You are on page 1of 3

INNOVATIVE BUSINESS ARENA

62/1, Shahid Tajuddin Ahmed Sharoni


Mahakhali, Dhaka-1212, Bangladesh
Phone: +8802-9891967, Mobile: +8801712171237
E-mail: ihtareq@yahoo.com, Skype: ihtareq
IB ARENA- The Name Of Assurance For Commitment
----------------------------------------------------------------------------------------------------------------------------------------------

DATA SHEET FOR Exhaust Gas Treatment (EGT) SYSTEMS


Innovative Business Arena is first and only company in Bangladesh who has proven successful
experience to complete EPC for EGT system in 55 MW HFO Power Plant. We are giving
guarantee of our products quality, performance and life time as per requirement of clients need.

Compare to any foreign company our specially is to build EGT or FGD as per customer
requirements. Customized EGT or FGD will reduce your huge cost and give more efficient output
as you expect.

Please send below queries for our experienced engineer team calculation as well as offer you most
effective and best competitive EGT system:

SL. Project Description Details


No.
Project Name
Project Location
Project Capacity
Project Status
Technical Description Number Parameters
01. Quantity of Engine
02. Engine Specification
Engine Capacity (With Model)
Fuel
Fuel consumption per hour/Engine
Fuel minimum Grade (Please attach fuel
specification sheet)
Exhaust Gas Flow (Cubic Meter/hr)/All Engine
Exhaust Gas Temperature (Deg C Through
Boiler) /All Engine
Exhaust Gas Temperature (Deg C Without Boiler)/
All Engine
Exhaust Gas Composition (V/V%)
Each Engine Back Pressure allowed by
manufactures (bar)
Each Engine Turbo Charger temperature range
allowed by manufactures (deg C)
CO2 contain per engine/hr
O2 contain per engine/hr
H2O contain per engine/hr
SOX contain per engine/hr
NOX contain per engine/hr
CO contain per engine/hr
NO contain per engine/hr
03. BOILER
IBA – The name for building strong
INNOVATIVE BUSINESS ARENA
62/1, Shahid Tajuddin Ahmed Sharoni
Mahakhali, Dhaka-1212, Bangladesh
Phone: +8802-9891967, Mobile: +8801712171237
E-mail: ihtareq@yahoo.com, Skype: ihtareq
IB ARENA- The Name Of Assurance For Commitment
----------------------------------------------------------------------------------------------------------------------------------------------
BOILER Brand (With Brand WHRB )
Number of boilers
CAPACITY
HP
STEAM FLOW PER BOILER
HP
STEAM TEMPERATURE HP
EXHAUST GAS PRESSURE DROP (CLEAN)
04. THERMAL INPUT DATA
EXHAUST GAS FLOW/ENGINE
EXHAUST GAS TEMPERATURE IN/Engine
EXHAUST GAS TEMPERATURE OUT, ECO/Engine
EXHAUST GAS TEMPERATURE OUT, LP/Engine
TEMPERATURE IN FEED WATER TANK
CONDENSATE TEMPERATURE
MAKE UP WATER TEMPERATURE
HP EVAPORATING PRESSURE
STEAM PRESSURE AFTER SUPERHEATER
05. EXHAUST FLOW RATE
EXHAUST FLOW RATE /Engine
06. NOx Emission
NOx Emission Concentration/Engine
Exhaust flow rate/Engine
Expected Emission Minimum Target %/Engine
07. SO2 EMISSION
FUEL CONSUMPTION/Engine
SULPHUR CONTENT IN THE FUEL/Engine
TOTAL SULPHAR CONTENT PER YEAR/Engine
TOTAL SO2 EMISSION RATE/Engine
Expected Emission Minimum Target %/Engine
08. General Information
Maximum FGD Running Hours per day/All Engine
Minimum SO2 Removal Ratio (%)/Engine
Minimum NOX Removal Ratio (%)/Engine
Minimum CO2 Removal Ratio (%)/Engine
Minimum CO Removal Ratio (%)/Engine
Minimum NO Removal Ratio (%)/Engine
Minimum O2 Increases Ratio (%)/Engine
Bi-product require or not
HFO /Oil Grade
Plant Status COD Date
09. Engineering Information
Distance from main Chimney to EGT Located
Place (Meter)
Water Supply Tank Distance From EGT Place
(Meter)
Electric Source To EGT DP Point Distance (Meter)
IBA – The name for building strong
INNOVATIVE BUSINESS ARENA
62/1, Shahid Tajuddin Ahmed Sharoni
Mahakhali, Dhaka-1212, Bangladesh
Phone: +8802-9891967, Mobile: +8801712171237
E-mail: ihtareq@yahoo.com, Skype: ihtareq
IB ARENA- The Name Of Assurance For Commitment
----------------------------------------------------------------------------------------------------------------------------------------------
Damper Hydraulic System to main Chimney
Distance (Meter)
Sludge Treatment WTP Distance From EGT place
(Meter)
Chimney Dia & Height
10. Requirement
Do you Want to Run EGT 24hX365 Days?
If you want to run EGT occasionally than how
many hours in a week maximum?
Do you want to recycle used water & chemical for
EGT system?
Do you need full Automated or Semi-Automated
EGT System?
Do you need PLC System separated from you
main PLC of Plant?
Do you want to store bi-product?
Do you allow 3 in 1 Scrubber system?

Note: Including above information Please provide below documents and information for our accurate
assistance.

1. Nos. of Engine:
2. Nos. Of Boiler:
3. Damper detail design;
4. Turbine details;
5. Plant Layout;
6. P&ID;
7. Engines Brochure;
8. Boiler Brochure; and
9. Exhaust Design;
10. Water Source and WTP Distil water analysis report;
11. Soil Test Report.

Thank you for your kind cooperation and we will send you offer on basis of above
information within 10 working days from the date of received this Data Sheet to our end.

IBA – The name for building strong

You might also like