Subyek : Application For Employment Position : ELECTRICIAN / INSTRUMENT I. IDENTIFICATION NAMA : SARYONO Place / Date of Birth : Cilacap, February 11, 1976 Sex : Male Marital Status : Married Religion : Moslem Final Education : Technical High School (STM N Cilacap) Address : Jl. Rajiman RT. 05 / RW 12 Gunungsimping Cilacap - Central Java Phone / FVF : 082135954720 Email : saryono.elc@gmail.com II. WORK EXPERIANCE No COMPANY/ LOCATION PERIOD OF POSITION DETAIL OF JOB SERVICE 1 PT WIKA REKAYASA July 03, 2017 – January Foreman - Install Conduit, Cable Tray, KONTRUKSI 25, 2018 Instrument Termination For Instrument Process EPCC Panas Bumi Karaha Electric - Install Instrument equipment (PT, TT; Tasik Jawa Barat LT, etc) - Termination cable motor, mcc panel, dcs panel, etc - Pre Commissioning 2 PT WIKA REKAYASA April 26, 2017 – June Foreman - Install Conduit, Cable Tray, KONTRUKSI 25, 2017 Instrument Termination For Instrument Process EPCC Panas Bumi Karaha electric - Install Instrument equipment (PT, TT; Tasik Jawa Barat LT, etc) - Termination cable motor, mcc panel, dcs panel, etc 3 PT WIKA REKAYASA January 12, 2017 – Instrument - Panel Instrument DCS Room KONSTRUKSI April 25, 2017 &electrical - Motor, JB Instrument PT RUM Sukoharjo Solo Termination - Equiptment Instrument (TT, LT. ect) - Panel MCC Room 4 PT GLOBAL SARANA August 03, 2016 – Technician - Install Conduit, Cable Tray, SUKSES December 31, 2016 Instrument Termination For Instrument Process Unilever Medan - Install Instrument equipment (PT, TT; LT, etc) - Continuity and loop check instrument equipment 5 PT BERKAT KARUNIA March 03, 2016 – July Instrument - Install Conduit, Cable Tray, PHALA 1, 2016 Electrical Termination For Instrument Process Oki Pulp & Paper Mill Project - Install Instrument equipment (PT, TT; Palembang LT, etc) - Continuity and loop check instrument equipment 6 PT TRUBA JAYA October 15, 2015 – Skill 1 Electrical - Install Conduit, Install Cable Tray For ENGINEERING February 29, 2016 Instrument Electrical Process Job T 5105 Indocement Bogor 7 PT. INDOMITRA JAYA Jan. 07, 2015 to Sept. Electrical Senior - Installation, Conduit, Pulling Cabel PERKASA I X 660 MW 09, 2015 Leader Lighting System FCSPP Phase II Expansion - Instalation Panel Lighting Project Cilacap 8 JGC INDONESIA — JGC May 07, 201] to Nov. Facility - Operation Genset Corporation Consortium 15, 2014 Maintenance - Installation Sincronics System at DSLNG Project Bangai Leader Panel Power Suppply Temporary SULTENG - Troble Shooting, Maintenance Genset and Pannel Power Supply Temporery 9 LEIGHTON Nov. 10. 2007 to Dec. Electrical - Setting panel, pulling cable, and CONTRACTING W.L.L. Al 16, 2010 Foreman termination MSB SMDB, MCC Shaqab Equestrian Project, panel, LMCP, DB-LP, DB-PP, DB- Qatar. UPP andTransformer 11KV/415 V. - Setting panel, pulling cable, and termination BMS (Building Management System). - Install MICC (Magnesium Insulation Copper Cable) For lighting and soeket outlet in substation room. 10 PT. Mc DERMOTT August 22, 2006 to Process Elec / - Install Support Tray Cable, Tray INDONESIA Woodside June 16,2007 Inst.Craftsman Cable Energy NWS LNG-V - Pulling Cable Expansion Project, Batam. - Termination Cable, Grounding Cable 11 PT. ODG WORMALD Feb. 03, 2006 to May Electrician - Pulling, Cont inity. Merger and INDONESIA LNG Project 03,2006 Termination Cable Teluk Bintuni, Papua - Setting Panel, Grounding, Test Grounding 12 PT. WASA MITRA Oct. 27. 2005 10 Feb. Foreman - Install Lighting Building Lighting ENGINEERING 2 x 300 MW 01,2006 Electrical Road, Hoist Crane and Telephone CFPP Project Cilacap 13 PT. WASA MITRA Mar. 28, 2005 to Oct. Skill Electrical - Install Conduit, Pulling and ENGINEERING PLTU 25, 2005 Terminator Cable to Panel Lighting Tanjung Jati "B" Jepara 14 PT. ESKA ENGINEERING Nov. 12,2004 t0 2004 Electrician - Pulling Cable, Install Lighting, Wisma Mulia Project, Jakarta Feb. 24, 2005 Receptacle - Pulling and Connection High Voltage Cable 15 PT. Mc DERMOTT April 25, 2003 to May Process Electric - Fabrication Support Tray, Install INDONESIA Belanak FPSO 24, 2004 Instrument Tray Project, Batam. - Pulling cable, Connection Equipment Instr. - Instrument, JB. Insrument, Panel Instrument 16 PT. ACE DEVELOPMENT Oct. 05,2001 to Jan. Electrician - Fabrication Support Tray Cable INDONESIA PT.ilsam Global 15,2002 - Install Tray, Pulling, Merger, Indonesia, Bekasi Countinity, Grounding, Connection Cable to Panel - Commissioning 17 PT. ACE DEVELOPMENT Mar. 09,2001 to Oct. Electrician - Install Tray, Pulling, Merger. INDONESIA PT. Jaeil 04, 2001 Countinity, Grounding, Connection Indonesia Cable to Panel – Comissioning - Setting Panel 18 PT. DAESUN INDONESIA Nov. 09, 2000 to Feb. Electrician - Instali Conduit and Support PT. Hanjung Indonesia, Bd. 09, 2001 Instrument - Pulling Cable Instrument, and Power Lampung - Conention Equipment Instrument and - Panel Power - Setting Panel RTGC Crane 19 PT DAESUN ENG. & Sept. 09, 1998 to Dec. Instrumen - Pulling Cable Instrument, Connection CONSTRUCTION . 19, 1998 Electrician JB Instrument and Setting Panel PetrochemicalKarawang, Instrument Indonesia 20 PT. NIKAWATEX Karawang June 12,1995 to Sept. Maintenance - Maintenance All Electrical Indonesia 08, 1998 Electrician Equipment The above information are true and please call me with respect to applicant