GLOBAL PAVING Lean Transformation

BUILT IN QUALITY : First step to lean transformation

24-Maggio-2016
Caterpillar confidential: Green
EAME Marketing 2003
1
GLOBAL PAVING Lean Transformation

Road building, Mining, Construction, Power Generation,


Diesel Engines, Natural Gas Engines, Industrial Gas Turbines,
Forestry, Railways, Marine Propulsion, Petroleum – Oil & Gas,
Material Handling, Landfill, Pipelaying

Leader di mercato in 18 Primary Industries

Caterpillar confidential: Green


EAME Marketing 2003
2
GLOBAL PAVING Lean Transformation

Prodotti

More than 300 products distributed in 180 countries

Caterpillar confidential: Green


EAME Marketing 2003
3
GLOBAL PAVING Lean Transformation
Caterpillar, Inc. Worldwide

Manufacturing facilities
Dealer main stores
Office and other facilities
FG Wilson, MaK, Perkins and Solar distributors

Caterpillar confidential: Green


EAME Marketing 2003
4
GLOBAL PAVING Lean Transformation

Prodotti Worldwide • 7 Platforms


• 70 Models

Asphalt Pavers
Soil Compactors Asphalt Compactors

Rotary Mixer
Pneumatics Cold Planers

Utility Compactors

Caterpillar confidential: Green


EAME Marketing 2003
5
GLOBAL PAVING Lean Transformation

Utilizzo dei nostri prodotti

Caterpillar confidential: Green


EAME Marketing 2003
6
GLOBAL PAVING Lean Transformation

Managing volume and


Global Paving – Minerbio - Italy complexity

•Il pdp
Minerbio (BO)

Cattolica (RN)

Caterpillar confidential: Green


EAME Marketing 2003
7
GLOBAL PAVING Lean Transformation

Corporate: i passaggi fondamentali

2013 Lean Transformation

Caterpillar confidential: Green


EAME Marketing 2003
8
GLOBAL PAVING Lean Transformation

Example : Order to Deliver Lead Time evaluation


Company A
Ship Long Lead Times

Engine
Castings
Assy.
Sub/Final Cat Inv Dealer Inv
Assembly 1 Month 3 - 4 Months
Castings
Lower Powertrain
Bearings

Forgings Gears

Company B Castings
Engine
Assy Dealer Inv
Assy
2 – 3 Months
Drive-
Forgings/Gears
train
Time
6 4 3 2 1 0 -1 -2 -3 -4
Dec. 18, 2013 Caterpillar: Confidential Yellow 9
Caterpillar confidential: Green
EAME Marketing 2003
9
GLOBAL PAVING Lean Transformation

Symptoms … Product Example


Sales to Users Synchronized Supply
& Demand : S&OP
Production Execution
Inventory Build (Over Production)

Mar Jun Sep Dec Mar Jun Sep Dec

Dec. 18, 2013 Caterpillar: Confidential Yellow 10


Caterpillar confidential: Green
EAME Marketing 2003
10
GLOBAL PAVING Lean Transformation

Symptom  Opportunities Examples

•Inbound
• Supplier Delivery Performance
• Eng. & Mfg. Changes
• Cost for Premium Freight
•Internal
• Forecast Accuracy
• Rework, Repair and Scrap
• Lead Time
•Outbound
• Defects @ 12 Months found on the field
• Warranty cost
• Finished Inventory level

Caterpillar confidential: Green


EAME Marketing 2003
11
GLOBAL PAVING Lean Transformation

Lean Approach Prioritized


approach
- Foundational Process Capability
- Lean Vision is … Synchronized Supply & Demand
Step 5 Manpower

2nd Priority
- Enabled by 5 Principles Utilization

Step 4 Capital Utilization

Step 3 Short Lead Time

1st Priority
Step 2 Right Part, Right Time

Step 1 Built in Quality “Clean your own


Caterpillar confidential: Green/Yello/red (Zero missed defects, no rework) house first”
EAME Marketing 2003
12
GLOBAL PAVING Lean Transformation

BUILT IN QUALITY
BUILT IN QUALITY è il principio fondamentale della LEAN

Lo scopo del BUILT IN QUALITY è quello di FERMARE I DIFETTI PERSI

(MISSED) e raggiungere lo ZERO REWORK & SCRAP in tutti i processi in


tutto il flusso della VALUE STREAM.

13
Caterpillar confidential: Green
EAME Marketing 2003
13
GLOBAL PAVING BUILT IN QUALITY Lean Transformation

PASSI IMPLEMENTAZIONE : Funzionamento BIQ :


1. Stabilire un obiettivo Built In Quality (BIQ) 1. Stop
2. Conoscere gli obiettivi di qualità di tutti i clienti interni 2. Descrizione problema
ed esterni
3. Classificazione (dif. interno, esterno)
3. Definire lavoro / processi necessarie e la sequenza
4. Risposta
4. Definire i gruppi di processo e le posizioni della QG
5. Soluzione Problema
5. Installare QG (Capacità di fermare)
• componenti QG
• creare e gestire checklists
6. Descrivere sintomo, documentare la descrizione del
problema e ordinarlo
7. Sviluppare e implementare la comunicazione / cicli di
risposte (anelli di retroazione)
8. Eseguire RCCA
9. Implementare il monitoraggio del processo

Caterpillar confidential: Green


EAME Marketing 2003
14
GLOBAL PAVING Lean Transformation

Quality Problem Solving


= defect
Two Concepts
Concept 1. Acqua (processo) diventa un lago
Their area
My area

Bad Flow
Concept 2. Acqua (processo) scorre come un fiume

Customer
My area

Good Flow Dec. 18, 2013


Their area
Caterpillar: Confidential Yellow 15
Caterpillar confidential: Green
EAME Marketing 2003
15
GLOBAL PAVING Lean Transformation
BIQ – A Holistic Approach to Culture Change Product
Engineering
Extended Product Value Stream
Global
Purchasing Mfg
Engineering
= BIQ Quality Gate
Component
Operations

Suppliers
S & OP Supply Chain
Demand Mgmt
Scheduling Prime Product
Operations

Built In Quality Methodology


1. Break the pipe into smaller pieces
Customer
2. Install gates to stop defect flow at source (Stop
Function)
3. Stop creating defects (Prob Desc, Sort, Feedback,
RCCA)
4. Repeat process at all pain points.
Caterpillar confidential: Green
EAME Marketing 2003
16
GLOBAL PAVING Lean Transformation
Cos’e’ Built In Quality?
100% Required Quality
Non- BIQ BIQ Based on Check list
(progettazione del sistema)

1. Fermare Difetto
2. Retroazione
Anello Chiuso 3. Correggere il processo
Anello Aperto Malfunzionante

Quality Gate
???

Transition to IPV / Transizione agli IPV


Nessuna conferma, nessun apprendimento (STESSA QUALITÀ A BASSO COSTO )

Perenne lotta all’incendio IPV

Caterpillar confidential: Green


EAME Marketing 2003
17
GLOBAL PAVING Lean Transformation

DEFINIZIONE DI DIFETTO:

L’operatore NON è in grado di usare le


informazioni / parti / etc che riceve da altri, per
l’uso atteso, SENZA alcun intervento
(comunicazione, chiarimento, riparazione,
scarto, ottenere aiuto, ecc)

Caterpillar confidential: Green


EAME Marketing 2003
18
GLOBAL PAVING Lean Transformation

CLASSIFICAZIONE DIFETTO

Un DIFETTO MISSED (PERSO) è un difetto NON identificato nella


Quality Gate, ERA nella Checklist per quel gruppo di processo
ed avrebbe dovuto essere rilevato ma è stato passato alle
successiva operazione.

Caterpillar confidential: Green


EAME Marketing 2003
19
GLOBAL PAVING Lean Transformation

CLASSIFICAZIONE DIFETTO

Un DIFETTO NEW (NUOVO) è un difetto che è stato RILEVATO IN


QUALITY GATE che NON era sulla Checklist. Questi devono
essere valutati per l'inclusione nella Checklist dell’ appropriato
punto di controllo.

Caterpillar confidential: Green


EAME Marketing 2003
20
GLOBAL PAVING Lean Transformation

CLASSIFICAZIONE DIFETTO

Un DIFETTO FOUND (RILEVATO) è un difetto individuato nella


Quality Gate ed era nella Checklist per tale gruppo di attività.

Caterpillar confidential: Green


EAME Marketing 2003
21
GLOBAL PAVING Lean Transformation

Definizione di DIFETTO INTERNO & ESTERNO

Scopo = Processo raggruppato

Quality Gate

Processo
Interno

XYZ
Esterno

Difetto Interno Il Difetto si è verificato all'interno del mio gruppo di processo


( La mia area )

Difetto Esterno Il Difetto si è verificato al di fuori del mio gruppo di processo


( La loro area )

Caterpillar confidential: Green


EAME Marketing 2003
22
GLOBAL PAVING Lean Transformation

Board
example

Caterpillar confidential: Green


EAME Marketing 2003
23
GLOBAL PAVING Lean Transformation
BOARDS example

Caterpillar confidential: Green


EAME Marketing 2003
24
GLOBAL PAVING Lean Transformation

“FOUND, MISSED & NEW” CHART

T0 T 0+1 T 0+2

Caterpillar confidential: Green


EAME Marketing 2003
25
GLOBAL PAVING Lean Transformation
“FOUND, MISSED & NEW” CHART

MISSED

T0 T 0+1 T 0+2

Caterpillar confidential: Green


EAME Marketing 2003
26
GLOBAL PAVING Lean Transformation
“FOUND, MISSED & NEW” CHART

NEW

T0 T 0+1 T 0+2

Caterpillar confidential: Green


EAME Marketing 2003
27
GLOBAL PAVING Lean Transformation
“FOUND, MISSED & NEW” CHART

FOUND

T0 T 0+1 T 0+2

Caterpillar confidential: Green


EAME Marketing 2003
28
GLOBAL PAVING Lean Transformation

DOMANDE ?