You are on page 1of 11
Raychem EPKT17C3XIH1-B09D311G56 QTY. 1 PC INDOOR TERMINATION FOR, PLASTIC CABLE, 12 TO 17.5 KV -3 CORE 95MM2 TO 240 MM2 TAIL LENGTH 450MM COPPER COMPRESSION LUGS 95MM2 SOLDERLESS EARTH CONNECTION RIGHT ANGLED INSULATING BOOTS KIT TABLE OF CONTENT 1 X 402w236/S 3 Leg.Cable Breakout 3 X HVOT-38/12-520/U Insulating Tubing(RED) 3 X SCTM-38/16-160/U(S3) Stress Control Tubing 3 X S-1189-1-100(A3) Yellow Filling Tape 4X $-1085-1-300 Sealant Tape (RED) 3 X $-1085-1-200 Sealant Tape (RED) 3 X 227R056-103/89 Insulating Boots 3 X S-1061-8-100 Mastic Tape 6 — X $-1061-8-200 Mastic Tape 3 X EPPA034.8 Roll Spring 3X EPPA-013-1-400 Copper Braid 3 X HEL-70130A Copper Lugs 98mm2 1 X ESD-5598-10/10 Installation Instruction 1 X ESD-8599-10/10 Installation Instruction Tyco Electronics Raychem GmbH LoT -KIT1607091 Energy Division, DATE : 25.07.2016 Finsinger Feld 1 D-85521 Ottobrunn,Germany Before Starting ‘Check to ensure that the kit you are going to use fits the cabie. Refer to the kit label and the title of the installation instruction. Components or working steps may have been improved since you last installed this product. Carefully read and follow the steps in the installation instruction. General Instructions Use a propane (preferred) or butane gas torch. Ensure the torch is always used in a well-ventilated environment. Adjust the torch to obtain a soft blue flame with a yellow Pencil-ike blue flames should be avoided. Keep the torch aimed in the shrink direction to preheat the material. Keep the flame moving continuously to avoid scorching the material. Clean and degrease all parts that will come into contact with adhesive. fa solvent is used follow the manufacturer's handling instructions. Tubing should be cut smoothly with a sharp knife leaving no jagged edges. Start shrinking the tubing at the position recommended in the instruction. Ensure that the tubing is shrunk smoothly all around before continuing along the cable. ‘Tubing should be smooth and wrinkle free with inner components clearly defined. ‘The Information contained in these installation instructions is for use only by installers trained to make ¢lecitical power installations and is intended to describe the correct mathod of insiallation for this product. However, Tyeo Electronics nas no control aver the fied conditions which influence product installation. {tis the user's responsiblity to determine the sultabilty of the instalation method inthe user’ feld conditions, Tyco Electronics’ only obligations are those in Tyoo Electronics’ standard Conditions of Sale for this product 2nd in no case will Tyco Electronics be liable for any other incidental, indirect ar consequential damages arising from the use or misuse of the products, Raychem, TE Logo and Tyco Electronics are trademarks. ES0-5598-10/10 Page 2/7 Energy Division Tyco Electronics Installation Instruction ESD-5598-10/10 Raychem Termination for Screened 3-Core Polymeric Insulated Cables 7.2 KV to 36 kV ‘Tyco Electronics Raychem GmbH Energy Division Finsinger Feld 1 89521 OttobrunniGermany (0049-89-6089-0 tel (0049-89-6096.345 fax hitpstenergy tyeoalectronics.com Cable Preparation (after installation of gland assembly) b. Cable with metal tape shield Table 2 4 1 1 b K Max. system indoor indoor outdoor vatage straight crossed connection connection kV] Imm} [mm] fmm] fmm 72 250 450 450130 12 300 450 BO 190'_. Aoeorana te depth of cable 75 350 500) 50190 “hag barrat 24, 450 550 800180. hole 36, 600 800 a00 210 aa *L= min. length required The actual length will be determined by the overall ceometry ofthe equipment. Bend and shape the cores into thelr aoa eee final position jeparate the cores. Attach the screen earthing braids to the copper tape icpbidnpanbereainsie bilan by fack solder or using roll springs, i suppliad in the kit Place a temporary wire binder around tne cores at distance b as shown in the

You might also like