COMPLESSI DI COGENERAZIONE
Marcello Laviani
Responsabile Costruzioni
Enel Ingegneria e Ricerca
Engineering, Procurement and Construction
Structure
~750 Resources
Technical Staff
Safety
Project Control Project
Quality Assurance EPC Management
Dpt.
Feasibility studies
Bids management
Process design
Machinery and Boiler Negotiations
Safety
Effluent treatment Contracts awarding
Main Scheduling & Cost Control
Instruments and control Vendor rating
duties Construction supervision
Layout & Piping Vendor scouting
Civil Commissioning & Start-up
Expediting
Electrical systems
Supply follow-up
Safety Engineering
2
Engineering, Procurement and Construction
Main Projects Reftinskaya (3800 MW CFPP):
-DARS
- Unit 5 (300 MW)
- Unit 4 (300 MW)
- Unit 7 (500 MW)
Great Island CCGT
Sredneuralskaya CCGT
(430 MW)
(450 MW)
Legenda:
NPP: Nuclear Power Plant
CFPP : Coal Fired Power Plant
CCGT: Combined Cycle Gas Turbine
LNG: Liquef. Natural Gas
DARS: Dry Ash Removal System Guarantee Porjects under Support serrvices
management development
3
Planning methodology and assembly and erection control
Principles of project planning
WBS – Work Breakdown Structures
Breakdown by Geography: Zone, Unit, Area …
Breakdown by System: Steam, Water, Auxiliaries, KKS …
Breakdown by Discipline: Civil, Mechanical, Engineering, Construction …
Breakdown by Commerce commodities: Cables, Valves …
Specs
BASIC DESIGN
PFDs Specs
P&IDs P&IDs
Specs Info Drawings
Data Sheets Data Sheets
CONSTRUCTION
DETAILED DESIGN
Drawings & ERECTION
5
Planning methodology and assembly and erection control
Principles of project planning
Identification of LLI – Long Lead Items
A CCGT power plant
GT 18-20 months
Condenser 16 months
FW pumps 14 months
Other items
7
Planning methodology and assembly and erection control
Principles of project planning
Critical Path - 1/2
Critical paths: CCGT
Project schedule:
o Critical paths (CP): direct and strong impact on
project achievement;
o Other paths: easy to manage and not requiring
specific preliminary actions
8
Planning methodology and assembly and erection control
Principles of project planning
Check list of constructability
Check of factors influencing the construction in all project phases:
o Weather conditions.
o Level of prefabrication;
o Preliminary works.
Direct subcontract:
o only one subject directly involved and motivated to perform in the project;
o contractor may or may not sub-subcontract part of the works (Italian law ….)
Joint ventures:
o a specific company is created for the scope of the project;
o two or more subjects directly involved and motivated to perform in the project;
o co-operation of subjects with different backgrounds leads to increase the know-how in
technical and managerial fields;
Consortia:
o community directly involved and interested in building the power plant;
o direct involvement of the region in building PP leads to an easy welcome of the project;
10
Planning methodology and assembly and erection control
Assembly and erection planning – 2/2
Progress control
12
Supply Chain Management
SCM for a General Contractor
13
Supply Chain Management
Materials
Bulk materials:
o concrete, piping, cables …
o not itemized materials and components.
14
Supply Chain Management
Monitoring of Bulk quantities during project development
Materials
Cost
Book
Work
DESIGN
CONSTRUCTION
Safety;
Tender, Contracts (works &
Quality;
materials requisitions), Design, Management of
Construction…. Costs;
Time
Supply Chain Management
Material Tracking and quantity monitoring
Kg steel,
Mc concrete, BoQ BoM
Km cables,
Km pipes….
Driver Bulk
Items items
Project Manager,
Cost Controller, • Control Times and Costs
Planner • Control Progress
ENG CON
• Give BoQ, BOM
• Supports CPC in Planning
• Give Driver Qty by Engineering construction activities
WBS
• Manages the
• Estimate driver quantities Subcontractors, controls
forecast to complete adequate resources are
• Estimate release dates of provided
documents • Update subcontractor
productivity 17
Supply Chain Management
Time and costs control
Feasibilities curves – 1/3
Feasibility study:
o Schedule of Engineering: For Construction (FC) documents
o Schedule of Construction: FC documents availability + Delivered materials + manpower capacity
18
Supply Chain Management
Time and costs control
Feasibilities curves – 2/3
Actual data:
o Engineering: Analysis of delay Monitoring with several tools:
3d Model, SmartPlant Material
o Construction: Analysis of delay
(SPM) …
o Project Team: Need of common recovery plan
19
Supply Chain Management
Time and costs control
Feasibilities curves – 3/3
Recovery plan:
o Engineering: Decrease of delay thanks to ENG actions New feasibility with several
tools: 3d Model, SPM …
o Construction: Decrease of delay thanks ENG and COS actions
20
Supply Chain Management
Criticalities – 1/2
For LLI:
o Long bid, delivery and erection time Pre-contract agreement (see CP of CCGT);
o Need to anticipate some civil works Early works (e.g. engineering of boiler and
boiler foundations for CFPP or engineering of diaphragm for cryogenic tank for LNG –
Liquefied Natural Gas)
For bulk materials:
o Long time to complete engineering DD Frame agreement or Blanket Orders;
o Quantities monitoring to find new object on time Strict material control;
o Long delivery time Massive purchase with buy back clauses;
o Availability of right material Prefabrication / erection feasibility;
21
Supply Chain Management
Criticalities – 2/2
Material managements and erection feasibility
22