WEEKLY SITE VISIT QUALITY INSPECTION REPORT FOR PB
Subject-: QA/QC CHECK
Quality control
1 6/6/2023 6/13/2023 7
documents
Box type
2 6/13/2023 6/16/2023 3 membrane water Footing Below Footing
proofing
Box type
3 6/13/2023 6/16/2023 3 membrane water Footing Below Footing
proofing
Compressive
5 6/20/2023 6/26/2023 6 Footing Pour-01
strength
Manufacturers test
7 6/20/2023 6/20/2023 0 Footing Pour 01 to 03
reports
8 6/20/2023 6/23/2023 3 Concrete Casting Footing Pour 02/03
Column /
9 6/27/2023 6/28/2023 1 Steel work Pour-03
Shear wall
Basement
10 6/27/2023 7/8/2023 11 Concrete work Pour-03
footing
11 7/4/2023 7/4/2023 0 Quality Docs.
Basement
14 8/5/2023 8/12/2023 7 House keeping All
footing
15 8/5/2023 8/12/2023 7 Steel work UGF LW11
Pour Card No 54
31 9/2/2023 117 QA/QC Docs.
& 55
32 9/2/2023 117 QA/QC Docs. Pour Card
ALITY INSPECTION REPORT FOR PB - GLOBAL, GHODBANDAR ROAD,THANE OF RUNWAL
STATUS TO BE ADDRESSED BY
OBSERVATIONS (To be filled by
SGS) Contractor Sub-Contractor
Trial Mix concrete of batching plant TNA for M40TCC has M/S.
Closed
been verified & found Satisfactory SENGHANI
Compressive strength of concrete of 3 days for pour 01 has M/S.
Closed
been found unadequate to be review at 7days SENGHANI
Steel MTC & Third party test reports has been verified and M/S.
Closed
found satisfactory SENGHANI
MTC for Cover,Binding wire & Coupler has been verified and M/S.
Closed
found satisfactory SENGHANI
Proper temporary tarpoulin shed to be erect to cover M/S.
Closed
concreting SENGHANI
M/S.
Tie ring / master reing to be provided at top Closed
SENGHANI
Rain water accumulated below reinforcement to be dewater M/S.
Closed
before concreting SENGHANI
All Quality documents has been verified and found M/S.
Closed
satisfactory SENGHANI
Steel has been found placed on soil and emebeded in M/S.
Closed
mud ,concrete floor or stand has been provided SENGHANI
At core portion of Shear wall Notch or chavi impression to be M/S.
Closed
made before setting of concrete at along the length of wall SENGHANI
M/S.
Material found kept placed haphazardly on pathway Closed
SENGHANI
M/S.
Lapping is found in confinement zone Closed
SENGHANI
extra reinforcement to be provided at diagonally of same dia. M/S.
Closed
at sleeves top & bottom SENGHANI
M/S.
Not complying IS 516-1959 clause 5.6 Closed
SENGHANI
not complying 100% compressive strenth at 28 days for M70 M/S.
Closed
grade of concrete SENGHANI
M/S.
One pour card having two nos. 54 & 55 are found Open
SENGHANI
M/S.
Additional rows to be added for Remark in pour card Open
SENGHANI
COMPLIANCE STATUS CHECKED BY
REMARKS BY RUNWAL PROJECT TEAM
Verified
Photo attached
Verified
Verified
Verified
Verified
Photo attached
Photo attached
Photo attached
Verified
Photo verified
Verified
Verified at site
Further Cutting shall
be done accordingly
Verified
Verified
Verified
Verified
Confirmed by site
Runwal staff
Confirmed by site
Runwal staff
Assured by Site
reunwal staff
Verified by Photo
Confirmed by site
Runwal staff
Confirmed by site
Runwal staff