GENE_YY03 Battery Room
EHA_LSPS_1201 HVAC System A (AHS, ACU, ACCU, Fan, Ducting)
EHA_LSPS_1202 HVAC System B (AHS, ACU, ACCU, Fan, Ducting)
EHA_LSPS_1203 HVAC Air Intake
EHA_LSPS_1204 HVAC Battery Room
EHA_LSPS_1205 HVAC Control Panel
EHA_LSPS_1401 PABX - Telephone
EHA_LSPS_1402 PA/GA System
EHA_LSPS_1403 Network Cabinet (Phone, Lan, Wifi)
EHA_LSPS_1404 VHF Crane Radio
EHA_LSPS_1405 Fiber Optic Cabling System
EHA_LSPS_1406 Structured Cabling System
EHA_LSPS_1500 Lanterns for Nav. Aids
EHA_LSPS_1700 Portable Generator
EHA_LSPS_1801 400 VAC Main Normal LV Switchboard (ASEHA-N-1806) Bus A
EHA_LSPS_1802 400 VAC Main Normal LV Switchboard (ASEHA-N-1806) Bus B
EHA_LSPS_1803 MOV Distribution Board (ASEHA-LP-1807)
EHA_LSPS_1804 3/0.42 kV Transformer (ASEHA-TN-1806)
EHA_LSPS_1805 Lighting and Small Power Distr. Panel (ASEHA -LP-1804)
EHA_LSPS_1806 Lighting and Small Power Distr. Panel (ASEHA -LP-1805)
EHA_LSPS_1807 230 VAC UPS Units (ASEHA-AE-1909) and Distribution Panel (ASEH
EHA_LSPS_1808 Welding Sockets
EHA_LSPS_1809 Crane Auxiliary Supply & Motor Starter
EHA_LSPS_1810 Lighting and Small Power Bus A - Indoor Technical Rooms
EHA_LSPS_1811 Lighting and Small Power Bus B - Indoor Technical Rooms
EHA_LSPS_1812 Lighting and Small Power Bus A - Outdoor Main & Top Decks
EHA_LSPS_1813 Lighting and Small Power Bus B - Outdoor Main & Top Decks
EHA_LSPS_1814 Lighting and Small Power Bus A - Outdoor Mezzanine & Cellar Decks
EHA_LSPS_1815 Lighting and Small Power Bus B - Outdoor Mezzanine & Cellar Decks
EHA_LSPS_1901 230 VAC UPS Batteries
EHA_PROS_2901 Lift Gas Flow Line Production Well EH-01
EHA_PROS_2902 Lift Gas Flow Line Clean up Well EH-02
EHA_PROS_2903 Lift Gas Flow Line Production Well EH-03
EHA_PROS_2904 Lift Gas Flow Line Production Well EH-04
EHA_PROS_2905 Lift Gas Flow Line Clean up Well EH-05
EHA_PROS_2906 Lift Gas Flow Line Production Well EH-06
EHA_PROS_2907 Lift Gas Flow Line Clean up Well EH-07
EHA_PROS_2908 Lift Gas Flow Line Clean up Well EH-08
EHA_PROS_2909 Lift Gas Flow Line Production Well EH-09
EHA_PROS_2910 Lift Gas Flow Line Production Well EH-10
EHA_PROS_2911 Lift Gas Flow Line Clean up Well EH-11 (Future)
EHA_PROS_2912 Lift Gas Flow Line Production Well EH-12
EHA_PROS_2913 Lift Gas Flow Line Clean up Well EH-13 (Future)
EHA_PROS_2914 Lift Gas Flow Line Production Well EH-14
EHA_PROS_2915 Lift Gas Flow Line Production Well EH-15
EHA_PROS_2916 Lift Gas Flow Line Clean up Well EH-16
EHA_PROS_2917 Lift Gas Flow Line Clean up Well EH-17
EHA_PROS_2918 Lift Gas Flow Line Clean up Well EH-18
EHA_PROS_2919 Lift Gas Flow Line Production Well EH-19
EHA_PROS_2920 Lift Gas Flow Line Production Well EH-20
EHA_PROS_2921 Lift Gas Flow Line Production Well EH-21
EHA_PROS_2922 Lift Gas Flow Line Clean up Well EH-22

Page 88 of 111
EHA_PROS_2923 Lift Gas Flow Line Production Well EH-23
EHA_PROS_2924 Lift Gas Flow Line Clean up Well EH-24
EHA_PROS_3001 Production Well EH-01
EHA_PROS_3002 Water Injection Well EH-02
EHA_PROS_3003 Production Well EH-03
EHA_PROS_3004 Production Well EH-04
EHA_PROS_3005 Water Injection Well EH-05
EHA_PROS_3006 Production Well EH-06
EHA_PROS_3007 Water Injection Well EH-07
EHA_PROS_3008 Water Injection Well EH-08
EHA_PROS_3009 Production Well EH-09
EHA_PROS_3010 Production Well EH-10
EHA_PROS_3011 Water Injection Well EH-11 (Future)
EHA_PROS_3012 Production Well EH-12
EHA_PROS_3013 Water Injection Well EH-13 (Future)
EHA_PROS_3014 Production Well EH-14
EHA_PROS_3015 Production Well EH-15
EHA_PROS_3016 Water Injection Well EH-16
EHA_PROS_3017 Water Injection Well EH-17
EHA_PROS_3018 Water Injection Well EH-18
EHA_PROS_3019 Production Well EH-19
EHA_PROS_3020 Production Well EH-20
EHA_PROS_3021 Production Well EH-21
EHA_PROS_3022 Water Injection Well EH-22
EHA_PROS_3023 Production Well EH-23
EHA_PROS_3024 Water Injection Well EH-24
EHA_PROS_3101 WHCP - Wellhead Control Panel
EHA_PROS_3301 Flow Line Production Well EH-01
EHA_PROS_3302 Flow Line Clean up Well EH-02
EHA_PROS_3303 Flow Line Production Well EH-03
EHA_PROS_3304 Flow Line Production Well EH-04
EHA_PROS_3305 Flow Line Clean up Well EH-05
EHA_PROS_3306 Flow Line Production Well EH-06
EHA_PROS_3307 Flow Line Clean up Well EH-07
EHA_PROS_3308 Flow Line Clean up Well EH-08
EHA_PROS_3309 Flow Line Production Well EH-09
EHA_PROS_3310 Flow Line Production Well EH-10
EHA_PROS_3311 Flow Line Clean up Well EH-11 (Future)
EHA_PROS_3312 Flow Line Production Well EH-12
EHA_PROS_3313 Flow Line Clean up Well EH-13 (Future)
EHA_PROS_3314 Flow Line Production Well EH-14
EHA_PROS_3315 Flow Line Production Well EH-15
EHA_PROS_3316 Flow Line Clean up Well EH-16
EHA_PROS_3317 Flow Line Clean up Well EH-17
EHA_PROS_3318 Flow Line Clean up Well EH-18
EHA_PROS_3319 Flow Line Production Well EH-19
EHA_PROS_3320 Flow Line Production Well EH-20
EHA_PROS_3321 Flow Line Production Well EH-21
EHA_PROS_3322 Flow Line Clean up Well EH-22
EHA_PROS_3323 Flow Line Production Well EH-23
EHA_PROS_3324 Flow Line Clean up Well EH-24
EHA_PROS_3380 Production Manifold (EAST/WEST)

Page 89 of 111
EHA_PROS_3381 Test Manifold (EAST/WEST) - MPFM
EHA_PROS_3382 Water Manifold (EAST/WEST)
EHA_PROS_3383 Lift Gas Manifold (EAST/WEST)
EHA_PROS_3502 Flow Line Water Injection Well EH-02
EHA_PROS_3505 Flow Line Water Injection Well EH-05
EHA_PROS_3507 Flow Line Water Injection Well EH-07
EHA_PROS_3508 Flow Line Water Injection Well EH-08
EHA_PROS_3511 Flow Line Water Injection Well EH-11 (Future)
EHA_PROS_3513 Flow Line Water Injection Well EH-13 (Future)
EHA_PROS_3516 Flow Line Water Injection Well EH-16
EHA_PROS_3517 Flow Line Water Injection Well EH-17
EHA_PROS_3518 Flow Line Water Injection Well EH-18
EHA_PROS_3522 Flow Line Water Injection Well EH-22
EHA_PROS_3524 Flow Line Water Injection Well EH-24
EHA_PROS_3901 Downhole Corrosion Inhibitor Unit
EHA_PROS_3902 Topside Corrosion Inhibitor Unit
EHA_PROS_3903 Biocide Unit
EHA_PROS_3904 Demulsifier Unit
EHA_PROS_3905 Antifoam Unit
EHA_PROS_4001 Flare System
EHA_PROS_4701 Purge Gas
EHA_PROS_4702 WAG Gas (Future)
EHA_SASY_0101 F&G System
EHA_SASY_0102 F&G - Cellar Deck
EHA_SASY_0103 F&G - Mezzanine Deck
EHA_SASY_0104 F&G - Main Deck
EHA_SASY_0105 F&G - Top Deck
EHA_SASY_0106 F&G - E&I Rooms
EHA_SASY_0201 ESD - Emergency Shutdown System
EHA_SASY_0301 Fire Water Network
EHA_SASY_0302 Deluge Valve and Distribution
EHA_SASY_0401 Inergen System
EHA_SASY_0601 Life Rafts (Incl. SART)
EHA_SASY_0602 Portable Fire Fighting Equipments
EHA_SASY_0603 Safety Equipments
EHA_SASY_0801 Nitrogen System
EHA_VARI_6101 Pedestal Crane
EHA_VARI_6102 Monorails - Pad Eyes - Handling Devices
EHA_VARI_6401 Topside & Bridge
EHA_VARI_6501 Jacket
EHA_VARI_7401 Earthing System
EHA_VARI_7501 Multicore Cables - JBs
EHA_VARI_7502 Cables Ladders and Trays
EHA_VARI_7601 Insulation Cladding
EHA_VARI_7701 Temporary Equipment Onshore
EHA_VARI_7702 Temporary Equipment Offshore
EHA_VARI_9301 Cathodic Protection

Page 90 of 111
System code System description Location
CDA_SASY_06 06 SAFETY EQUIPMENT C
CDA_VARI_64 64 STRUCTURE ABOVE WATER C
CDA_VARI_74 74 EARTHING C
CDA_VARI_75 75 CABLES AND TRAYS C
CDA_VARI_77 77 TEMPORARY EQUIPMENT C
CDA_VARI_98 98 TIE-IN PIPING ( UTILITIES +PROCESS ) C
CDA_VARI_98 98 TIE-IN PIPING ( UTILITIES +PROCESS ) C
CDA_VARI_98 98 TIE-IN PIPING ( UTILITIES +PROCESS ) C
CDA_VARI_98 98 TIE-IN PIPING ( UTILITIES +PROCESS ) C
CDA_VARI_98 98 TIE-IN PIPING ( UTILITIES +PROCESS ) C
CDA_VARI_98 98 TIE-IN PIPING ( UTILITIES +PROCESS ) C
CDA_VARI_98 98 TIE-IN PIPING ( UTILITIES +PROCESS ) C
CDA_VARI_98 98 TIE-IN PIPING ( UTILITIES +PROCESS ) C
CDA_VARI_98 98 TIE-IN PIPING ( UTILITIES +PROCESS ) C
CDA_VARI_98 98 TIE-IN PIPING ( UTILITIES +PROCESS ) C
CDA_VARI_98 98 TIE-IN PIPING ( UTILITIES +PROCESS ) C
CDA_VARI_98 98 TIE-IN PIPING ( UTILITIES +PROCESS ) C
CDA_VARI_98 98 TIE-IN PIPING ( UTILITIES +PROCESS ) C
CDA_VARI_98 98 TIE-IN PIPING ( UTILITIES +PROCESS ) C
CDA_VARI_98 98 TIE-IN PIPING ( UTILITIES +PROCESS ) C
CDA_VARI_98 98 TIE-IN PIPING ( UTILITIES +PROCESS ) C
CDA_VARI_98 98 TIE-IN PIPING ( UTILITIES +PROCESS ) C
CDA_VARI_98 98 TIE-IN PIPING ( UTILITIES +PROCESS ) C
CDA_VARI_98 98 TIE-IN PIPING ( UTILITIES +PROCESS ) C
CDA_VARI_98 98 TIE-IN PIPING ( UTILITIES +PROCESS ) C
CDA_VARI_98 98 TIE-IN PIPING ( UTILITIES +PROCESS ) C
CDA_VARI_99 99 TIE-IN E&I C
CDA_VARI_99 99 TIE-IN E&I C
CDA_VARI_99 99 TIE-IN E&I C
CDA_VARI_99 99 TIE-IN E&I C
CDA_VARI_99 99 TIE-IN E&I C
CDA_VARI_99 99 TIE-IN E&I C
CDA_VARI_99 99 TIE-IN E&I C
CEA_AUSY_50 50 OPEN AND CLOSED DRAINS C
CEA_AUSY_50 50 OPEN AND CLOSED DRAINS C
CEA_AUSY_50 50 OPEN AND CLOSED DRAINS C
CEA_AUSY_50 50 OPEN AND CLOSED DRAINS C
CEA_AUSY_52 52 SERVICE WATER C
CEA_AUSY_52 52 SERVICE WATER C
CEA_AUSY_54 54 INSTRUMENT AND UTILITY AIR C
CEA_AUSY_54 54 INSTRUMENT AND UTILITY AIR C
CEA_AUSY_54 54 INSTRUMENT AND UTILITY AIR C
CEA_AUSY_54 54 INSTRUMENT AND UTILITY AIR C
CEA_AUSY_54 54 INSTRUMENT AND UTILITY AIR C
CEA_AUSY_57 57 DIESEL AND FUEL GAS C
CEA_AUSY_59 59 HYDRAULIC SYSTEMS C
CEA_DASY_20 20 SCADA C
CEA_DASY_20 20 SCADA C
CEA_DASY_20 20 SCADA C
CEA_DASY_20 20 SCADA C
CEA_DASY_20 20 SCADA C

Page 91 of 111
CEA_GENE_YY YY GENERAL C
CEA_GENE_YY YY GENERAL C
CEA_GENE_YY YY GENERAL C
CEA_LSPS_12 12 HVAC C
CEA_LSPS_12 12 HVAC C
CEA_LSPS_12 12 HVAC C
CEA_LSPS_12 12 HVAC C
CEA_LSPS_12 12 HVAC C
CEA_LSPS_14 14 COMMUNICATION SYSTEMS C
CEA_LSPS_14 14 COMMUNICATION SYSTEMS C
CEA_LSPS_14 14 COMMUNICATION SYSTEMS C
CEA_LSPS_14 14 COMMUNICATION SYSTEMS C
CEA_LSPS_14 14 COMMUNICATION SYSTEMS C
CEA_LSPS_14 14 COMMUNICATION SYSTEMS C
CEA_LSPS_15 15 NAVIGATIONAL AIDS SYSTEMS C
CEA_LSPS_17 17 GENERATOR, DIESEL & GAS ENGINE DRIVEN C
CEA_LSPS_18 18 ELECTRICAL DISTRIBUTION C
CEA_LSPS_18 18 ELECTRICAL DISTRIBUTION C
CEA_LSPS_18 18 ELECTRICAL DISTRIBUTION C
CEA_LSPS_18 18 ELECTRICAL DISTRIBUTION C
CEA_LSPS_18 18 ELECTRICAL DISTRIBUTION C
CEA_LSPS_18 18 ELECTRICAL DISTRIBUTION C
CEA_LSPS_18 18 ELECTRICAL DISTRIBUTION C
CEA_LSPS_18 18 ELECTRICAL DISTRIBUTION C
CEA_LSPS_18 18 ELECTRICAL DISTRIBUTION C
CEA_LSPS_18 18 ELECTRICAL DISTRIBUTION C
CEA_LSPS_18 18 ELECTRICAL DISTRIBUTION C
CEA_LSPS_18 18 ELECTRICAL DISTRIBUTION C
CEA_LSPS_18 18 ELECTRICAL DISTRIBUTION C
CEA_LSPS_18 18 ELECTRICAL DISTRIBUTION C
CEA_LSPS_18 18 ELECTRICAL DISTRIBUTION C
CEA_LSPS_19 19 UPS (BATTERIES,BATTERY CHARGERS,INVERTERS in UP C
CEA_LSPS_19 19 UPS (BATTERIES,BATTERY CHARGERS,INVERTERS in UP C
CEA_PROS_29 29 GAS LIFTS C
CEA_PROS_29 29 GAS LIFTS C
CEA_PROS_29 29 GAS LIFTS C
CEA_PROS_29 29 GAS LIFTS C
CEA_PROS_29 29 GAS LIFTS C
CEA_PROS_29 29 GAS LIFTS C
CEA_PROS_29 29 GAS LIFTS C
CEA_PROS_29 29 GAS LIFTS C
CEA_PROS_29 29 GAS LIFTS C
CEA_PROS_29 29 GAS LIFTS C
CEA_PROS_29 29 GAS LIFTS C
CEA_PROS_29 29 GAS LIFTS C
CEA_PROS_29 29 GAS LIFTS C
CEA_PROS_29 29 GAS LIFTS C
CEA_PROS_29 29 GAS LIFTS C
CEA_PROS_29 29 GAS LIFTS C
CEA_PROS_29 29 GAS LIFTS C
CEA_PROS_29 29 GAS LIFTS C
CEA_PROS_29 29 GAS LIFTS C

Page 92 of 111
CEA_PROS_29 29 GAS LIFTS C
CEA_PROS_29 29 GAS LIFTS C
CEA_PROS_29 29 GAS LIFTS C
CEA_PROS_29 29 GAS LIFTS C
CEA_PROS_29 29 GAS LIFTS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_30 30 WELL & WELLHEADS C
CEA_PROS_31 31 WELL HEAD CONTROL PANEL C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C

Page 93 of 111
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES C
CEA_PROS_35 35 WATER INJECTION SYSTEMS C
CEA_PROS_35 35 WATER INJECTION SYSTEMS C
CEA_PROS_35 35 WATER INJECTION SYSTEMS C
CEA_PROS_35 35 WATER INJECTION SYSTEMS C
CEA_PROS_35 35 WATER INJECTION SYSTEMS C
CEA_PROS_35 35 WATER INJECTION SYSTEMS C
CEA_PROS_35 35 WATER INJECTION SYSTEMS C
CEA_PROS_35 35 WATER INJECTION SYSTEMS C
CEA_PROS_35 35 WATER INJECTION SYSTEMS C
CEA_PROS_35 35 WATER INJECTION SYSTEMS C
CEA_PROS_35 35 WATER INJECTION SYSTEMS C
CEA_PROS_35 35 WATER INJECTION SYSTEMS C
CEA_PROS_39 39 CHEMICAL INJECTION SYSTEM C
CEA_PROS_39 39 CHEMICAL INJECTION SYSTEM C
CEA_PROS_39 39 CHEMICAL INJECTION SYSTEM C
CEA_PROS_39 39 CHEMICAL INJECTION SYSTEM C
CEA_PROS_39 39 CHEMICAL INJECTION SYSTEM C
CEA_PROS_39 39 CHEMICAL INJECTION SYSTEM C
CEA_PROS_40 40 FLARE AND VENT SYSTEMS C
CEA_PROS_47 47 GAS PROCESSING C
CEA_PROS_47 47 GAS PROCESSING C
CEA_SASY_01 01 FIRE & GAS (F&G) SYSTEMS C
CEA_SASY_01 01 FIRE & GAS (F&G) SYSTEMS C
CEA_SASY_01 01 FIRE & GAS (F&G) SYSTEMS C
CEA_SASY_01 01 FIRE & GAS (F&G) SYSTEMS C
CEA_SASY_01 01 FIRE & GAS (F&G) SYSTEMS C
CEA_SASY_01 01 FIRE & GAS (F&G) SYSTEMS C
CEA_SASY_02 02 EMERGENCY SHUT DOWN (ESD) SYSTEM C
CEA_SASY_03 03 FIRE WATER SYSTEMS C
CEA_SASY_03 03 FIRE WATER SYSTEMS C
CEA_SASY_03 03 FIRE WATER SYSTEMS C
CEA_SASY_04 04 FIRE FIGHTING SYSTEMS C
CEA_SASY_06 06 SAFETY EQUIPMENT C
CEA_SASY_06 06 SAFETY EQUIPMENT C
CEA_SASY_06 06 SAFETY EQUIPMENT C
CEA_SASY_08 08 INERT GAS C
CEA_VARI_61 61 CRANES & HOISTING EQUIPMENT C
CEA_VARI_61 61 CRANES & HOISTING EQUIPMENT C
CEA_VARI_64 64 STRUCTURE ABOVE WATER C
CEA_VARI_64 64 STRUCTURE ABOVE WATER C
CEA_VARI_65 65 STRUCTURE BELOW WATER C
CEA_VARI_74 74 EARTHING C
CEA_VARI_75 75 CABLES AND TRAYS C
CEA_VARI_75 75 CABLES AND TRAYS C
CEA_VARI_76 76 INSULATION C
CEA_VARI_77 77 TEMPORARY EQUIPMENT C

Page 94 of 111
CEA_VARI_77 77 TEMPORARY EQUIPMENT C
CEA_VARI_93 93 STRUCT.CONDITION MONITORING & CORROSION PROTE C
EGA_SASY_06 06 SAFETY EQUIPMENT E
EGA_VARI_64 64 STRUCTURE ABOVE WATER E
EGA_VARI_74 74 EARTHING E
EGA_VARI_75 75 CABLES AND TRAYS E
EGA_VARI_77 77 TEMPORARY EQUIPMENT E
EGA_VARI_98 98 TIE IN PIPING ( UTILITIES +PROCESS ) E
EGA_VARI_98 98 TIE IN PIPING ( UTILITIES +PROCESS ) E
EGA_VARI_98 98 TIE IN PIPING ( UTILITIES +PROCESS ) E
EGA_VARI_98 98 TIE IN PIPING ( UTILITIES +PROCESS ) E
EGA_VARI_98 98 TIE IN PIPING ( UTILITIES +PROCESS ) E
EGA_VARI_98 98 TIE IN PIPING ( UTILITIES +PROCESS ) E
EGA_VARI_98 98 TIE IN PIPING ( UTILITIES +PROCESS ) E
EGA_VARI_98 98 TIE IN PIPING ( UTILITIES +PROCESS ) E
EGA_VARI_98 98 TIE IN PIPING ( UTILITIES +PROCESS ) E
EGA_VARI_98 98 TIE IN PIPING ( UTILITIES +PROCESS ) E
EGA_VARI_98 98 TIE IN PIPING ( UTILITIES +PROCESS ) E
EGA_VARI_98 98 TIE IN PIPING ( UTILITIES +PROCESS ) E
EGA_VARI_98 98 TIE IN PIPING ( UTILITIES +PROCESS ) E
EGA_VARI_98 98 TIE IN PIPING ( UTILITIES +PROCESS ) E
EGA_VARI_98 98 TIE IN PIPING ( UTILITIES +PROCESS ) E
EGA_VARI_98 98 TIE IN PIPING ( UTILITIES +PROCESS ) E
EGA_VARI_98 98 TIE IN PIPING ( UTILITIES +PROCESS ) E
EGA_VARI_98 98 TIE IN PIPING ( UTILITIES +PROCESS ) E
EGA_VARI_98 98 TIE IN PIPING ( UTILITIES +PROCESS ) E
EGA_VARI_98 98 TIE IN PIPING ( UTILITIES +PROCESS ) E
EGA_VARI_99 99 TIE IN E&I E
EGA_VARI_99 99 TIE IN E&I E
EGA_VARI_99 99 TIE IN E&I E
EGA_VARI_99 99 TIE IN E&I E
EGA_VARI_99 99 TIE IN E&I E
EGA_VARI_99 99 TIE IN E&I E
EGA_VARI_99 99 TIE IN E&I E
EHA_AUSY_50 50 OPEN AND CLOSED DRAINS E
EHA_AUSY_50 50 OPEN AND CLOSED DRAINS E
EHA_AUSY_50 50 OPEN AND CLOSED DRAINS E
EHA_AUSY_50 50 OPEN AND CLOSED DRAINS E
EHA_AUSY_52 52 SERVICE WATER E
EHA_AUSY_52 52 SERVICE WATER E
EHA_AUSY_54 54 INSTRUMENT AND UTILITY AIR E
EHA_AUSY_54 54 INSTRUMENT AND UTILITY AIR E
EHA_AUSY_54 54 INSTRUMENT AND UTILITY AIR E
EHA_AUSY_57 57 DIESEL AND FUEL GAS E
EHA_AUSY_59 59 HYDRAULIC SYSTEMS E
EHA_DASY_20 20 SCADA E
EHA_DASY_20 20 SCADA E
EHA_DASY_20 20 SCADA E
EHA_DASY_20 20 SCADA E
EHA_DASY_20 20 SCADA E
EHA_GENE_YY YY GENERAL E
EHA_GENE_YY YY GENERAL E

Page 95 of 111
EHA_GENE_YY YY GENERAL E
EHA_LSPS_12 12 HVAC E
EHA_LSPS_12 12 HVAC E
EHA_LSPS_12 12 HVAC E
EHA_LSPS_12 12 HVAC E
EHA_LSPS_12 12 HVAC E
EHA_LSPS_14 14 COMMUNICATION SYSTEMS E
EHA_LSPS_14 14 COMMUNICATION SYSTEMS E
EHA_LSPS_14 14 COMMUNICATION SYSTEMS E
EHA_LSPS_14 14 COMMUNICATION SYSTEMS E
EHA_LSPS_14 14 COMMUNICATION SYSTEMS E
EHA_LSPS_14 14 COMMUNICATION SYSTEMS E
EHA_LSPS_15 15 NAVIGATIONAL AIDS SYSTEMS E
EHA_LSPS_17 17 GENERATOR, DIESEL & GAS ENGINE DRIVEN E
EHA_LSPS_18 18 ELECTRICAL DISTRIBUTION E
EHA_LSPS_18 18 ELECTRICAL DISTRIBUTION E
EHA_LSPS_18 18 ELECTRICAL DISTRIBUTION E
EHA_LSPS_18 18 ELECTRICAL DISTRIBUTION E
EHA_LSPS_18 18 ELECTRICAL DISTRIBUTION E
EHA_LSPS_18 18 ELECTRICAL DISTRIBUTION E
EHA_LSPS_18 18 ELECTRICAL DISTRIBUTION E
EHA_LSPS_18 18 ELECTRICAL DISTRIBUTION E
EHA_LSPS_18 18 ELECTRICAL DISTRIBUTION E
EHA_LSPS_18 18 ELECTRICAL DISTRIBUTION E
EHA_LSPS_18 18 ELECTRICAL DISTRIBUTION E
EHA_LSPS_18 18 ELECTRICAL DISTRIBUTION E
EHA_LSPS_18 18 ELECTRICAL DISTRIBUTION E
EHA_LSPS_18 18 ELECTRICAL DISTRIBUTION E
EHA_LSPS_18 18 ELECTRICAL DISTRIBUTION E
EHA_LSPS_19 19 UPS (BATTERIES,BATTERY CHARGERS,INVERTERS in UP E
EHA_PROS_29 29 GAS LIFTS E
EHA_PROS_29 29 GAS LIFTS E
EHA_PROS_29 29 GAS LIFTS E
EHA_PROS_29 29 GAS LIFTS E
EHA_PROS_29 29 GAS LIFTS E
EHA_PROS_29 29 GAS LIFTS E
EHA_PROS_29 29 GAS LIFTS E
EHA_PROS_29 29 GAS LIFTS E
EHA_PROS_29 29 GAS LIFTS E
EHA_PROS_29 29 GAS LIFTS E
EHA_PROS_29 29 GAS LIFTS E
EHA_PROS_29 29 GAS LIFTS E
EHA_PROS_29 29 GAS LIFTS E
EHA_PROS_29 29 GAS LIFTS E
EHA_PROS_29 29 GAS LIFTS E
EHA_PROS_29 29 GAS LIFTS E
EHA_PROS_29 29 GAS LIFTS E
EHA_PROS_29 29 GAS LIFTS E
EHA_PROS_29 29 GAS LIFTS E
EHA_PROS_29 29 GAS LIFTS E
EHA_PROS_29 29 GAS LIFTS E
EHA_PROS_29 29 GAS LIFTS E

Page 96 of 111
EHA_PROS_29 29 GAS LIFTS E
EHA_PROS_29 29 GAS LIFTS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_30 30 WELL & WELLHEADS E
EHA_PROS_31 31 WELL HEAD CONTROL PANEL E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E

Page 97 of 111
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_33 33 WELLHEAD MANIFOLDS AND FLOWLINES E
EHA_PROS_35 35 WATER INJECTION SYSTEMS E
EHA_PROS_35 35 WATER INJECTION SYSTEMS E
EHA_PROS_35 35 WATER INJECTION SYSTEMS E
EHA_PROS_35 35 WATER INJECTION SYSTEMS E
EHA_PROS_35 35 WATER INJECTION SYSTEMS E
EHA_PROS_35 35 WATER INJECTION SYSTEMS E
EHA_PROS_35 35 WATER INJECTION SYSTEMS E
EHA_PROS_35 35 WATER INJECTION SYSTEMS E
EHA_PROS_35 35 WATER INJECTION SYSTEMS E
EHA_PROS_35 35 WATER INJECTION SYSTEMS E
EHA_PROS_35 35 WATER INJECTION SYSTEMS E
EHA_PROS_39 39 WATER INJECTION SYSTEMS E
EHA_PROS_39 39 WATER INJECTION SYSTEMS E
EHA_PROS_39 39 CHEMICAL INJECTION SYSTEM E
EHA_PROS_39 39 CHEMICAL INJECTION SYSTEM E
EHA_PROS_39 39 CHEMICAL INJECTION SYSTEM E
EHA_PROS_40 40 FLARE AND VENT SYSTEMS E
EHA_PROS_47 47 GAS PROCESSING E
EHA_PROS_47 47 GAS PROCESSING E
EHA_SASY_01 01 FIRE & GAS (F&G) SYSTEMS E
EHA_SASY_01 01 FIRE & GAS (F&G) SYSTEMS E
EHA_SASY_01 01 FIRE & GAS (F&G) SYSTEMS E
EHA_SASY_01 01 FIRE & GAS (F&G) SYSTEMS E
EHA_SASY_01 01 FIRE & GAS (F&G) SYSTEMS E
EHA_SASY_01 01 FIRE & GAS (F&G) SYSTEMS E
EHA_SASY_02 02 EMERGENCY SHUT DOWN (ESD) SYSTEM E
EHA_SASY_03 03 FIRE WATER SYSTEMS E
EHA_SASY_03 03 FIRE WATER SYSTEMS E
EHA_SASY_04 04 FIRE FIGHTING SYSTEMS E
EHA_SASY_06 06 SAFETY EQUIPMENT E
EHA_SASY_06 06 SAFETY EQUIPMENT E
EHA_SASY_06 06 SAFETY EQUIPMENT E
EHA_SASY_08 08 INERT GAS E
EHA_VARI_61 61 CRANES & HOISTING EQUIPMENT E
EHA_VARI_61 61 CRANES & HOISTING EQUIPMENT E
EHA_VARI_64 64 STRUCTURE ABOVE WATER E
EHA_VARI_65 65 STRUCTURE BELOW WATER E
EHA_VARI_74 74 EARTHING E
EHA_VARI_75 75 CABLES AND TRAYS E
EHA_VARI_75 75 CABLES AND TRAYS E
EHA_VARI_76 76 INSULATION E
EHA_VARI_77 77 TEMPORARY EQUIPMENT E
EHA_VARI_77 77 TEMPORARY EQUIPMENT E
EHA_VARI_93 93 STRUCT.CONDITION MONITORING & CORROSION PROTE E

Page 98 of 111
Platform
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE

Page 99 of 111
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE

Page 100 of 111


CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE

Page 101 of 111


CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE
CE

Page 102 of 111


CE
CE
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH

Page 103 of 111


EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH

Page 104 of 111


EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH

Page 105 of 111


EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH
EH

Page 106 of 111


Safety/Special Considerations:

All Pre-Commissioning & Commissioning activities shall be performing in conformity with the following documents:

CP-NOC-032

CP-NOC-014

WHP02-SMO1-ASYYY-18-282021-0001

WHP02-SMO1-ASYYY-26-282012-0001
the following documents:
Permit to Work System

HSE Risk Management Framework

CE & EH WHP-PROJECT OFFSHORE HSE PLAN

CE & EH WHP-Pre-Commissioning and Commis


tem

ment Framework

JECT OFFSHORE HSE PLAN

Commissioning and Commissioning Execution Plan