You are on page 1of 3

CURRICULUM VITAE

TO : HUMAN RESOURCES MANAGER


Subyek : Application For Employment
Position : ELECTRICIAN / INSTRUMENT
I. IDENTIFICATION
NAMA : SARYONO
Place / Date of Birth : Cilacap, February 11, 1976
Sex : Male
Marital Status : Married
Religion : Moslem
Final Education : Technical High School (STM N Cilacap)
Address : Jl. Rajiman RT. 05 / RW 12 Gunungsimping Cilacap - Central Java
Phone / FVF : 082135954720
Email : saryono.elc@gmail.com
II. WORK EXPERIANCE
No COMPANY/ LOCATION PERIOD OF POSITION DETAIL OF JOB
SERVICE
1 PT WIKA REKAYASA July 03, 2017 – January Foreman - Install Conduit, Cable Tray,
KONTRUKSI 25, 2018 Instrument Termination For Instrument Process
EPCC Panas Bumi Karaha Electric - Install Instrument equipment (PT, TT;
Tasik Jawa Barat LT, etc)
- Termination cable motor, mcc panel,
dcs panel, etc
- Pre Commissioning
2 PT WIKA REKAYASA April 26, 2017 – June Foreman - Install Conduit, Cable Tray,
KONTRUKSI 25, 2017 Instrument Termination For Instrument Process
EPCC Panas Bumi Karaha electric - Install Instrument equipment (PT, TT;
Tasik Jawa Barat LT, etc)
- Termination cable motor, mcc panel,
dcs panel, etc
3 PT WIKA REKAYASA January 12, 2017 – Instrument - Panel Instrument DCS Room
KONSTRUKSI April 25, 2017 &electrical - Motor, JB Instrument
PT RUM Sukoharjo Solo Termination - Equiptment Instrument (TT, LT. ect)
- Panel MCC Room
4 PT GLOBAL SARANA August 03, 2016 – Technician - Install Conduit, Cable Tray,
SUKSES December 31, 2016 Instrument Termination For Instrument Process
Unilever Medan - Install Instrument equipment (PT, TT;
LT, etc)
- Continuity and loop check instrument
equipment
5 PT BERKAT KARUNIA March 03, 2016 – July Instrument - Install Conduit, Cable Tray,
PHALA 1, 2016 Electrical Termination For Instrument Process
Oki Pulp & Paper Mill Project - Install Instrument equipment (PT, TT;
Palembang LT, etc)
- Continuity and loop check instrument
equipment
6 PT TRUBA JAYA October 15, 2015 – Skill 1 Electrical - Install Conduit, Install Cable Tray For
ENGINEERING February 29, 2016 Instrument Electrical Process
Job T 5105 Indocement Bogor
7 PT. INDOMITRA JAYA Jan. 07, 2015 to Sept. Electrical Senior - Installation, Conduit, Pulling Cabel
PERKASA I X 660 MW 09, 2015 Leader Lighting System
FCSPP Phase II Expansion - Instalation Panel Lighting
Project Cilacap
8 JGC INDONESIA — JGC May 07, 201] to Nov. Facility - Operation Genset
Corporation Consortium 15, 2014 Maintenance - Installation Sincronics System at
DSLNG Project Bangai Leader Panel Power Suppply Temporary
SULTENG - Troble Shooting, Maintenance Genset
and Pannel Power Supply Temporery
9 LEIGHTON Nov. 10. 2007 to Dec. Electrical - Setting panel, pulling cable, and
CONTRACTING W.L.L. Al 16, 2010 Foreman termination MSB SMDB, MCC
Shaqab Equestrian Project, panel, LMCP, DB-LP, DB-PP, DB-
Qatar. UPP andTransformer 11KV/415 V.
- Setting panel, pulling cable, and
termination BMS (Building
Management System).
- Install MICC (Magnesium Insulation
Copper Cable) For lighting and
soeket outlet in substation room.
10 PT. Mc DERMOTT August 22, 2006 to Process Elec / - Install Support Tray Cable, Tray
INDONESIA Woodside June 16,2007 Inst.Craftsman Cable
Energy NWS LNG-V - Pulling Cable
Expansion Project, Batam. - Termination Cable, Grounding Cable
11 PT. ODG WORMALD Feb. 03, 2006 to May Electrician - Pulling, Cont inity. Merger and
INDONESIA LNG Project 03,2006 Termination Cable
Teluk Bintuni, Papua - Setting Panel, Grounding, Test
Grounding
12 PT. WASA MITRA Oct. 27. 2005 10 Feb. Foreman - Install Lighting Building Lighting
ENGINEERING 2 x 300 MW 01,2006 Electrical Road, Hoist Crane and Telephone
CFPP Project Cilacap
13 PT. WASA MITRA Mar. 28, 2005 to Oct. Skill Electrical - Install Conduit, Pulling and
ENGINEERING PLTU 25, 2005 Terminator Cable to Panel Lighting
Tanjung Jati "B" Jepara
14 PT. ESKA ENGINEERING Nov. 12,2004 t0 2004 Electrician - Pulling Cable, Install Lighting,
Wisma Mulia Project, Jakarta Feb. 24, 2005 Receptacle
- Pulling and Connection High Voltage
Cable
15 PT. Mc DERMOTT April 25, 2003 to May Process Electric - Fabrication Support Tray, Install
INDONESIA Belanak FPSO 24, 2004 Instrument Tray
Project, Batam. - Pulling cable, Connection Equipment
Instr.
- Instrument, JB. Insrument, Panel
Instrument
16 PT. ACE DEVELOPMENT Oct. 05,2001 to Jan. Electrician - Fabrication Support Tray Cable
INDONESIA PT.ilsam Global 15,2002 - Install Tray, Pulling, Merger,
Indonesia, Bekasi Countinity, Grounding, Connection
Cable to Panel
- Commissioning
17 PT. ACE DEVELOPMENT Mar. 09,2001 to Oct. Electrician - Install Tray, Pulling, Merger.
INDONESIA PT. Jaeil 04, 2001 Countinity, Grounding, Connection
Indonesia Cable to Panel – Comissioning
- Setting Panel
18 PT. DAESUN INDONESIA Nov. 09, 2000 to Feb. Electrician - Instali Conduit and Support
PT. Hanjung Indonesia, Bd. 09, 2001 Instrument - Pulling Cable Instrument, and Power
Lampung - Conention Equipment Instrument and
- Panel Power
- Setting Panel RTGC Crane
19 PT DAESUN ENG. & Sept. 09, 1998 to Dec. Instrumen - Pulling Cable Instrument, Connection
CONSTRUCTION . 19, 1998 Electrician JB Instrument and Setting Panel
PetrochemicalKarawang, Instrument
Indonesia
20 PT. NIKAWATEX Karawang June 12,1995 to Sept. Maintenance - Maintenance All Electrical
Indonesia 08, 1998 Electrician Equipment
The above information are true and please call me with respect to applicant

Your Sincerely

SARYONO