This document outlines development controls and formulas to calculate permissible construction metrics for a plot of land measuring 56,269 square meters based on the National Building Code. It lists the maximum impervious surface area, minimum unpaved surface area, total open space area, maximum site occupancy percentage, gross floor area, and maximum allowable construction area for the site.
This document outlines development controls and formulas to calculate permissible construction metrics for a plot of land measuring 56,269 square meters based on the National Building Code. It lists the maximum impervious surface area, minimum unpaved surface area, total open space area, maximum site occupancy percentage, gross floor area, and maximum allowable construction area for the site.
This document outlines development controls and formulas to calculate permissible construction metrics for a plot of land measuring 56,269 square meters based on the National Building Code. It lists the maximum impervious surface area, minimum unpaved surface area, total open space area, maximum site occupancy percentage, gross floor area, and maximum allowable construction area for the site.
Development Controls Formula as per NBC Computed Area (in sq.
meters)
Maximum Allowable Impervious 20% x 56,269.00
11,253.80 sq.m Surface Area (ISA) (20% of Total Lot Area) Minimum Unpaved Surface 20% x 56,269.00 11,253.80 sq.m Area (USA) (20% of Total Lot Area) Total Open Space Area 40% of Total Lot Area 22,507.60 sq.m Maximum Allowable Percentage 60% x 56,269.00 33,761.40 sq.m of Site Occupancy (PSO) (60% of Total Lot Area) Gross Floor Area (GFA) of the 56,269.00 sq.m x 2.50 140,672.50 sq.m Building/Structure (TLA x FLAR) Maximum Allowable 33,761.40 sq.m + 11,253.80 sq.m 45,015.20 sq.m Construction Area (MACA) (PSO (60%) + ISA (20%)) 30.00 meters (or must follow the duly-approved BHL in the major zone it is part of.) Road Right-of-Way (RROW) Front Side Rear Width (meters) (meters) (meters) (meters)