You are on page 1of 1

Initial Filling Pumps Parameter Sheet

1.General
1.1 Two (2) sets of (1 working + 1 stand-by) motor driven boiler initial filling
pumps will be provided for start boiler.

1.2 The drive motor shall adopts AC frequency conversion motor.

1.3 Electrical Requirements

Voltage of the motor: 415 v

Voltage variation: +/-10%

Frequency: 50 HZ

Frequency variation : -5~3%

2.Initial filling pump flow and head calculation

A) Flow/system (system =1 PH boiler + 1AQC boiler)


SI.no Description Unit Qty
3
1 Boiler operation cubage m 126930
2 The time of fill water hr 4
2 Flow: [Boiler MCR flow×1.10(peak)×1.03(3% blow down)
kg/hr 39.55
×1.10(margin)]
3 Initial filling water Temperature deg 25
3
4 Initial filling water Density kg/ m 997
3
5 Selected flow m /hr 39.67

B) Pressure
SI.no Description Unit Quantity
2
1 Static head kg/cm 6
2
2 Filling line control valve pressure drop kg/cm 4
2
3 Other losses kg/cm 2
2
4 Head kg/cm 12
5 Selected Head [(12×1.05×10000)/density] mwc 126.38

You might also like