Project Management:
1. What is meant by project planning? Write down the importance of project planning.
13,11,10,08
2. What are the objectives of a small project? 08
3. Why planning is necessary. Describe various steps for planning a project. 08
4. What are the basic ingredients in project management? Describe different management
functions and activities. 10
Linear Programming:
1. What do you mean by linear programming? Write down the common characteristics of
linear programming. 15,14,13,10
2. Write down the assumptions of linear programming. 13
Specifications:
1. Define specification. What are the objectives of specifications? 15,14,13,11,08
2. What is open & close specification? Write down the advantages & disadvantages of
closed/restricted specifications. 15,14,13,09,08
3. Distinguish between:
i. Open & closed specification. 11
4. Write short notes on brief specifications. Give an example. 15,14,13,11,09,08
5. What are the rules for writing of specifications? 12
Construction Equipment:
1. What is construction equipment? What are the factors to be considered in selecting the
particular type of construction equipment? 15,13,10
2. Write short notes on heavy civil engineering equipments. Give a brief introduction and
application of the following equipments.
i. Pile driver. 15,14
ii. Pay loader. 14
iii. Power shovel. 15,14,13,08
iv. Percussion drilling. 08
v. Ripper. 15,13,12,11,09
vi. Bull dozer. 13,11
vii. Chain dozer. 12,10
viii. Drag line. 12,10
ix. Dump truck. 11,09
x. Hoist. 10
xi. Mobile crane. 09
3. Name the machines used for excavation works. 08
Updating:
1. What is meant by updating? 11,09,08
2. Why is updating essential? 09,08
3. What are the data required for updating? 12,11,09
*****